Engineering Papers⌕ Search

Engineering topics

Zaltsman, A

Publications and source records attributed to Zaltsman, A.

At least 19 records

RHIC performance for FY2011 Au+Au heavy ion run

Following the Fiscal Year (FY) 2010 (Run-10) Relativistic Heavy Ion Collider (RHIC) Au+Au run, RHIC experiment upgrades sought to improve detector capabilities. In turn, accelerator improvements were made to improve the luminosity available to the experiments for this run (Run-11). These improvements included: a redesign of the stochastic cooling systems for improved reliability; a relocation of 'common' RF cavities to alleviate intensity limits due to beam loading; and an improved usage of feedback systems to control orbit, tune and coupling during energy ramps as well as while colliding at top energy. We present an overview of changes to the Collider and review the performance of the collider with respect to instantaneous and integrated luminosity goals. At the conclusion of the FY 2011 polarized proton run, preparations for heavy ion run proceeded on April 18, with Au+Au collisions continuing through June 28. Our standard operations at 100 GeV/nucleon beam energy was bracketed by two shorter periods of collisions at lower energies (9.8 and 13.5 GeV/nucleon), continuing a previously established program of low and medium energy runs. Table 1 summarizes our history of heavy ion operations at RHIC.

43 PARTICLE ACCELERATORS↗

High power RF systems for the BNL ERL project

The Energy Recovery Linac (ERL) project, now under construction at Brookhaven National Laboratory, requires two high power RF systems. The first RF system is for the 703.75 MHz superconducting electron gun. The RF power from this system is used to drive nearly half an Ampere of beam current to 2 MeV. There is no provision to recover any of this energy so the minimum amplifier power is 1 MW. It consists of 1 MW CW klystron, transmitter and power supplies, 1 MW circulator, 1 MW dummy load and a two-way power splitter. The second RF system is for the 703.75 MHz superconducting cavity. The system accelerates the beam to 54.7 MeV and recovers this energy. It will provide up to 50 kW of CW RF power to the cavity. It consists of 50 kW transmitter, circulator, and dummy load. This paper describes the two high power RF systems and presents the test data for both.

43 PARTICLE ACCELERATORS↗

Commissioning and performance of the BNL EBIS LLRF system

The Electron Beam Ion Source (EBIS) LLRF system utilizes the RHIC LLRF upgrade platform to achieve the required functionality and flexibility. The LLRF system provides drive to the EBIS high-level RF system, employs I-Q feedback to provide required amplitude and phase stability, and implements a cavity resonance control scheme. The embedded system provides the interface to the existing Controls System, making remote system control and diagnostics possible. The flexibility of the system allows us to reuse VHDL codes, develop new functionalities, improve current designs, and implement new features with relative ease. In this paper, we will discuss the commissioning process, issues encountered, and performance of the system.

43 PARTICLE ACCELERATORS↗

Commissioning results from the recently upgraded RHIC LLRF system

During RHIC Run 10, the first phase of the LLRF Upgrade was successfully completed. This involved replacing the aging VME based system with a modern digital system based on the recently developed RHIC LLRF Upgrade Platform, and commissioning the system as part of the normal RHIC start up process. At the start of Run 11, the second phase of the upgrade is underway, involving a significant expansion of both hardware and functionality. This paper will review the commissioning effort and provide examples of improvements in system performance, flexibility and scalability afforded by the new platform. The RHIC LLRF upgrade is based on the recently developed RHIC LLRF Upgrade Platform. The major design goals of the platform are: (1) Design a stand alone, generic, digital, modular control architecture which can be configured to satisfy all of the application demands we currently have, and which will be supportable and upgradeable into the foreseeable future; and (2) It should integrate seamlessly into existing controls infrastructure, be easy to deploy, provide access to all relevant control parameters (eliminate knobs), provide vastly improved diagnostic data capabilities, and permit remote reconfiguration. Although the system is still in its infancy, we think the initial commissioning results from RHIC indicate that these goals have been achieved, and that we've only begun to realize the benefits the platform provides.

