Medium and Heavy Duty Vehicle Powertrain Electrification and Fleet Demonstration

The Contract Award Grant # EE0007513 dated 2 June, 2016 is for the design, development and demonstration of medium duty package delivery vehicles that will result in a 100% increase in fuel economy as measured in miles per gallon. The project was proposed in 3 phases over two budget periods. The Phases were: 1. Modeling and Simulation – This phase was completed and formed the basis of the specifications for the design and build of the physical systems. The modeling and simulation was conducted by AVL and used real world package delivery routes that AVL mapped. The motors, battery pack, range extender and balance of plant support systems were modeled and iterated until a system with the desired fuel economy improvement was realized. Early design of the major subsystems using the actual vehicle space constraints was also completed. This phase was successfully completed in May of 2017. 2. 1st Build and FE Confirmation - This phase was completed and resulted in the final design, release, procurement and build of all major vehicle systems for commissioning into the first vehicle. The work was a partnered effort between McLaren and AVL. McLaren built the eAxle system while AVL built the range extender and integrated the range extender, battery and balance of plant sub-systems into the first vehicle with a control system to make it operate. Prior to the end of this phase a real world HIL system test gave evidence that the fuel economy improvement would be achieved in the real world. This phase was exited with a 7 month delay due mostly to procurement and supply base issues and ended in May, 2018. 3. Final Build and Demonstration - This phase included the final build and commissioning of the four program vehicles and the operation of a demonstration on a set of routes near San Diego California. During this phase, a multitude of issues arose in different systems in the vehicle. These issue resolution exercises were quite complex and caused repeated delays but were all successfully completed. It should also be noted that an early commercialization analysis resulted in the conclusion that the complexity of the system would not make it cost effective, leading to the start of a follow-on design that used newly available component technologies to specify a more cost effective system. This design will be repurposed and put into demonstration on a separately (non-DOE) funded program. It was decided and agreed with DOE that this phase should be considered completed. The knowledge and know-how gained on this program has been incorporated into and transferred to the new program. This phase and the entire program was considered closed on June 1, 2021.

33 ADVANCED PROPULSION SYSTEMS↗

Assessment of the Electrical Substation-Grid Testbed with Inside/Outside Devices and Distributed Ledger Technology

The electrical substation-grid testbed was created to integrate the GOOSE and/or DNP (Distributed Network Protocol) messages with time synchronized sources and Distributed Ledger Technology (DLT). The objective was to study the impact of faults and cyber-events at an electrical substation with inside (protective relays) and outside (power meters) substation devices. The electrical substation-grid testbed was based on the design of a 34.5/ 12.47 kV electrical substation (sectionalized bus configuration) with two power transformers, connected to radial power lines and load feeders. The electrical substation-grid testbed was installed at 252 lab space (Advanced Power System Protection), Grid Research Integration and Deployment Center (GRID-C), Oak Ridge National Laboratory. This testbed was created for Task 5, DarkNet project. The electrical substation-grid testbed was created to simulate fault and/or cyber events that could potentially result in damage to the electrical infrastructure. In addition, tests were run that are usually not allowed to be performed in an operational electrical power grid, because these test scenarios could trip breakers and/or generate fault situations that could potentially damage equipment. The number of tests performed in the electrical substation-grid testbed were executed in a better way than in a real electrical substation and/or power grid, because multiple tests could be run in a short period of time, and complex permits, and safety/ schedule restrictions like in a real electrical substation environment were not needed. The electrical substation-grid testbed was created using real measurement, communication, and protection devices that are used by electrical utilities, to have same conditions that we could observe in a real power grid or electrical substation. The electrical substation-grid testbed was based on using a real time simulator and expansion box with amplifiers that were wired to electrical substation-grid devices. This hardware-in-the-loop (HIL) was provided by protective relays, power meters, ethernet switches, remote terminal units, synchronized timing network clock, DLT devices, workstations, and servers. This report includes the design, installation, and assessment of the electrical substation-grid testbed that was similar to an operational electrical substation, integrating the power system protection, communication, and control systems. The results for the electrical substation-grid testbed were based on:• verifying the analog signals for protective relays and power meters, • observing the synchronized time source frame at devices, • authenticating the GOOSE (IEC 61850) and DNP messages from power meters and protective relays, and • verifying the trip conditions of protective relays at fault tests with the power system fault event detection, using DLT devices. For future work, the electrical substation-grid testbed with protective relays and power meters, using DLT and synchronized time source from DarkNet, will be used to study the impact of cyber-events at inside and outside substation devices. Advanced algorithms for detecting cyber-events produced by non-desired protective relay settings will be studied, to improve the detection and reliability of protection, control, and communication systems at power grids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Oak Ridge National Laboratory Pilot Demonstration of an Attestation and Anomaly Detection Framework using Distributed Ledger Technology for Power Grid Infrastructure

