Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CIP”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Formation of high electrical-resistivity thin surface layer on carbonyl-iron powder (CIP) and thermal stability of nanocrystalline structure and vortex magnetic structure of CIP

This study focuses on the carbonyl-iron powder (CIP) used in the metal composite bulk magnetic core for high-efficient/light-weight SiC/GaN power device MHz switching dc-dc converter, where the fine CIP with a mean diameter of 1.1 μm is used to suppress the MHz band eddy current inside the CIP body. When applying the CIP to composite core together with the resin matrix, high electrical resistivity layer must be formed on the CIP-surface in order to suppress the overlapped eddy current between adjacent CIPs. In this study, tens nm thick silica (SiO{sub 2}) was successfully deposited on the CIP-surface by using hydrolysis of TEOS (Si(OC{sub 2}H{sub 5}){sub 4}). Also tens nm thick oxidized layer of the CIP-surface was successfully formed by using CIP annealing in dry air. The SiC/GaN power device can operate at ambient temperature over 200 degree-C, and the composite magnetic core is required to operate at such ambient temperature. The as-made CIP had small coercivity below 800 A/m (10 Oe) due to its nanocrystalline-structure and had a single vortex magnetic structure. From the experimental results, both nanocrystalline and single vortex magnetic structure were maintained after heat-exposure of 250 degree-C, and the powder coercivity after same heat-exposure was nearly same as that of the as-made CIP. Therefore, the CIP with thermally stable nanocrystalline-structure and vortex magnetic state was considered to be heat-resistant magnetic powder used in the iron-based composite core for SiC/GaN power electronics.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Use of Monte Carlo simulation to quantify CIPS risk

Crud Induced Power Shift (CIPS), caused by the accumulation of boron compounds in corrosion product deposits on high power fuel assemblies, is an important operational issue for Pressurized Water Reactors (PWRs). The Boron-induced Offset Analysis (BOA) computer code has been developed by EPRI in collaboration with Westinghouse to help utility engineers avoid onset of CIPS. The code, used with an established procedure, predicts the maximum boron mass that will be accumulated in the upcoming cycle for a given core design and plant chemistry and operating program. The calculated boron mass above a given threshold predicts the risk of CIPS to the upcoming cycle. BOA has been successful in correctly predicting the risk for onset or lack of CIPS in many cycles. However, like most codes modeling complex physical phenomena, it is subject to uncertainties in several of the inputs used to describe these phenomena. The current BOA procedure results in a single 'best estimate' prediction, which has been judged to provide engineers with a practical way to assess CIPS risk. As such, however, there is a probability that the actual plant CIPS performance may be underestimated. This paper describes a method to assess the probability (with an associated confidence level) of no CIPS, mild to moderate CIPS, or severe CIPS using BOA for a given core design. This is accomplished through the use of a Monte Carlo simulation. The simulation is applied to several plant examples, and the results are evaluated in terms of the likelihood of mild or severe CIPS. A suggested set of criteria for decision making regarding CIPS risk is presented in the conclusion. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

CIP Training Manual: Collaborative Information Portal Advance Training Information for Field Test Participants

The Collaborative Information Portal (CIP) is a web-based information management and retrieval system. Its purpose is to provide users at MER (Mars Exploration Rover) mission operations with easy access to a broad range of mission data and products and contextual information such as the current operations schedule. The CIP web-server provides this content in a user customizable web-portal environment. Since CIP is still under development, only a subset of the full feature set will be available for the EDO field test. The CIP web-portal will be accessed through a standard web browser. CIP is intended to be intuitive and simple to use, however, at the training session, users will receive a one to two page reference guide, which should aid them in using CIP. Users must provide their own computers for accessing CIP during the field test. These computers should be configured with Java 1.3 and a Java 2 enabled browser. Macintosh computers should be running OS 10.1.3 or later. Classic Mac OS (OS 9) is not supported. For more information please read section 7.3 in the FIASCO Rover Science Operations Test Mission Plan. Several screen shots of the Beta Release of CIP are shown on the following pages.

Schreiner, John↗

CIPS Validation Data Plan

This report documents analysis, findings and recommendations resulted from a task 'CIPS Validation Data Plan (VDP)' formulated as an POR4 activity in the CASL VUQ Focus Area (FA), to develop a Validation Data Plan (VDP) for Crud-Induced Power Shift (CIPS) challenge problem, and provide guidance for the CIPS VDP implementation. The main reason and motivation for this task to be carried at this time in the VUQ FA is to bring together (i) knowledge of modern view and capability in VUQ, (ii) knowledge of physical processes that govern the CIPS, and (iii) knowledge of codes, models, and data available, used, potentially accessible, and/or being developed in CASL for CIPS prediction, to devise a practical VDP that effectively supports the CASL's mission in CIPS applications.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Observations of Typhoon Generated Gravity Waves From the CIPS and AIRS Instruments and Comparison to the High-Resolution ECMWF Model

