Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “operator complexity”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,801 records · Page 100

STS-90 Day 08 Highlights

On this eighth day of the STS-90 mission, the flight crew, Cmdr. Richard A. Searfoss, Pilot Scott D. Altman, and Mission Specialists Richard M. Linnehan, Dafydd Rhys Williams and Kathryn P. Hire, and Payload Specialists Jay C. Buckey and James A. Pawelczyk continue to operate the 26 individual experiments designed to provide insight into the operation of the nervous system, the most complex and least well-known part of the human body. The STS-90 crew members have used themselves as test subjects in a variety of experiments associated with studying functions such as blood pressure regulation , balance, coordination and sleep patterns. They also have studied a variety of animals to gain additional insight into the effects of the weightless environment of space on the development and performance of the nervous system.

Source record↗

Advanced Electric Propulsion for Space Solar Power Satellites

The sun tower concept of collecting solar energy in space and beaming it down for commercial use will require very affordable in-space as well as earth-to-orbit transportation. Advanced electric propulsion using a 200 kW power and propulsion system added to the sun tower nodes can provide a factor of two reduction in the required number of launch vehicles when compared to in-space cryogenic chemical systems. In addition, the total time required to launch and deliver the complete sun tower system is of the same order of magnitude using high power electric propulsion or cryogenic chemical propulsion: around one year. Advanced electric propulsion can also be used to minimize the stationkeeping propulsion system mass for this unique space platform. 50 to 100 kW class Hall, ion, magnetoplasmadynamic, and pulsed inductive thrusters are compared. High power Hall thruster technology provides the best mix of launches saved and shortest ground to Geosynchronous Earth Orbital Environment (GEO) delivery time of all the systems, including chemical. More detailed studies comparing launch vehicle costs, transfer operations costs, and propulsion system costs and complexities must be made to down-select a technology. The concept of adding electric propulsion to the sun tower nodes was compared to a concept using re-useable electric propulsion tugs for Low Earth Orbital Environment (LEO) to GEO transfer. While the tug concept would reduce the total number of required propulsion systems, more launchers and notably longer LEO to GEO and complete sun tower ground to GEO times would be required. The tugs would also need more complex, longer life propulsion systems and the ability to dock with sun tower nodes.

Oleson, Steve↗

Engineered Solutions to Reduce Occupational Noise Exposure at the NASA Glenn Research Center: A Five-Year Progress Summary (1994-1999)

At the NASA John H. Glenn Research Center at Lewis Field (formerly the Lewis Research Center), experimental research in aircraft and space propulsion systems is conducted in more than 100 test cells and laboratories. These facilities are supported by a central process air system that supplies high-volume, high-pressure compressed air and vacuum at various conditions that simulate altitude flight. Nearly 100,000 square feet of metalworking and specialized fabrication shops located on-site produce prototypes, models, and test hardware in support of experimental research operations. These activities, comprising numerous individual noise sources and operational scenarios, result in a varied and complex noise exposure environment, which is the responsibility of the Glenn Research Center Noise Exposure Management Program. Hearing conservation, community noise complaint response and noise control engineering services are included under the umbrella of this Program, which encompasses the Occupational Safety and Health Administration (OSHA) standard on occupational noise exposure, Sec. 29CFR 1910.95, as well as the more stringent NASA Health Standard on Hearing Conservation. Prior to 1994, in the absence of feasible engineering controls, strong emphasis had been placed on personal hearing protection as the primary mechanism for assuring compliance with Sec. 29CFR 1910.95 as well as NASA's more conservative policy, which prohibits unprotected exposure to noise levels above 85 dB(A). Center policy and prudent engineering practice required, however, that these efforts be extended to engineered noise controls in order to bring existing work areas into compliance with Sec. 29CFR 1910.95 and NASA's own policies and to ensure compliance for new installations. Coincident with the establishment in 1995 of a NASA wide multi-year commitment of funding for environmental abatement projects, the Noise Exposure Management Program was established, with its focus on engineering approaches to reducing occupational and community noise exposure. The organization and mission of this Program were documented shortly after its inception, and individual programmatic components have been the subject of subsequent papers. This paper summarizes the status and accomplishments of the engineering aspects of the Program from a five-year retrospective viewpoint and includes a review of retrofit noise control solution strategies, which have not been previously documented.