This report summarizes the design and pilot demonstration of a framework called Grid Guard that was created to provide increased data and device trustworthiness to electric grid devices by leveraging distributed ledger technology (DLT), specifically blockchain. Grid Guard contains a combination of core cryptographic methods such as the secure hash algorithm (SHA), and asymmetric cryptography, private permissioned blockchain, baselining configuration data, consensus algorithm (Raft) and the Hyperledger Fabric (HLF) framework. The system implements a low energy, fast, and robust enhancement to system trustworthiness within and across electric grid systems such as substations, control centers and metering infrastructures. Blockchain is a distributed database structured that provides a practically unalterable (immutable) timeline of stored transactions. By relying on hashing and the Raft consensus algorithm, if an entity tries to illegitimately alter a record at one instance of the database the other ledger nodes are not altered. They work to cross-reference each other and easily locate any incorrectly added data and remove it. The bulk raw data is stored in an off-chain storage (outside of the blockchain ledger) and a hash of this baseline data is stored in the Blockchain ledger via hashing windows of time-series and configuration data, after aggregation and filtering. The bulk off-chain data repository is then considered to be trust-anchored using the hashes stored in the blockchain. To secure the electric grid testbed devices and data, device configuration baselines were compared to those baselines that had been previously stored in the ledger. Statistical baselines for device configurations, network communication patterns, and high-speed sensor data are calculated and then stored off-chain and hashes stored in the ledger. Measurements such as three-phase voltage and current, frequency, breaker status, protection scheme settings, network configuration settings (and other device configuration artifacts) and network traffic features (packet interarrival times) are compared every minute or other selected time windows. During phase 1 of the Grid Guard DLT project different DLT technologies were studies, and an assessment was performed on DLT technology vulnerabilities, uses, and key characteristics. DLT consensus protocols were studies (e.g., RAFT, named after Reliable, Replicated, Redundant, And Fault-Tolerant). Also, cryptography, public, private and permissioned or permissionless systems were assessed. Grid Guard implements a permissioned private DLT. Consensus algorithm selection and choice of DLT implementation depended heavily on the use-case. For this use-case, parameters were selected to measure performance and existing tools for assessment. Benchmarking was performed theoretically and practically. During phase 2 hashed transactions/blocks were inserted into the ledger every second. During phase 2 of the Grid Guard DLT project, a prototype framework was developed and demonstrated for attestation of critical substation devices and data using precision timing systems that use PTP and IRIG-B protocols) on a testbed of operational devices that emulated a distribution substation, control center, and power metering infrastructure using real Operational Technology (OT). The testbed includes OT devices such as protective relays, human machine interfaces (HMI), and power meters. To determine when to collect and compare system and network baselines, an initial examination of an anomaly detection capability to identify malicious manipulation of data streams was conducted. The resulting anomaly detection was demonstrated in a set of experiments and leveraged to trigger device artifact attestation checks. Attestation checks occur against device configuration baselines when compared with the immutable blockchain-stored baselines, which provided a cryptographically supported means by which to store baselines. The electrical substation-grid testbed was created to test the Grid Guard framework. The testbed emulates the operations of a portion of a power grid and SCADA systems as closely as possible. The testbed integrates real protocols, mainly IEC 61850 standard protocols, such as the Sampled Value (SV) and the GOOSE protocols. The testbed also supports DNP3 and other layer 2 and layer 3 protocols such as Telnet, SSH, SFTP/FTP and other proprietary protocols needed to connect to industrial control system equipment. The testbed emulates real power conditions using the OpalRT hardware-in-the-loop (HIL) device which can create fault situations that cannot be easily tested on real systems. The electrical substation-grid testbed was created using real measurement, communication, and protection devices that electrical utilities commonly use.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Modular HF Isolated MV String Inverters Enable a New Paradigm for Large PV Farms

