Engineering Papers⌕ Search

Engineering topics

Garnett, Robert William

Publications and source records attributed to Garnett, Robert William.

Area-A Options Cost Estimate Report

Five options for re-establishing various configurations of beam to LANSCE Area A were considered. Bottoms up cost estimates to implement three of the options were developed. The two options not costed were considered too complex and too expensive compared with the other options based on their relative benefits to experimental programs at LANSCE.

43 PARTICLE ACCELERATORS↗

LANSCE Facility Longevity Assessment

This LANSCE Facility Longevity Assessment examined 34 total systems critical to the operation of the LANSCE accelerator complex. These systems are primarily owned, operated, and maintained by AOT Division. Based on the criteria used in this assessment, there are 12 AOT Division systems that are potential high risk as related to longterm LANSCE operations. These systems may also impact the success of LAMP. Also summarized in this report are the facility activities planned over the next decade. These include general facility maintenance and infrastructure upgrades, as well as planned electrical system upgrades. The LANSCE Facility Operations (LFO) Division is responsible for this activity scope and budget planning. Most of the planned activities are general in nature and should have little impact on accelerator operations or LAMP activities as currently envisioned. However, close coordination with between AOT, LFO, and LAMP would be prudent. A next step should be to develop an actionable plan to address the high-risk systems. Potential criteria for developing such a plan could include: (1) Evaluating the global impact of the system (operations, program, safety, etc.), (2) Ranking by impact (ranked now by risk), (3) Estimating cost to implement the corrective actions (Is there already a plan or not?), and (4) Estimating the time required for corrective actions. An alternative could include integration of the assessment data into both the Asset Management System and the Maintenance Analytics Risk Register.

43 PARTICLE ACCELERATORS↗

LANSCE CCL Performance Limits

This report summarizes the performance limits of the LANSCE Coupled-Cavity Linac (CCL). These results are captured or summarized directly from the references cited. This report was written in support of the LANSCE Modernization Project (LAMP). Many factors contribute to the performance limits of the CCL accelerator system. One performance limit is set by the CCL mechanical structure and available cooling. Heating of the structure is ultimately linked to the operating RF duty factor of the CCL. Another performance limit is set by the maximum RF and beam duty factors that can be supported by the 805-MHz klystrons and associated HVDC power supplies. The RF and HVDC systems also set limits for the maximum peak beam current that can be accelerated in the CCL. And finally, a maximum beam current limit is set by the beam dynamics determined by the details of the CCL physics design (number of cells per CCL tank, accelerating gradients, magnetic focusing lattice, beam losses, etc.). This limit can be informed by both simulation results and beam measurement data, if available. A detailed explanation of each performance limit is given in the sections below. The results are summarized in the table below. In all cases, it is assumed that the CCL and the RF system are operating in their nominal beam production configuration – nominal magnet set points and nominal cavity fields, unless otherwise specified.

43 PARTICLE ACCELERATORS↗

LAMP Technical Readiness Evaluation Report (Rev. 1)

An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed. Corresponding Technical Readiness Levels (TRLs) were also determined for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. The scope of the evaluation was limited to the project Work Breakdown Structure (WBS) elements as defined for the RFQ Injector and Drift Tube Linac (DTL) systems only. Integration of Instrumentation and Controls (I&C) and Safety Systems was not considered, although specific technologies as related to the RFQ and DTL systems were included. Other elements of the project such as Shielding, System Design, Technical Management, and additional facility integration needed to enable off-line testing and pre-installation commissioning were also not evaluated. Each technical subsystem element was evaluated for technical readiness, however, not all were found to meet the criteria for a CTE. Only two subsystem elements were determined to meet the CTE criteria. Their associated TRLs are summarized in the table below. These subsystem elements of the project have the lowest technical readiness due to either being new, novel or modified, requiring additional R&D before being capable of meeting the project Key Performance Parameters (KPPs) and subsystem requirements, or present technology exists but has not yet been demonstrated in a relevant environment. All other subsystems were determined to have a TRL of 8, indicating that actual operating systems exist having similar performance requirements as needed for LAMP. Details of the technical readiness evaluation for each subsystem is given in the following sections of this report.

