Engineering Papers⌕ Search

DOE OSTI · 918514

Final Technical Report

Abstract

The Georgia Institute of Technology’s Industrial Assessment Center (GT IAC) has a long history working on the IAC program with over 30 years of experience in meeting the IAC program’s goals in a very effective manner since beginning participation in the IAC program’s predecessor, the EADC, in 1977. During the last four year contract period, October 1, 2002 through September 31, 2006, the GT IAC continued this work with the assessments of eighty nine (89) industrial facilities. These assessments resulted in the reported implemented savings of forty eight thousand (48,000,000) kWh of electricity and seven hundred and fifty thousand (750,000) MMBtu of natural gas. The total calculated cost savings from the recommendations implemented was five and a half million dollars ($5,500,000). These savings reoccur annually. However, this cost savings is the total of various recommendations that were calculated during 2002 to 2006. During this time period, energy prices were almost always lower than current energy prices. If you adjust the cost savings number to account for current energy prices, the cost savings would exceed nine million dollars ($9,000,000) reoccurring annually. Beyond the reduction of industrial energy consumption and the cost savings benefit, education has also been an important element of this Center’s work. Primarily this entailed both formal and on the job training of this Center’s student employees. Over the four year time frame, this Center has had fifteen different student employees work for this Center. This Center has also instructed a graduate level senior mechanical engineering class that allowed senior engineering students to conduct IAC assessments under the supervision of IAC staff. This class exposed over one hundred students to industrial energy consumption and energy efficiency. In addition to educating students, the education of plant personnel has also been an important element for this Center. It is believed that this Center has made effective use of IAC program resources by reducing industrial plant energy consumption and cost by helping them become more energy efficient. In turn, this has helped make domestic industry more competitive. This Center has also helped by introducing the next generation of engineers to energy efficiency in the industrial sector.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Meffert, Bill. 2007-10-26. Final Technical Report. https://doi.org/10.2172/918514. https://engineeringpapers.com/record/osti%3A918514/final-technical-report

Citations retain the original authors and DOI and include this site’s record URL. If this discovery service contributed to your research, you can also cite Engineering Papers by Indiciae: BibTeX · RIS.

KEEP EXPLORING

Related reports

Building the Business Case with JUSTIFI: Quantifying Multiple Benefits in the Automotive Industry

The Michigan State University Industrial Training and Assessment Center (MSU ITAC) conducted a pilot study at an automotive parts manufacturer in Michigan. The study identified energy-productivity enhancements through the application of the JUSTIFI software. Key recommendations included replacing six inefficient rooftop units (RTUs) with a new air rotational unit. By quantifying operational savings for this project, the expected payback period went from 6.6 years to 1.4 years. Additionally, the installation of variable frequency drives (VFDs) on condenser tower motors was suggested. By including all operational benefits, the payback period was reduced from 8.2 years to 1.3 years. This comprehensive analysis aims to bolster the manufacturer's goals of reducing energy while enhancing overall operational efficiency.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Physics-Informed Reinforcement Learning Framework for Economic-Thermal Co-Optimization of Crypto Mining Data Centers: Preprint

The rapid expansion of cryptocurrency mining has created a new class of high-density data centers characterized by extreme thermal flux and high sensitivity to volatile economic markets. Traditional thermal management strategies, typically reliant on rule-based control, maintain static setpoints that fail to account for fluctuating electricity prices and cryptocurrency values - factors critical to mining profitability. To address this, we present a physics-informed reinforcement learning (PIRL) framework for economic-thermal co-optimization in crypto mining data centers. This framework consists of a proximal policy optimization (PPO) agent, a virtual testbed powered by high-fidelity physics-based models, and an interactive frontend dashboard. The PPO agent is trained using the virtual testbed and strict hardware safety limits. This physics-informed approach allows the agent to learn a stochastic policy that dynamically balances mining revenue against operational costs by co-optimizing HVAC cooling setpoints and IT computational hashrate. The simulation results demonstrate that the integrated framework achieved an 8.62% increase in net operational profit compared to traditional baseline strategies while strictly adhering to safety-critical temperature constraints (coolant supply temperature < 32 degrees C). This work provides a scalable template for the deployment of reinforcement learning in mission critical facilities where economic volatility and physical safety must be managed simultaneously.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Field Validation of a Grid-Interactive Efficient Building Software Solution

The U.S. General Services Administration's (GSA's) Green Proving Ground (GPG) program, in partnership with the National Laboratory of the Rockies (NLR), completed a field study of a Grid-Interactive Efficient Buildings (GEB) software solution. The study focused on a single testbed facility to test the GEB functionality of the software solution, along with other features. The testbed facility - a courthouse - is a common building type in GSA's vast building portfolio, offering potentially impactful findings on a scalable level. The study evaluated Prescriptive Data's technology, Nantum OS, a connected building operating system ("GEB Solution") which aggregates multiple sources of previously siloed building data and combines that data with external sources, such as weather information or utility signals, into a single integrated platform. A GEB Solution is a type of Energy Management Information System (EMIS). EMIS is defined as a system of devices, data services, and software applications that communicates with any building system or third-party data source to aggregate and transform data into new capabilities to aid in the optimization of energy use at the building, campus, or agency level. This specific GEB Solution is an EMIS with ASO, automated system optimization, offering supervisory control of certain aspects of the Building Automation System (BAS). Multiple features were evaluated including, but not limited to, Continuous Demand Management to avoid setting new monthly kilowatt (kW) peaks, energy efficiency for reduction of kilowatt hours (kWh) and natural gas consumption, and automated demand response (ADR) for purposes of lowering demand during a utility called Demand Response (DR) event. The testbed facility was the Foley Federal Building and US Courthouse ("Foley Federal Building") located in Las Vegas, NV. This is a 209,496 sq. ft. building constructed in the 1960s with major renovations in 2004. The facility was a good candidate due to the large prevalence of office and courthouse spaces in the GSA portfolio of buildings. It also has many features which allow integration into and control of the building and a strong facilities team to assist with the study. Quantitative and qualitative performance objectives were developed using GSA's GPG GEB project template along with input from the vendor and building facility staff; these are outlined in Table 1. The quantitative performance objectives focused on continuous demand management, energy efficiency, and automated demand response. The qualitative performance objectives focused on the ease of installation and commissioning as well as the operability of the GEB solution. Other performance metrics that are reported on include carbon reduction, cost effectiveness, and occupant acceptance.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