The “Modular HF Isolated MV String Inverters Enable a New Paradigm for Large PV Farms” project focuses on exploring alternative power converter and system-level plant configurations to achieve the lowest cost and highest energy output for a given solar plus storage (e.g., PV + battery) plant, including the use of medium voltage (MV) collection while taking into account detailed models of all elements. To realize this objective, four approaches were utilized (i) employ a novel Medium Voltage String Inverter (MVSI) topology (soft switching solid state transformer – S4T) to convert 1000 Vdc to 4.16 kVac; (ii) plant collection using standard, low-cost overhead MV distribution network; (iii) enable energy storage integration without additional converter cost to achieve dispatchability of the PV resource; and (iv) provide advanced functionality (autonomous operation, track ISO signals for dynamic balancing and ancillary services, and PV farm operation as a virtual grid resource). Subsequently and in alignment with the previously mentioned approaches, the project was structured in five efforts (i) S4T MVSI simulation and design; (ii) system analysis and storage optimization; (iii) financial analysis; (iv) power converter prototype build and test; and (v) regulatory and commercial impact study. The outcomes provided by each effort can be summarized as follows (i) Project explored the use of MV AC distribution architecture for hybrid PV+storage utility-scale PV farms; (ii) Detailed loss and LCOE analysis for AC and DC side BESS architecture, including multiple converter topologies, as well as for proposed MVSI/MDCT systems; (iii) MVSI was built and holds promise but needs lower-cost high-voltage Si-C devices, which does not seem possible in the near term; (iv) MDCT provides a simpler modular building block – validated through HIL and farm level modeling, simulation and experimental validation; (v) 300 kVA MDCT prototype built and tested, technology is being commercialized; and (vi) Regulatory model of utility building PV plants, where PV panels are treated as DC generation (IPP), seems viable and can allow improved grid integration.

14 SOLAR ENERGY↗

SiC Based Modular Transformer-less MW-Scale Power Conditioning System and Control for Flexible CHP System

This project aims at developing a SiC-based, modular, transformer-less (60-Hz-transformers-free), MW-scale, four-wire DC/AC power conditioning system (PCS) converter, and a corresponding control system for flexible-CHP (F-CHP) systems. With the help of an F-CHP controller and power electronics converters, different CHP sources, renewable sources, and batteries can be assembled to the DC grid, which is then connected to the medium voltage (MV) AC grid through the PCS converter. To meet grid support and performance requirements, the F-CHP controller design and PCS converter design follow IEEE 1547 and IEEE 2030.7 standards. Five main tasks, including PCS converter design, F-CHP controller development, PCS converter prototype building and testing, F-CHP controller testing, and PCS paralleling, have been carried out. In this project, the F-CHP controller testing has been completed in simulation, HIL and HTB, and the PCS converter prototypes have been successfully built and tested.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Energy Optimization of Light and Heavy-Duty Vehicle Cohorts of Mixed Connectivity, Automation and Propulsion System Capabilities via Meshed V2V-V2I and Expanded Data Sharing (Final Scientific and Technical Report)

