DOE OSTI · 2305669
Switching-Cycle-Based Startup for Grid-tied Inverters
Abstract
This paper presents a novel switching cycle-based startup approach that eliminates the need for voltage sensors and phase-locked loops. Here, the proposed method surpasses the bandwidth limitations inherent in traditional PLL-based synchronization techniques and attains grid synchronization of the inverter within two switching cycles. Despite the absence of voltage sensors and PLLs, this synchronization is achieved without inrush currents. Furthermore, the startup method does not necessitate the addition of any hardware or an increase in software complexity. Simulation and experimental results are presented to verify the effectiveness of the proposed method.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
He, Yuchen, Li, Yuan, Zhou, Bokang, Peng, Fang Z.. 2023-06-14. Switching-Cycle-Based Startup for Grid-tied Inverters. https://doi.org/10.1109/cpe-powereng58103.2023.10227483
Cite the original work for its findings. Save a collection to share your selection of sources.