The satellite-based Cloud Imaging and Particle Size (CIPS) instrument and Atmospheric Infrared Sounder (AIRS) observed concentric gravity waves (GWs) generated by Typhoon Yutu in late October 2018. This work compares CIPS and AIRS nadir viewing observations of GWs at altitudes of 50–55 and 30–40 km, respectively, to simulations from the high-resolution European Centre for Medium-Range Weather Forecasting Integrated Forecasting System (ECMWF-IFS) and ECMWF reanalysis v5 (ERA5). Both ECMWF-IFS with 9 km and ERA5 with 31 km horizontal resolution show concentric GWs at similar locations and timing as the AIRS and CIPS observations. The GW wavelengths are ∼225–236 km in ECMWF-IFS simulations, which compares well with the wavelength inferred from the observations. After validation of ECMWF GWs, five category five typhoon events during 2018 are analyzed using ECMWF to obtain characteristics of concentric GWs in the Western Pacific regions. The amplitudes of GWs in the stratosphere are not strongly correlated with the strength of typhoons, but are controlled by background wind conditions. Our results confirm that amplitudes and shapes of concentric GWs observed in the stratosphere and lowermost mesosphere are heavily influenced by the background wind conditions.

gravity wave↗

U.S. Department of Energy Competitiveness Improvement Project (CIP) 2024 Small Turbine Certification and/or Listing Awardee: Sonsight Wind

This fact sheet describes the 2024 Competitiveness Improvement Project (CIP) award received by Sonsight Wind for Small Turbine Certification and/or Listing. The U.S. Department of Energy's (DOE's) CIP awards cost-shared subcontracts and technical support to manufacturers of small and medium-sized wind turbines. Managed by NREL on behalf of DOE's Wind Energy Technologies Office, CIP helps advance wind energy as a cost-effective, distributed generation technology option.

17 WIND ENERGY↗

U.S. Department of Energy Competitiveness Improvement Project (CIP) 2024 Technology Commercialization Awardee: Siva Powers America Inc.

This fact sheet describes the 2024 Competitiveness Improvement Project (CIP) award received by Siva Powers America Inc. for a Technology Commercialization Award. The U.S. Department of Energy's (DOE's) CIP awards cost-shared subcontracts and technical support to manufacturers of small and medium-sized wind turbines. Managed by NREL on behalf of DOE's Wind Energy Technologies Office, CIP helps advance wind energy as a cost-effective, distributed generation technology option.

17 WIND ENERGY↗

U.S. Department of Energy Competitiveness Improvement Project (CIP) 2024 Manufacturing Process Innovation Awardee: Bergey Windpower Co.

This fact sheet describes the 2024 Competitiveness Improvement Project (CIP) award received by Bergey Windpower Co. for manufacturing process innovation. The U.S. Department of Energy's (DOE's) CIP awards cost-shared subcontracts and technical support to manufacturers of small and medium-sized wind turbines. Managed by NREL on behalf of DOE's Wind Energy Technologies Office, CIP helps advance wind energy as a cost-effective, distributed generation technology option.

17 WIND ENERGY↗

U.S. Department of Energy Competitiveness Improvement Project (CIP) 2024 Component Innovation Awardee: Windurance LLC

This fact sheet describes the 2024 Competitiveness Improvement Project (CIP) award received by Windurance LLC for component innovation. The U.S. Department of Energy's (DOE's) CIP awards cost-shared subcontracts and technical support to manufacturers of small and medium-sized wind turbines. Managed by NREL on behalf of DOE's Wind Energy Technologies Office, CIP helps advance wind energy as a cost-effective, distributed generation technology option.

17 WIND ENERGY↗

U.S. Department of Energy Competitiveness Improvement Project (CIP) 2024 Small Turbine Certification and/or Listing Awardee: NPS Solutions LLC

This fact sheet describes the 2024 Competitiveness Improvement Project (CIP) award received by NPS Solutions LLC for Small Turbine Certification and/or Listing. The U.S. Department of Energy's (DOE's) CIP awards cost-shared subcontracts and technical support to manufacturers of small and medium-sized wind turbines. Managed by NREL on behalf of DOE's Wind Energy Technologies Office, CIP helps advance wind energy as a cost-effective, distributed generation technology option.

17 WIND ENERGY↗

U.S. Department of Energy Competitiveness Improvement Project (CIP) 2024 Small Turbine Certification and Listing Awardee: Uprise Energy

This fact sheet describes the 2024 Competitiveness Improvement Project (CIP) award received by Uprise Energy for small turbine certification and listing. The U.S. Department of Energy's (DOE's) CIP awards cost-shared subcontracts and technical support to manufacturers of small and medium-sized wind turbines. Managed by NREL on behalf of DOE's Wind Energy Technologies Office, CIP helps advance wind energy as a cost-effective, distributed generation technology option.

17 WIND ENERGY↗

U.S. Department of Energy Competitiveness Improvement Project (CIP) 2024 Technology Commercialization Awardee: EWT Americas Inc.

This fact sheet describes the 2024 Competitiveness Improvement Project (CIP) award received by EWT Americas, Inc., for technology commercialization. The U.S. Department of Energy's (DOE's) CIP awards cost-shared subcontracts and technical support to manufacturers of small and medium-sized wind turbines. Managed by NREL on behalf of DOE's Wind Energy Technologies Office, CIP helps advance wind energy as a cost-effective, distributed generation technology option.