Vehicle connectivity and automated driving technologies individually have the potential to decrease energy consumption and/or increase safety on light, medium or heavy duty vehicles to varying degrees depending on the traffic infrastructure and specific driving scenarios. Due to advances in sensing, perception and computing power, research and development emphasis in the mobility sector has shifted away from connectivity. Prior research has shown that driving automation with the absence of connectivity can in certain circumstances increase energy consumption. The effectiveness of synergizing connectivity and driving automation technologies is the focus of this work, specifically applied to vehicle cohorts of mixed composition, light and heavy duty, and powertrains ranging from all electric to conventional internal combustion engine. The project team is led by Michigan Technological University (MTU) and partnered with AVL Mobility Technologies Inc. (AVL), Borg Warner (BW), Traffic Technology Services (TTS), American Center for Mobility (ACM) and Navistar (NAV). The main thrusts for the team are to develop a micro-traffic simulation environment with specific VD&PT system attributes and CAV capabilities, 2) field a vehicle test fleet of mixed classification, propulsion and CAV capacity, 3) develop artificial intelligence (AI) and machine learning (ML) based multi-agent optimization methods for various traffic infrastructures, 4) integrate the virtual environment and the optimization methods then deploy the system as a CAV hardware in the loop (HiL) for the vehicle test fleet and 5) conduct closed track and public road testing to validate simulation and demonstrated energy and mobility improvements at multiple scales. For a cohort of mixed vehicles, the team will demonstrate a reduction of energy consumption of 10-50% at intersection, arterial roadway and limited access highway scenarios through connectivity and automation in simulation and at a closed test track. The energy reduction objectives of the project are summarized in Table 1, indicating the infrastructure and over what distances are relevant considered. Single scenario energy reductions are not relevant and thus, the research team took the approach to vary parameters associated with the infrastructure, vehicle cohort composition and dynamic behavior to generate energy consumption distributions for both unconnected and connected scenarios.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Developing an Energy-Conscious Traffic Signal Control System for Optimized Fuel Consumption in Connected Vehicle Environments

The project titled “Developing an Energy-Conscious Traffic Signal Control System for Optimized Fuel Consumption in Connected Vehicle Environments” addresses energy-related challenges associated with adaptive traffic control systems by integrating connected vehicles (CV) and connected infrastructure (CI). The system developed in this project, a CV-based adaptive traffic control system, aims to improve fuel consumption in mixed traffic environments by capitalizing on emerging CV and CI communication technologies, as well as leveraging recent advances in Artificial Intelligence (AI), optimization, and edge computing. The system was tested at the MLK Smart Corridor, an urban testbed managed by the University of Tennessee at Chattanooga (UTC) and the City of Chattanooga. The system was validated through extensive simulations, both Software-in-the-Loop (SILS) and Hardware-in-the-Loop (HILS), and was further implemented and tested in real-world conditions at several intersections along the corridor. The Fuel Consumption Performance Index (FC-PI) and the Ecological Performance Index (Eco-PI) were developed as the key components for evaluating the system’s impact on fuel consumption and emissions. These metrics provided a comprehensive means of understanding the impact of traffic signal control optimization in mixed traffic environments. The report presents an in-depth analysis of the Eco-PI, FC-PI, adaptive traffic control system integration, and the testing and field implementation of the system. The results demonstrate significant reductions in fuel consumption and emissions, showcasing the system’s capability to contribute to more sustainable urban traffic management. The report also documents the challenges encountered and recommendations for scaling and further improving the system.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Real-Time Testbed for Smart Grid Recloser Controller