Cooper, Beth A.↗

Emergency Medical Service

Lewis Research Center helped design the complex EMS Communication System, originating from space operated telemetry, including the telemetry link between ambulances and hospitals for advanced life support services. In emergency medical use telemetry links ambulances and hospitals for advanced life support services and allows transmission of physiological data -- an electrocardiogram from an ambulance to a hospital emergency room where a physician reads the telemetered message and prescribes emergency procedures to ambulance attendants.

Source record↗

Direct Drive for Low Power Hall Thrusters

Due to recent studies, NASA has initiated the development of a low power Hall thruster for discovery class missions. The potential advantages of a low power Hall thruster is primarily due to its high efficiency operation at low power and its lower complexity compared to ion engines. Direct drive is another method of reducing the complexity of a Hall thruster system while improving its efficiency. The technical challenges associated with this technology are reported. Additionally, the benefits of this technology are discussed based on parametric studies and mission analysis.

Dankanich, John W.↗

Integrated Vehicle Health Management (IVHM) for Aerospace Systems

To achieve NASA's ambitious Integrated Space Transportation Program objectives, aerospace systems will implement a variety of new concept in health management. System level integration of IVHM technologies for real-time control and system maintenance will have significant impact on system safety and lifecycle costs. IVHM technologies will enhance the safety and success of complex missions despite component failures, degraded performance, operator errors, and environment uncertainty. IVHM also has the potential to reduce, or even eliminate many of the costly inspections and operations activities required by current and future aerospace systems. This presentation will describe the array of NASA programs participating in the development of IVHM technologies for NASA missions. Future vehicle systems will use models of the system, its environment, and other intelligent agents with which they may interact. IVHM will be incorporated into future mission planners, reasoning engines, and adaptive control systems that can recommend or execute commands enabling the system to respond intelligently in real time. In the past, software errors and/or faulty sensors have been identified as significant contributors to mission failures. This presentation will also address the development and utilization of highly dependable sohare and sensor technologies, which are key components to ensure the reliability of IVHM systems.

Baroth, Edmund C.↗

Using Immersive Virtual Environments for Certification

Immersive virtual environments (VEs) technology has matured to the point where it can be utilized as a scientific and engineering problem solving tool. In particular, VEs are starting to be used to design and evaluate safety-critical systems that involve human operators, such as flight and driving simulators, complex machinery training, and emergency rescue strategies.

virtual reality software certification human-compu↗

Fault protection techniques in JPL Spacecraft

While every JPL spacecraft requires some unique mission specific fault protection, there are many requirements which are common to all spacecraft configurations. These consist of protecting command and data processing & attitude control computers, protection against communication loss with the spacecraft, ensuring that safe external and internal temperature levels are maintained, and recovery from power overloads. Additionally, most JPL spacecraft are equipped with a general-purpose 'Safe Mode' response algorithm which configures the spacecraft to a lower power state which is safe and predictable so that diagnosis of more complex faults can be addressed by the Operations Team. This paper details the generic application of fault protection techniques which are implemented into most JPL spacecraft designs.

fault protection↗

Progress of the NASA/USGS Lunar Regolith Simulant Project

Beginning in 2004 personnel at MSFC began serious efforts to develop a new generation of lunar simulants. The first two products were a replication of the previous JSC-1 simulant under a contract to Orbitec and a major workshop in 2005 on future simulant development. Beginning in 2006 the project refocused its efforts and approached simulant development in a new and more comprehensive manner, examining new approaches in simulant development and ways to more accurately compare simulants to actual lunar materials. This led to a multi-year effort with five major tasks running in parallel. The five tasks are Requirements, Lunar Analysis, Process Development, Feed Stocks, and Standards. Major progress has been made in all five areas. A substantial draft of a formal requirements document now exists and has been largely stable since 2007. It does evolve as specific details of the standards and Lunar Analysis efforts proceed. Lunar Analysis has turned out to be vastly more difficult than anticipated. After great effort to mine existing published and gray literature, the team has realized the necessity of making new measurements of the Apollo samples, an effort that is currently in progress. Process development is substantially ahead of expectations in 2006. It is now practical to synthesize glasses of appropriate composition and purity. It is also possible to make agglutinate particles in significant quantities. A series of minerals commonly found on the Moon has been synthesized. Separation of mineral constituents from starting rock material is also proceeding. Customized grinding and mixing processes have been developed and tested are now being documented. Identification and development of appropriate feedstocks has been both easier and more difficult than anticipated. The Stillwater Mining Company, operating in the Stillwater layered mafic intrusive complex of Montana, has been an amazing resource for the project, but finding adequate sources for some of the components remains a difficult problem. For example the ratio of clino- to ortho-pyroxenes in the Stillwater is not an exact match for lunar materials. One of the sources being examined as an alternative pyroxene source is the Bushveld Complex in South Africa. Standards have been a major success for the project. The Figure of Merit algorithms have been created, tested, and are being considered for an ISO standard. Agreement has been reached in the community about how to make many of the critical measurements. There remains much work to do: (1) driving down the cost of simulants remains a major obstacle; (2) documentation and cost data analysis have not kept up with progress; (3) educating users in the complexity of the lunar regolith and the use of simulants remains a major task. In summary the project has made enormous progress and is successfully placing simulant development and use on a rigorous, scientifically defensible, engineering basis.