43 PARTICLE ACCELERATORS↗

High Brightness High Duty Factor Negative Ion Beam Injector [Slides]

The high brightness negative ion injector combines multiple individual low-duty-factor H- ion sources (multiplexing) in a manner that allows flexibility in final pulse format and beam duty factor up to CW and increases reliability by eliminating an otherwise single-point failure usually associated with using a single ion source. The multiplexing of multiple beams in new injector system also preserves the beam quality of each individual ion source, eliminating a significant source of beam quality degradation usually associated with combining beams.

43 PARTICLE ACCELERATORS↗

ORNL D-Li Fusion Neutron Facility - Accelerator Systems Cost Report

Several past design studies were reviewed and an analysis of alternatives completed to assess the range of accelerator parameters and accelerating structure types that can potentially meet the requirements of a 125-mA, 40-MeV, D-Li Fusion Neutron Facility. The design studies reviewed included past LANL designs for IFMIF and designs based on the use of modified versions of the LANL LEDA. Also reviewed were the past IFMIF-EVEDA design iterations that explored several options for the main linac including the use of an Alvarez DTL, interdigital accelerating structures, and a superconducting RF half-wave resonator {SCRF HWR) based main linac.

43 PARTICLE ACCELERATORS↗

LANSCE Accelerator Update and Future Plans

Several multi-year accelerator system upgrades have recently been completed at LANSCE that will ensure the long-term future of beam operations to its users and to prepare for a planned next-generation signature facility (MaRIE) based on multi-probe capabilities. Present LANSCE accelerator operations will be discussed. As a result, a summary of the recent upgrades completed and future plans will also be presented.

43 PARTICLE ACCELERATORS↗

Intense combined source of neutrons and photons for interrogation based on compact deuteron RF accelerator

Interrogation of special nuclear materials can benefit from mobile sources providing significant fluxes of neutrons (10 8 /s at 2.5 MeV, 10 10 /s at 14.1 MeV) and of photons (>10 12 /s at 1-3 MeV). We propose a source that satisfies these requirements simultaneously plus also provides, via the reaction 11 B(d,n) 12 C(γ 15.1 ), a significant flux of 15-MeV photons, which are highly penetrating and optimal for inducing photo-fission in actinides. The source is based on a compact (< 5 m) deuteron RF accelerator that delivers an average current of a few mA of deuterons at 3-4 MeV to a boron target. The accelerator consists of a short RFQ followed by efficient inter-digital H-mode structures with permanent-magnet-quadrupole beam focusing [Kurennoy et al. (2012)], which suit perfectly for deuteron acceleration at low energies. Our estimates, based on recent measurements, indicate that the required fluxes of both neutrons and photons can be achieved at ~1 mA of 4-MeV deuterons. The goal of the proposed study is to confirm feasibility of the approach and develop requirements for future full system implementation.

43 PARTICLE ACCELERATORS↗

Radiography Capabilities for Matter-Radiation Interactions in Extremes

The Matter-Radiation Interactions in Extremes (MaRIE) experimental facility will be used to discover and design the advanced materials needed to meet 21st century national security and energy security challenges. This new facility will provide the new tools scientists need to develop next-generation materials that will perform predictably and on-demand for currently unattainable lifetimes in extreme environments. The MaRIE facility is based on upgrades to the existing LANSCE 800-MeV proton linac and a new 12-GeV electron linac and associated X-ray FEL to provide simultaneous multiple probe beams, and new experimental areas. In addition to the high-energy photon probe beam, both electron and proton radiography capabilities will be available at the MaRIE facility. Recently, detailed radiography system studies have been performed to develop conceptual layouts of high-magnification electron and proton radiography systems that can meet the experimental requirements for the expected first experiments to be performed at the facility. A description of the radiography systems, their performance requirements, and a proposed facility layout are presented.

43 PARTICLE ACCELERATORS↗

An Electron Beam Test Facility (EBTF) for TA-53

A dedicated facility for electron-beam R&D would significantly increase the viability of the Accelerator and Electrodynamics capability at LANL. Such a facility would provide access to a high-quality source of nearly-relativistic electrons, sufficient experimental and data acquisition capabilities, and flexibility to enable a broad range of fundamental and applied accelerator and beam physics experiments. Such a facility would cost-effectively meet the needs of a broad set of projects and sponsors ranging from LANL LDRD, DOE Office of Science, NNSA Global Security, Threat Reduction, and others. Implementation of such a facility at TA-53 would allow technical resources for Accelerator and Electrodynamics capability development to remain within LANL while meeting many important mission needs that can only be met through such a facility, allowing technical capability and technical expertise to co-reside.

43 PARTICLE ACCELERATORS↗