The growing need for a low voltage recloser has become apparent due to the rise in requirements for a smart grid. This includes more detailed management of power flow forward (towards load) and backward (towards generation), source synchronization in real time, more indepth fault responses, and the use of green energy. The SEL-651R-2 relay is a device that can manage these needs, especially in fault response and synchronization, and is commonly used in systems called microgrids. Microgrids are distribution level systems that are able to operate separated from the main grid, are typically installed much closer to the load(s), and are fed by distributed energy resources (DERs), such as wind, solar or diesel generators. The SEL-651R-2 is normally used in the field with presets operative settings, but the Western Michigan University (WMU) Center for Interdisciplinary Research on Secure, Efficient and Sustainable Energy Technology (WMU InterEnergy Center) wished to test this device in its range of capabilities for microgrid application. A Hardware-In-the-Loop (HIL) testbed was implemented and used through the Real Time Digital Simulator (RTDS) using the RSCAD software to test the SEL-651R-2's use cases and functions. The testbed includes a microgrid with interconnection to a larger main grid, and the relay is meant to control the recloser at the point of common coupling (PCC) between the main grid and microgrid. The testbed shows how basic protections, reclosing, and synchronization checks function when handling faults that affect both the microgrid and the main grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hardware-in-the-loop Laboratory Performance Verification of Flexible Building Equipment in a Typical Commercial Building

This project aims to develop high-resolution equipment performance and occupant data that quantifies demand flexibility in typical commercial buildings. The dataset documented in this report includes comprehensive time-series measurements from hardware-in-the-loop (HIL) experiments conducted across multiple testbeds designed to simulate realistic operational environments for HVAC systems. Specifically, it captures minute-by-minute high-resolution data on the performance of various typical HVAC systems, including a variable-air-volume (VAV) air handling unit (AHU) system with chillers and an ice tank in the Intelligent Building Agents Laboratory (IBAL) at the National Institute of Standards and Technology (NIST), a two-stage air-source heat pump (ASHP) at the NIST, and a water-source heat pump (WSHP) at Texas A&M University (TAMU). The data were generated under a range of controlled conditions reflecting different grid scenarios and climatic influences, as well as various control strategies, building types, occupancy patterns, and occupant behaviors. This dataset provides DE-EE0009153 Final Report 5 detailed insights into the demand flexibility of these systems, including their response to grid signals, occupant behaviors, energy consumption patterns, and operational efficiency under different conditions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Mitigating Data Center Impact on Grid Stability: A Coordinated Control Strategy Using Verrus StabiliGrid Architecture

Large data centers, which now represent a significant and growing share of the total U.S. grid load, can inadvertently destabilize the electrical grid when they disconnect simultaneously during brief voltage disturbances. The July 10, 2024, Eastern Interconnection incident, in which a sub-100-millisecond transmission fault triggered the cascading loss of approximately 1,500 MW of data center load, illustrates this vulnerability. While commercial battery energy storage systems (BESS) deployed in data centers provide device-level fault ride-through per IEEE 1547, they lack coordination with facility protection logic and uninterruptible power supplies (UPS), limiting their effectiveness as grid-stabilizing assets. This report presents the Verrus StabiliGrid architecture, a coordinated control framework that integrates BESS, UPS, and point-of-interconnection (POI) protection settings to enable data centers to ride through both undervoltage and overvoltage grid contingencies without disconnecting. The four-step strategy encompasses: (1) high-resolution power quality monitoring to detect the grid state during events such as undervoltage, overvoltage, underfrequency, and overfrequency; (2) POI protection settings that allow for extended ride-through and grid-connected operation during grid contingencies; (3) grid state-driven autonomous dispatch of assets to improve grid resilience by reducing power draw during undervoltage or absorbing more power during overvoltage events; and (4) coordinated post-recovery dispatch of data center assets to restore firm load to pre-contingency levels. Validated through controller-hardware-in-the-loop (C-HIL) simulations at the National Laboratory of the Rockies, results show grid import restoration to pre-fault levels within 100 milliseconds of voltage recovery. This work advances the ability of data centers to transition from passive, disturbance-sensitive loads to active participants in grid stability, a capability increasingly required by emerging NERC and ERCOT regulatory frameworks.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Demonstration of Grid Services Using Mixed Grid-Forming and Grid-Following Technologies at the Wheatridge Renewable Energy Facility (Final Technical Report)