Rickman, Doug↗

Automated Planning and Scheduling for Space Mission Operations

Research Trends: a) Finite-capacity scheduling under more complex constraints and increased problem dimensionality (subcontracting, overtime, lot splitting, inventory, etc.) b) Integrated planning and scheduling. c) Mixed-initiative frameworks. d) Management of uncertainty (proactive and reactive). e) Autonomous agent architectures and distributed production management. e) Integration of machine learning capabilities. f) Wider scope of applications: 1) analysis of supplier/buyer protocols & tradeoffs; 2) integration of strategic & tactical decision-making; and 3) enterprise integration.

scheduling↗

Pros, Cons, and Alternatives to Weight Based Cost Estimating

Many cost estimating tools use weight as a major parameter in projecting the cost. This is often combined with modifying factors such as complexity, technical maturity of design, environment of operation, etc. to increase the fidelity of the estimate. For a set of conceptual designs, all meeting the same requirements, increased weight can be a major driver in increased cost. However, once a design is fixed, increased weight generally decreases cost, while decreased weight generally increases cost - and the relationship is not linear. Alternative approaches to estimating cost without using weight (except perhaps for materials costs) have been attempted to try to produce a tool usable throughout the design process - from concept studies through development. This paper will address the pros and cons of using weight based models for cost estimating, using liquid rocket engines as the example. It will then examine approaches that minimize the imp~ct of weight based cost estimating. The Rocket Engine- Cost Model (RECM) is an attribute based model developed internally by Pratt & Whitney Rocketdyne for NASA. RECM will be presented primarily to show a successful method to use design and programmatic parameters instead of weight to estimate both design and development costs and production costs. An operations model developed by KSC, the Launch and Landing Effects Ground Operations model (LLEGO), will also be discussed.

Joyner, Claude R.↗

On the Transition and Migration of Flight Functions in the Airspace System

Since ~400 BC, when man first replicated flying behavior with kites, up until the turn of the 20th century, when the Wright brothers performed the first successful powered human flight, flight functions have become available to man via significant support from man-made structures and devices. Over the past 100 years or so, technology has enabled several flight functions to migrate to automation and/or decision support systems. This migration continues with the United States NextGen and Europe s Single European Sky (a.k.a. SESAR) initiatives. These overhauls of the airspace system will be accomplished by accommodating the functional capabilities, benefits, and limitations of technology and automation together with the unique and sometimes overlapping functional capabilities, benefits, and limitations of humans. This paper will discuss how a safe and effective migration of any flight function must consider several interrelated issues, including, for example, shared situation awareness, and automation addiction, or over-reliance on automation. A long-term philosophical perspective is presented that considers all of these issues by primarily asking the following questions: How does one find an acceptable level of risk tolerance when allocating functions to automation versus humans? How does one measure or predict with confidence what the risks will be? These two questions and others will be considered from the two most-discussed paradigms involving the use of increasingly complex systems in the future: humans as operators and humans as monitors.

Morris, Allan Terry↗

Loop Heat Pipe Startup Behaviors

A loop heat pipe must start successfully before it can commence its service. The start-up transient represents one of the most complex phenomena in the loop heat pipe operation. This paper discusses various aspects of loop heat pipe start-up behaviors. Topics include the four start-up scenarios, the initial fluid distribution between the evaporator and reservoir that determines the start-up scenario, factors that affect the fluid distribution between the evaporator and reservoir, difficulties encountered during the low power start-up, and methods to enhance the start-up success. Also addressed are the thermodynamic constraint between the evaporator and reservoir in the loop heat pipe operation, the superheat requirement for nucleate boiling, pressure spike and pressure surge during the start-up transient, and repeated cycles of loop start-up andshutdown under certain conditions.

