Engineering PapersSearch

SEARCH · Engineering Papers

Results for “FEMP”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

FEMP Cybersecurity Arsenal

The FEMP Cyber Security Arsenal is a family of cyber security tools for the federal facility owners and operators. Using these tools, facility owners can evaluate their overall cybersecurity posture. These tools are web-based front-end tools. The tools are meant to help federal owners and operators to evaluate their overall cybersecurity posture. These tools are developed based on the NIST Cybersecurity framework, risk management framework, and DOE C2M2 architectures. Version 3 provides significant updates and features in ten areas

Ashley, Travis [Pacific Northwest National Laborat

Federal Home-to-Work Electric Vehicle Program Guide

This document serves as a comprehensive resource for Federal agencies in developing their own program resources that promote the efficient and effective use of electric vehicles (EVs) for home-to-work travel while ensuring compliance with Federal regulations and sustainability objectives. One mission of the U.S. Department of Energy's Federal Energy Management Program (FEMP) Fleet program is to help federal fleet managers meet or exceed statutory requirements related to energy and environmental performance while improving overall fleet efficiency, reducing costs, and meeting mission requirements. To further this mission, FEMP provides resources to support Federal agencies with increasing alternative fuel vehicle (AFV) acquisitions and reducing petroleum use. EVs are AFVs and help agencies meet federal fleet requirements. Federal fleets include government-owned EVs used for home-to-work travel. The purpose of this document is to serve as a guide for Federal agencies in developing their own internal program documents to manage government-owned EVs used for home-to-work travel. Federal agencies should consult their counsel and consider their own policies and authorities in the implementation of any policies or best practices regarding government-owned EVs used for home-to-work travel. The guide provides key considerations for agencies, including launching a pilot program to fine-tune best practices, conducting a cost-benefit analysis to compare home versus public charging, and exploring cost-effective solutions, such as installing standard outlets instead of dedicated charging stations. The guide underscores the importance of legal and financial considerations, such as verifying agency authority to install home charging infrastructure at an employee's home, ensuring the availability and appropriateness of using agency funds for home charging infrastructure, and understanding the tax implications of reimbursements.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Performance Assurance Planning Guide for Utility Energy Service Contracts: 2025 Edition

Administered by the U.S. Department of Energy's (DOE) Federal Energy Management Program (FEMP), the Utility Program has fostered collaboration among federal agencies and their serving utilities for more than 25 years. The Utility Program supports agencies using Utility Energy Service Contracts (UESCs), a well-developed, effective contracting vehicle that enable the latest approaches to cost-effective energy management at federal sites. Federal agencies have successfully used UESCs to award over 2,000 energy and water efficiency and renewable energy projects, investing approximately $\$$2.8 billion in furthering the Federal Government's efforts to reduce energy intensity. Authorized by 42 U.S. Code section 8256 (10 U.S. Code section 2913 for the Department of Defense), a UESC is a limited-source acquisition between a federal agency and an eligible serving utility for energy management services that generate savings from the implementation of energy- and water -conservation measures (collectively referred to as ECMs), with 42 U.S. Code section 8287 (Defense Federal Acquisition Regulation Supplement, Part 241), providing the term of a UESC, which may extend up to 25 years. Through a UESC, the utility partner assesses designs, and implements the desired ECMs - which can range from lighting retrofits and renewable energy systems, to combined heat and power plants or other technologies and strategies, and may provide financing for the project. The agency may use any combination of appropriations and third-party financing to pay for the project, providing useful flexibility. There is no limit to the project size, big or small, that can be implemented using a UESC. To assist agencies implementing a UESC, FEMP has developed a Utility Energy Service Contract Guide and this companion guidance document to help agencies and their utility partners better understand the best practices for to ensure UESCs continue to perform and generate savings throughout their performance period. These best practices utilize a combination of effective project management, communication, documentation, and a detailed Performance Assurance Plan. This plan is a project specific set of actionable protocols that define important tasks and responsibilities throughout the contract term and reflects the site conditions, complexities, agency capabilities, and operating and maintaining planned ECMs.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Case Studies in Leveraging Performance Contracts for Resilience Projects

The resilience of federal facilities has become increasingly important among lawmakers, agency leadership, and the American public as high impact natural hazards occur more frequently over time. Resilience is broadly defined as the ability of a federal facility to withstand, respond to, and recover rapidly from disruptions to maintain critical functions. The Department of Energy (DOE) Federal Energy Management Program (FEMP) was codified to facilitate the strengthening of federal energy and water efficiency and resilience. Performance contracting is one of the mechanisms through which federal agencies can finance projects at their facilities, but resilience improvement measures do not always result in utility cost savings, which are the primary driver behind performance contracts. This report provides example cases where performance contracts, specifically energy savings performance contracts (ESPC) or utility energy service contracts (UESCs), were used to implement a resilience measure at a federal facility.

99 GENERAL AND MISCELLANEOUS

Customizable Technical Specifications for Lithium-Ion Battery Storage Projects

Learn how to navigate the FEMP Lithium-ion Battery Storage Technical Specifications, a key resource for federal agencies developing onsite energy storage projects. This webinar, led by technical experts, will provide a step-by-step walkthrough of the specifications, supplemented with a real-world case study. Gain practical insights to support successful battery storage project development and implementation.