43 PARTICLE ACCELERATORS↗

Medium energy heavy ion operations at RHIC

As part of the search for a phase transition or critical point on the QCD phase diagram, an energy scan including 5 different energy settings was performed during the 2010 RHIC heavy ion run. While the top beam energy for heavy ions is at 100 GeV/n and the lowest achieved energy setpoint was significantly below RHICs injection energy of approximately 10 GeV/n, we also provided beams for data taking in a medium energy range above injection energy and below top beam energy. This paper reviews RHIC experience and challenges for RHIC medium energy operations that produced full experimental data sets at beam energies of 31.2 GeV/n and 19.5 GeV/n. The medium energy AuAu run covered two beam energies, both above the RHIC injection energy of 9.8 GeV but well below the standard store energy of 100 GeV (see table 1). The low energy and full energy runs with heavy ions in FY10 are summarized in [1] and [2]. Stochastic Cooling ([3]) was only used for 100 GeV beams and not used in the medium energy run. The efficiency of the transition from 100 GeV operation to 31.2 GeV and then to 19.5 GeV was remarkable. Setup took 32 h and 19 h respectively for the two energy settings. The time in store, defined to be the percentage of time RHIC provides beams in physics conditions versus calendar time, was approximately 52% for the entire FY10 heavy ion run. In both medium energy runs it was well above this average, 68% for 31.5 GeV and 82% for 19.5 GeV. For both energies RHIC was filled with 111 bunches with 1.2 10{sup 9} and 1.3 10{sup 9} ions per bunch respectively.

43 PARTICLE ACCELERATORS↗

RHIC Polarized proton operation

The Relativistic Heavy Ion Collider (RHIC) operation as the polarized proton collider presents unique challenges since both luminosity(L) and spin polarization(P) are important. With longitudinally polarized beams at the experiments, the figure of merit is LP{sup 4}. A lot of upgrades and modifications have been made since last polarized proton operation. A 9 MHz rf system is installed to improve longitudinal match at injection and to increase luminosity. The beam dump was upgraded to increase bunch intensity. A vertical survey of RHIC was performed before the run to get better magnet alignment. The orbit control is also improved this year. Additional efforts are put in to improve source polarization and AGS polarization transfer efficiency. To preserve polarization on the ramp, a new working point is chosen such that the vertical tune is near a third order resonance. The overview of the changes and the operation results are presented in this paper. Siberian snakes are essential tools to preserve polarization when accelerating polarized beams to higher energy. At the same time, the higher order resonances still can cause polarization loss. As seen in RHIC, the betatron tune has to be carefully set and maintained on the ramp and during the store to avoid polarization loss. In addition, the orbit control is also critical to preserve polarization. The higher polarization during this run comes from several improvements over last run. First we have a much better orbit on the ramp. The orbit feedback brings down the vertical rms orbit error to 0.1mm, much better than the 0.5mm last run. With correct BPM offset and vertical realignment, this rms orbit error is indeed small. Second, the jump quads in the AGS improved input polarization for RHIC. Third, the vertical tune was pushed further away from 7/10 snake resonance. The tune feedback maintained the tune at the desired value through the ramp. To calibrate the analyzing power of RHIC polarimeters at any energy above injection, the polarized hydrogen jet target runs for every fill with both beams. Based on the known analyzing power, there is very little polarization loss between injection and 100 GeV. An alternative way is to measure the asymmetry at 100 GeV followed by ramping up to 250 GeV and back down to 100 GeV and then to measure the asymmetry again at 100 GeV. If the asymmetry after the down ramp is similar to the measurement before the up ramp, polarization was also preserved during the ramp to 250 GeV. The analyzing power at storage energy can then be extracted from the asymmetries measured at 100 GeV and 250 GeV. The tune and orbit feedbacks are essential for the down ramp to be possible. The polarized proton operation is still going on. We will push bunch intensity higher until reaching the beam-beam limit. The even higher intensity will have to wait for the electron lenses to compensate the beam-beam effect. To understand the details of spin dynamics in RHIC with two snakes, spin simulation with the real magnet fields have been developed recently. The study will provide guidance for possible polarization loss schemes. Further polarization gain will requires a polarized source upgrade; more careful setup jump quads in the AGS to get full benefit; and control emittance in the whole accelerator chain.