17 WIND ENERGY↗

U.S. Department of Energy Competitiveness Improvement Project (CIP) 2024 Prototype Installation and Testing Awardee: Accelerate Wind

This fact sheet describes the 2024 Competitiveness Improvement Project (CIP) award received by Accelerate Wind for Prototype Installation and Testing. The U.S. Department of Energy's (DOE's) CIP awards cost-shared subcontracts and technical support to manufacturers of small and medium-sized wind turbines. Managed by NREL on behalf of DOE's Wind Energy Technologies Office, CIP helps advance wind energy as a cost-effective, distributed generation technology option.

17 WIND ENERGY↗

U.S. Department of Energy Competitiveness Improvement Project (CIP) 2024 Prototype Installation and Testing Awardee: Pecos Wind Power

This fact sheet describes the 2024 Competitiveness Improvement Project (CIP) award received by Pecos Wind Power for Prototype Installation and Testing. The U.S. Department of Energy's (DOE's) CIP awards cost-shared subcontracts and technical support to manufacturers of small and medium-sized wind turbines. Managed by NREL on behalf of DOE's Wind Energy Technologies Office, CIP helps advance wind energy as a cost-effective, distributed generation technology option.

17 WIND ENERGY↗

U.S. Department of Energy Competitiveness Improvement Project (CIP) 2024 Inverter Listing Awardee: Eocycle America Corporation

This fact sheet describes the 2024 Competitiveness Improvement Project (CIP) award received by Eocycle America Corporation for Inverter Listing. The U.S. Department of Energy's (DOE's) CIP awards cost-shared subcontracts and technical support to manufacturers of small and medium-sized wind turbines. Managed by NLR on behalf of DOE, CIP helps advance wind energy as a cost-effective, distributed generation technology option.

17 WIND ENERGY↗

CASL L1 Milestone Report: CASL.P4.01, Sensitivity and Uncertainty Analysis for CIPS with VIPRE-W and BOA

The CASL Level 1 Milestone CASL.P4.01, successfully completed in December 2011, aimed to 'conduct, using methodologies integrated into VERA, a detailed sensitivity analysis and uncertainty quantification of a crud-relevant problem with baseline VERA capabilities (ANC/VIPRE-W/BOA).' The VUQ focus area led this effort, in partnership with AMA, and with support from VRI. DAKOTA was coupled to existing VIPRE-W thermal-hydraulics and BOA crud/boron deposit simulations representing a pressurized water reactor (PWR) that previously experienced crud-induced power shift (CIPS). This work supports understanding of CIPS by exploring the sensitivity and uncertainty in BOA outputs with respect to uncertain operating and model parameters. This report summarizes work coupling the software tools, characterizing uncertainties, and analyzing the results of iterative sensitivity and uncertainty studies. These studies focused on sensitivity and uncertainty of CIPS indicators calculated by the current version of the BOA code used in the industry. Challenges with this kind of analysis are identified to inform follow-on research goals and VERA development targeting crud-related challenge problems.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Securing Grid Communications Infrastructure: Addressing Gaps Beyond NERC CIP Facility Perimeters

The North American electric grid relies on a complex communications infrastructure that extends beyond facility perimeters traditionally covered by NERC Critical Infrastructure Protection (CIP) standards. While CIP requirements have significantly strengthened cybersecurity within Electronic Security Perimeters, many operational communications—such as those between control centers, substations, and third-party networks—fall outside current regulatory scope. As grid modernization introduces new technologies and connectivity models, these external pathways present evolving security challenges. This brief explores the nature of these challenges, including emerging attack vectors and supply chain considerations, and highlights how ongoing grid transformation increases exposure to sophisticated threats. It outlines practical strategies and policy options to complement existing standards, such as expanding secure communications practices, enhancing supply chain transparency, and fostering collaboration among federal, state, and industry stakeholders. Near-term actions like encryption, authentication, and contractual safeguards can help reduce risk while longer-term frameworks are developed to ensure resilient and secure grid operations.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

A COUPLED TH/NEUTRONICS/CRUD FRAMEWORK IN PREDICTION OF CIPS PHENOMENON

A coupled TH/Neutronics/CRUD framework, which is able to simulate the CRUD deposits impact on CIPS phenomenon, was described in this paper. This framework includes the coupling among three essential physics, thermal-hydraulics, CRUD and neutronics. The overall framework was implemented by using the CFD software STAR-CCM+, developing CRUD codes, and using the neutronics code DeCART. The coupling was implemented by exchanging data between softwares using intermediate exchange files. A typical 3 by 3 PWR fuel pin problem was solved under this framework. The problem was solved in a 12 months length period of time. Time-dependent solutions were provided, including CRUD deposits inventory and their distributions on fuels, boron hideout amount inside CRUD deposits, as well as power shape changing over time. The results clearly showed the power shape suppression in regions where CRUD deposits exist, which is a strong indication of CIPS phenomenon.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