This Final Technical Report summarizes the analytical, modeling, and engineering work performed to evaluate grid-forming (GFM) inverter capabilities within a large hybrid renewable energy facility. The project focused on assessing the ability of advanced inverter-based resources to provide essential reliability services through coordinated operation of grid-forming (GFM) and grid-following (GFL) technologies. During Budget Period 1, the project developed a comprehensive framework of GFM performance metrics, including angle support, voltage regulation, frequency response, damping behavior, and current-limiting performance. Extensive electromagnetic transient (EMT) studies and hardware-in-the-loop (HIL) testing were conducted to validate GFM behavior under a range of operating conditions, including weak-grid scenarios, voltage disturbances, and multi-resource interactions. The project also established validated modeling approaches, plant-level control integration strategies, commissioning frameworks, and high-speed measurement infrastructure to support future field demonstration. Although the project concluded prior to field demonstration, the results provide a utility-scale foundation for evaluating, modeling, and deploying grid-forming technologies. The methodologies and tools developed contribute to industry understanding of inverter-based resource behavior and support future power system reliability under increasing renewable penetration.

14 SOLAR ENERGY↗

An Optimal Power Control Strategy for Grid-Following Inverters in a Synchronous Frame

This work proposes a power control strategy based on the linear quadratic regulator with optimal reference tracking (LQR-ORT) for a three-phase inverter-based generator (IBG) using an LCL filter. The use of an LQR-ORT controller increases robustness margins and reduces the quadratic value of the power error and control inputs during transient response. A model in a synchronous reference frame that integrates power sharing and voltage–current (V–I) dynamics is also proposed. This model allows for analyzing closed-loop eigenvalue location and robustness margins. The proposed controller was compared against a classical droop approach using proportional-resonant controllers for the inner loops. Mathematical analysis and hardware-in-the-loop (HIL) experiments under variations in the LCL filter components demonstrate fulfillment of robustness and performance bounds of the LQR-ORT controller. Experimental results demonstrate accuracy of the proposed model and the effectiveness of the LQR-ORT controller in improving transient response, robustness, and power decoupling.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Commercial PV Inverter IEEE 1547.1 Ride-Through Assessments Using an Automated PHIL Test Platform

As more countries seek solutions to their de-carbonization targets using renewable energy (RE) technologies, interconnection standards and national grid codes for distributed energy resources (DER) are being updated to support higher penetrations of RE and improve grid stability. Common grid-code revisions mandate DER devices, such as solar inverters and energy storage systems, ride-through (RT) voltage and frequency disturbances. This is necessary because as the percentage of generation from DER increases, there is a greater risk power system faults will cause many or all DER to trip, triggering a substantial load-generation imbalance and possible cascading blackout. This paper demonstrates for the first time a methodology to verify commercial DER devices are compliant to new voltage, frequency, and rate of change of frequency (ROCOF) RT requirements established in IEEE Std. 1547-2018. The methodology incorporates a software automation tool, called the SunSpec System Validation Platform (SVP), in combination with a hardware-in-the-loop (HIL) system to execute the IEEE Std. 1547.1-2020 RT test protocols. In this paper, the approach is validated with two commercial photovoltaic inverters, the test results are analyzed for compliance, and improvements to the test procedure are suggested.

14 SOLAR ENERGY↗

Investigating the Vulnerabilities of the Direct Transfer Trip Scheme for Network Protector Units in the Secondary Networks of Electric Power Distribution Grids