Loop Heat Pipes↗

Loop Heat Pipe Startup Behaviors

A loop heat pipe must start successfully before it can commence its service. The startup transient represents one of the most complex phenomena in the loop heat pipe operation. This paper discusses various aspects of loop heat pipe startup behaviors. Topics include the four startup scenarios, the initial fluid distribution between the evaporator and reservoir that determines the startup scenario, factors that affect the fluid distribution between the evaporator and reservoir, difficulties encountered during the low power startup, and methods to enhance the startup success. Also addressed are the pressure spike and pressure surge during the startup transient, and repeated cycles of loop startup and shutdown under certain conditions.

Thermal Control Systems↗

Thermal Vacuum Testing of a Helium Loop Heat Pipe for Large Area Cryocooling

A loop heat pipe must start successfully before it can commence its service. The startup transient represents one of the most complex phenomena in the loop heat pipe operation. This paper discusses various aspects of loop heat pipe startup behaviors. Topics include the four startup scenarios, the initial fluid distribution between the evaporator and reservoir that determines the startup scenario, factors that affect the fluid distribution between the evaporator and reservoir, difficulties encountered during the low power startup, and methods to enhance the startup success. Also addressed are the pressure spike and pressure surge during the startup transient, and repeated cycles of loop startup and shutdown under certain conditions.

Thermal Control Systems↗

A Human-Autonomy Teaming Approach for a Flight-Following Task

Managing aircraft is becoming more complex with increasingly sophisticated automation responsible for more flight tasks. With this increased complexity, it is becoming more difficult for operators to understand what the automation is doing and why. Human involvement with increasingly autonomous systems must adjust to allow for a more dynamic relationship involving cooperation and teamwork. As part of an ongoing project to develop a framework for human-autonomy teaming (HAT) in aviation, a part-task study was conducted to demonstrate, evaluate and refine proposed critical aspects of HAT. These features were built into an automated recommender system on a ground station available from previous studies. Participants performed a flight-following task once with the original ground station (i.e., No HAT condition) and once with the HAT features enabled (i.e., HAT condition). Behavioral and subjective measures were collected; subjective measures are presented here. Overall, participants preferred the ground station with HAT features enabled compared to the station without the HAT features. Participants reported that the HAT displays and automation were preferred for keeping up with operationally important issues. Additionally, participants reported that the HAT displays and automation provided enough situation awareness to complete the task and reduced workload relative to the No HAT baseline.

ACFP↗

Axiomatic Design of Space Life Support Systems

Systems engineering is an organized way to design and develop systems, but the initial system design concepts are usually seen as the products of unexplained but highly creative intuition. Axiomatic design is a mathematical approach to produce and compare system architectures. The two axioms are:- Maintain the independence of the functional requirements.- Minimize the information content (or complexity) of the design. The first axiom generates good system design structures and the second axiom ranks them. The closed system human life support architecture now implemented in the International Space Station has been essentially unchanged for fifty years. In contrast, brief missions such as Apollo and Shuttle have used open loop life support. As mission length increases, greater system closure and increased recycling become more cost-effective.Closure can be gradually increased, first recycling humidity condensate, then hygiene wastewater, urine, carbon dioxide, and water recovery brine. A long term space station or planetary base could implement nearly full closure, including food production. Dynamic systems theory supports the axioms by showing that fewer requirements, fewer subsystems, and fewer interconnections all increase system stability. If systems are too complex and interconnected, reliability is reduced and operations and maintenance become more difficult. Using axiomatic design shows how the mission duration and other requirements determine the best life support system design including the degree of closure.

Axiomatic design↗

A TID and SEE Characterization of Multi-Terabit COTS 3D NAND Flash

Single-event effects and total ionizing dose testing are described for a 32-layer NAND flash memory, in both SLC and MLC configurations, with special considerations for unique three-dimensional test results. Extraction of three-dimensional heavy-ion test data presents a unique visualization of angular effects in NAND flash. Pattern dependence differences between SLC and MLC mode are noted, along with slightly non-uniform angular cross-section results due to the complex volume. Finally, TID data under different operating and bias conditions shows that the failure point remains the higher-voltage erasure circuitry.

Flash Memory↗

Refine your search to explore more results.