25 ENERGY STORAGE

Life-Cycle Cost Analysis Framework for Water Efficiency Measures

Life-Cycle Cost Analysis Framework for Water Efficiency Measures: Guidance Designed for Federal Agencies (hereafter referred to as “this report”) provides a technical framework for federal agencies to conduct a life-cycle cost analysis (LCCA) for water efficiency projects in accordance with 42 U.S.C. § 8253. This report leverages insights from the 2023 report, PNNL-34006, Water and Wastewater Annual Price Escalation Rates for Selected Cities Across the United States: 2023 Edition (Unger et al. 2023). The primary objective of this report is to provide a framework to assist federal agencies with evaluating the full economic impact of water efficiency projects by assessing both initial investments and long-term operational benefits. An LCCA can provide a comprehensive view of all costs associated with a water efficiency project, including initial investment, ongoing operations and maintenance (O&M), and eventual disposal or replacement, ensuring the most cost-effective solution is selected. The LCCA methodology outlined in this report enables users to compare base case scenarios with potential alternatives using a standardized present value approach. It incorporates key cost components such as energy, water and wastewater, installation, O&M, and equipment replacement. Additionally, the framework introduces relevant evaluation metrics, such as the net savings and the savings-to-investment ratio, to ensure that water efficiency measures are economically justified over the lifespan of the project. To support practical application, this report also describes various water efficiency strategies that may be analyzed using an LCCA, including plumbing retrofits, irrigation upgrades, alternative water use, and cooling system improvements. By applying this framework, federal agencies can ensure compliance with regulatory mandates while maximizing the return on investment and contributing to resilient water management practices. The information provided in this report is aligned with the Federal Energy Management Program (FEMP) life-cycle cost (LCC) methodology, as conveyed in National Institute of Standards and Technology (NIST) Handbook 135 (Kneifel and Webb 2022). This report is intended to provide relatively high-level guidance, acting as a complement to, rather than a substitute for, that resource.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Critical Energy Infrastructure Cybersecurity: Enhanced Cyber Resilience for Federal Energy Systems

This presentation is an overview of FEMP Resilient and Secure Infrastructure and Facilities. An educational and interactive workshop centered on resilient and secure federal infrastructure and facilities, with a focus on inverter-based resources at Federal sites, building automation systems, and Federal supply chains. This workshop will illustrate an all-hazards scenario and discuss how Federal agencies can be positioned to resist these real-world scenarios.

97 MATHEMATICS AND COMPUTING

REopt Federal User Support Session Two

This presentation is for FEMP's second user support session for federal REopt users. These sessions cover topics such as: overviews of REopt capabilities, hands-on REopt trainings and demonstrations, discussion and feedback about the tool and user support, federal REopt case studies and success stories, and links to REopt resources. This particular session covers discussion about federal onsite energy projects and challenges, using REopt to evaluate air-source and geothermal heat pumps, a federal success story about using REopt for heat pump analysis, a summary of available resources, and open question and answer session.

14 SOLAR ENERGY

Federal Water Management Planning Manual

FEMP developed this Federal Water Management Planning Manual to provide a resource for designing a comprehensive water management program. The manual describes strategies to optimize water use at federal facilities, use water balance analysis methods, identify design elements and procurement best practices, and expand use of alternative water.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Determining Price Reasonableness in Energy Performance Contracts

Report provides recommendations and best practices concerning fair and reasonable price determination in federal energy performance contracts (EPCs), which include energy savings performance contracts (ESPCs) and utility energy service contracts (UESCs). It reflects the experiences, lessons learned, and best practices of agencies implementing EPCs, and is consistent with FEMP’s training on this subject. This is an update to the 2015 revision.

Dominy, Russ [Boston Government Services (BGS)]

Federal Workplace Charging Program Guide

The 2015 Fixing America's Surface Transportation (FAST) Act authorizes the installation, operation, and maintenance of electric vehicle supply equipment (EVSE) for the purpose of recharging employees' privately owned vehicles (POVs) under the custody or control of the General Services Administration (GSA) or a Federal agency. It requires the collection of fees to recover the costs of installing, operating, and maintaining this equipment and imposes reporting requirements. This program guide reviews those requirements, excerpts the relevant language in Appendix A, and describes when and how fees may be required to cover costs of electricity, network costs, EVSE units, and installations in various scenarios. This program guide is designed to support Federal agencies developing and refining workplace charging programs for employee POVs. While it provides guidance and best practices, it does not replace agencywide policies or agency-specific legal counsel. It contains a roadmap for agency workplace charging programs and defines roles and responsibilities. This guide explains how to determine the number of POVs likely to charge at a given site and contains a sample employee survey in Appendix B. It reviews EVSE planning, including unit selection and acquisition, charger location(s), accounting for available power capacity, using existing infrastructure, and funding an incentive program. It also discusses the costs associated with EVSE acquisition, installation, and network management. These costs inform the subsequently provided information, which describes how to amortize costs to determine appropriate fees for each charging session. The final two sections of this guide address aspects of ongoing program management that the facility coordinator should consider and the reporting requirements associated with the FAST Act. The insights in this guide are applicable to all agency-owned and GSA-leased buildings or facilities offering the use of EVSE or a 120-volt receptacle for the purpose of recharging an employee's POV. However, the FAST Act requirements typically do not apply to any building or facility operated and maintained by a third-party vendor offering the use of EVSE as part of a commercial building lease unless the agency is managing the station and/or energy on behalf of the building and collecting POV fees.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Data Center Energy Efficiency

Fact sheet describes how the Federal Energy Management Program helps federal agencies implement data center energy efficiency projects.

Kam, Kendall [US Department of Energy (USDOE) Fede