Network protector units (NPUs) are crucial parts of the protection of secondary networks to effectively isolate faults occurring on the primary feeders. When a fault occurs on the primary feeder, there is a path of the fault current going through the service transformers that causes a negative flow of current on the NPU connected to the faulted feeder. Conventionally, NPUs rely on the direction of current with respect to the voltage to detect faults and make a correct trip decision. However, the conventional NPU logic does not allow the reverse power flow caused by distributed energy resources installed on secondary networks. The communication-assisted direct transfer trip logic for NPUs can be used to address this challenge. However, the communication-assisted scheme is exposed to some vulnerabilities arising from the disruption or corruption of the communicated data that can endanger the reliable operation of NPUs. This paper evaluates the impact of the malfunction of the communication system on the operation of communication-assisted NPU logic. To this end, the impact of packet modification and denial-of-service cyberattacks on the communication-assisted scheme are evaluated. The evaluation was performed using a hardware-in-the-loop (HIL) co-simulation testbed that includes both real-time power system and communication network digital simulators. This paper evaluates the impact of the cyberattacks for different fault scenarios and provides a list of recommendations to improve the reliability of communication-assisted NPU protection.

direct transfer trip↗

Real-Sim Interface: Enabling Multi-resolution Simulation and X-in-the-Loop Development for Connected and Automated Vehicles

We report connected and automated vehicles (CAVs) can bring safety, mobility, and energy benefits to transportation systems. Ideally, CAV applications would be fully evaluated and validated prior to real-world implementation. However, many technical challenges in both software and hardware hinder the process. To comprehensively evaluate all aspects of CAV applications, an integrated evaluation environment is needed with various simulation tools from different domains. In the current literature, there lacks a well-developed interface to enable multi-resolution simulation of vehicle, traffic, virtual environment, and hardware-in-the-loop (HIL) simulation. In this work, a modular and flexible interface is developed to enable multi-resolution vehicle and traffic co-simulation for CAV applications. This interface is built upon Oak Ridge National Laboratory’s (ORNL’s) Real-Sim approach, can support various simulation tools and real-time X-in-the-loop (XIL) simulations, and is based on network communication protocols. The network communication delays are analyzed for simultaneous connection of up to 20 simulators. Then, two example applications are studied to demonstrate the potential usage of the Real-Sim interface: (1) a centralized merging scenario where the dynamics of two ego vehicles are emulated with detailed vehicle and powertrain dynamics models and (2) a signal-controller-in-the-loop (SCIL) evaluation where one intersection of the simulated traffic scenario is controlled by a physical signal controller. This Real-Sim interface is a tool that allows researchers to bring real, tangible hardware and software into simulated environments to comprehensively evaluate and support a wide variety of CAV applications.

33 ADVANCED PROPULSION SYSTEMS↗

Structure of Low-spin States in \(^{45}\)Sc Studied via Coulomb Excitation

The electromagnetic structure of 45 Sc at low excitation energy was investigated via low-energy Coulomb excitation at the Heavy Ion Laboratory (HIL) of the University of Warsaw and at the Inter-University Accelerator Centre (IUAC) in New Delhi. A set of reduced E2, E3, and M1 matrix elements was extracted from the collected data using the GOSIA code. The reduced transition probability B(E2; 11/2 – → 7/2 – ) has been determined, allowing us to deduce the lifetime of the 11/2 – state at 1237 keV. In addition, the upper limit on the reduced transition probability B(E3; 7/2 – → 5/2 + ) has been determined for the first time. Finally, new large-scale shellmodel and beyond-mean-field calculations were performed to interpret the structure of this nucleus.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Library reuse in a rapid development environment

The Aeroscience and Flight Mechanics Division (AFMD) established a Rapid Development Laboratory (RDL) to investigate and improve new 'rapid development' software production processes and refine the use of commercial, off-the-shelf (COTS) tools. These tools and processes take an avionics design project from initial inception through high fidelity, real-time, hardware-in-the-loop (HIL) testing. One central theme of a rapid development process is the use and integration of a variety of COTS tools: This paper discusses the RDL MATRIX(sub x)(R) libraries, as well as the techniques for managing and documenting these libraries. This paper also shows the methods used for building simulations with the Advanced Simulation Development System (ASDS) libraries, and provides metrics to illustrate the amount of reuse for five complete simulations. Combining ASDS libraries with MATRIX(sub x)(R) libraries is discussed.