08 HYDROGEN↗

FPC conditioning cart at BNL

The 703 MHz superconducting gun for the BNL Energy Recovery Linac (ERL) prototype has two fundamental power couplers (FPCs), and each of them will deliver up to 500 kW of CW RF power. In order to prepare the couplers for high power RF service and process multipacting, the FPCs should be conditioned prior to installation into the gun cryomodule. A conditioning cart based test stand, which includes a vacuum pumping system, controllable bake-out system, diagnostics, interlocks and data log system has been designed, constructed and commissioned by collaboration of BNL and AES. This paper presents FPC conditioning cart systems and the conditioning process.

43 PARTICLE ACCELERATORS↗

Status of high current R&D Energy Recovery LINAC at Brookhaven National Laboratory

An ampere class 20 MeV superconducting Energy Recovery Linac (ERL) is under construction at Brookhaven National Laboratory (BNL) for testing of concepts relevant for high-energy coherent electron cooling and electron-ion colliders. One of the goals is to demonstrate an electron beam with high charge per bunch ({approx} 5 nC) and low normalized emittance ({approx} 5 mm-mrad) at an energy of 20 MeV. Flexible lattice of ERL loop provides a test-bed for investigating issues of transverse and longitudinal instabilities, and diagnostics for intense CW e-beam. The superconducting 703 MHz RF photoinjector is considered as an electron source for such a facility. We will start with a straight pass (gun - 5 cell cavity - beam stop) test for the SRF Gun performance studies. Later, we will install and test a novel injection line concept for emittance preservation in a lower energy merger. In this paper we present the status and our plans for construction and commissioning of this facility.

43 PARTICLE ACCELERATORS↗

BNl 703 MHz superconducting RF cavity testing

The BNL 5-cell, 703 MHz superconducting accelerating cavity has been installed in the high-current ERL experiment. This experiment will function as a proving ground for the development of high-current machines in general and is particularly targeted at beam development for an electron-ion collider (eRHIC). The cavity performed well in vertical tests, demonstrating gradients of 20 MV/m and a Q{sub 0} of 1e10. Here we will present its performance in the horizontal tests, and discuss technical issues involved in its implementation in the ERL.

43 PARTICLE ACCELERATORS↗

Performance of the new EBIS preinjector

The construction and initial commissioning phase of a new heavy ion preinjector was completed at Brookhaven in September, 2010, and the preinjector is now operational. This preinjector, using an EBIS source to produce high charge state heavy ions, provided helium and neon ion beams for use at the NASA Space Radiation Laboratory in the Fall of 2010, and gold and uranium beams are being commissioned during the 2011 run cycle for use in RHIC. The EBIS operates with an electron beam current of up to 10 A, to produce mA level currents in 10-40 {micro}s beam pulses. The source is followed by an RFQ and IH linac to accelerate ions with q/m > 0.16 to an energy of 2 MeV/amu, for injection into the Booster synchrotron. The performance of the preinjector is presented, including initial operational experience for the NASA and RHIC programs.

43 PARTICLE ACCELERATORS↗

Commissioning of the EBIS-based heavy ion preinjector at Brookhaven

The status is presented of the commissioning of a new heavy ion preinjector at Brookhaven National Laboratory. This preinjector uses an Electron Beam Ion Source (EBIS), and an RFQ and IH Linac, both operating at 100.625 MHz, to produce 2 MeV/u ions of any species for use, after further acceleration, at the Relativistic Heavy Ion Collider (RHIC) and the NASA Space Radiation Laboratory (NSRL). Among the increased capabilities provided by this preinjector are the ability to produce ions of any species, and the ability to switch between multiple species in 1 second, to simultaneously meet the needs of both science programs. For initial setup, helium beam from EBIS was injected and circulated in the Booster synchrotron. Following this, accelerated Au{sup 32+} and Fe{sup 20+} beams were transported to the Booster injection point, fulfilling DOE requirements for project completion.

43 PARTICLE ACCELERATORS↗

Beam commissioning results for the RFQ and MEBT of the EBIS based preinjector for RHIC

The EBIS based preinjector for both the Relativistic Heavy Ion Collider (RHIC) and NASA Space Radiation Laboratory (NSRL) is now being commissioned at Brookhaven National Laboratory (BNL). In 2008, the RFQ for the project was delivered and commissioned using Test EBIS, which was built to demonstrate the high current EBIS's performance. A dedicated beamline after the RFQ was assembled to confirm the RFQ's performance, and the beam energy was measured by a bending dipole magnet. In November 2009, the RFQ was moved to the final location and the vanes were realigned. The beam commissioning with the RHIC-EBIS was started again during March 2010. The RFQ accelerates ions from 17 keV/u to 300 keV/u and operates at 100.625 MHz. It is followed by a short Medium Energy Beam Transport (MEBT), which consists of four quadrupoles and one buncher cavity. Some temporary diagnostics for this commissioning include an emittance probe, TOF system, fast Faraday cup, and beam current measurement units. As of September 2010, the RFQ and the MEBT show expected performance with He{sup +}, Au{sup 32+} and Fe{sup 20+} beams. Further commissioning for higher intensity beams is in progress.

43 PARTICLE ACCELERATORS↗

RHIC PERFORMANCE DURING THE FY10 200 GeV Au+Au HEAVY ION RUN

Since the last successful RHIC Au+Au run in 2007 (Run-7), the RHIC experiments have made numerous detector improvements and upgrades. In order to benefit from the enhanced detector capabilities and to increase the yield of rare events in the acquired heavy ion data a significant increase in luminosity is essential. In Run-7 RHIC achieved an average store luminosity of <L> = 12 x 10{sup 26} cm{sup -2} s{sup -1} by operating with 103 bunches (out of 111 possible), and by squeezing to {beta}* = 0.85 m. This year, Run-10, we achieved <L> = 20 x 10{sup 26} cm{sup -2} s{sup -1}, which put us an order of magnitude above the RHIC design luminosity. To reach these luminosity levels we decreased {beta}* to 0.75 m, operated with 111 bunches per ring, and reduced longitudinal and transverse emittances by means of bunched-beam stochastic cooling. In addition we introduced a lattice to suppress intra-beam scattering (IBS) in both RHIC rings, upgraded the RF control system, and separated transition crossing times in the two rings. We present an overview of the changes and the results of Run-10 performance.

43 PARTICLE ACCELERATORS↗

RHIC Performance as a 100 GeV Polarized Proton Collider in Run-9

During the second half of Run-9, the Relativisitc Heavy Ion Collider (RHIC) provided polarized proton collisions at two interaction points. The spin orientation of both beams at these collision points was controlled by helical spin rotators, and physics data were taken with different orientations of the beam polarization. Recent developments and improvements will be presented, as well as luminosity and polarization performance achieved during Run-9.

43 PARTICLE ACCELERATORS↗

R&D ERL: High power RF systems

The Energy Recovery Linac (ERL) project, now under construction at Brookhaven National Laboratory, requires two high power RF systems. The first RF system is for the 703.75 MHz superconducting electron gun. The RF power from this system is used to drive nearly half an Ampere of beam current to 2.5 MeV. There is no provision to recover any of this energy so the minimum amplifier power is 1 MW. It consists of 1 MW CW klystron, transmitter and power supplies, 1 MW circulator, 1 MW dummy load and a two-way power splitter. The second RF system is for the 703.75 MHz superconducting cavity. The system accelerates the beam to 54.7 MeV and recovers this energy. It will provide up to 50 kW of CW RF power to the cavity. It consists of 50 kW transmitter, circulator, and dummy load. This paper describes the two high power RF systems and presents the test data for both.

43 PARTICLE ACCELERATORS↗