Engineering Papers⌕ Search

Engineering topics

Holzer, Jesse T.

Publications and source records attributed to Holzer, Jesse T..

Large-scale Hydrogen Storage Risk Assessment

This project investigated risks involved in deploying a large-scale hydrogen storage system at the Port of Seattle (hereafter, the Port) for its on-terminal and maritime applications in an urban industrial setting. Alongside, the project attempted to address some of the barriers to risk assessment such as need for an exact system design for a systematic investigation, direct access to surrounding communities to gauge their perceptions, and an integrated software required to undertake a full-fledged risk assessment. These barriers were overcome using illustrative reference station designs, engaging with community-facing agencies through Port support, and pooling national laboratory capabilities available for risk assessments. The project identified relevant public safety risk metrics, compared various hydrogen carriers, engaged with community-facing agencies, and explored potential gaps in existing safety codes and standards. The primary impacts of this project include the development of risk assessment guidance for ports and utilities, informing them of the trade-offs in the choice of hydrogen carriers, and the ability to increase public capacity for dialog and engagement. This paves the way toward decarbonization of the Port activities, bringing about awareness around jobs in the market for risk assessments, and the need to ramp up community engagement long before any hydrogen system deployment is undertaken.

08 HYDROGEN↗

Model Formulations: Integrating Distributed Energy Resources (DER) using Advanced Unit Commitment Models and DER Aggregation Methodologies

A distribution energy resource aggregator (DERA) constitutes a group of distribution energy resources with small generation capacities which meet the threshold to participate in the electricity wholesale market. This document provides the proposed DERA model formulation that will be implemented in the SCUC simulation’s architecture for the SCUC-DER project. Different economical assessment methodologies have been developed to incorporated bids for individual distributed resources, which include solar cost dispatch and cost model, BESS opportunity cost offer algorithm, and price sensitive demand response model. Detailed methods are proposed to aggregate individual cost offers to a DERA cost curve to bid in SCUC market while three methods are proposed to simulate DER actual dispatch. Based on the DERA models in this document, the SCUC-DER project will be able to assess the impacts of DERA on the distribution system’s operation and reliability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Wholesale Electricity Analysis via Simulation & Learning Experiments (WEASLE): Platform Development and Pilot Competition

This document reports the development of the Wholesale Electricity Analysis via Simulation and Learning Experiments (WEASLE) platform and the pilot competition that was conducted to test the platform. Due to the increasing reliance on variable renewable energy resources for bulk power, the pilot competition, called the Energy Storage Participation Algorithm Competition (ESPA-Comp), was used to test the effect of various market designs on storage utilization and market efficiency. Basic details of the platform are provided, including an overview of the market clearing engine, the battery dispatch and degradation models, electric grid topology and resource mix, and software architecture. Two market designs were tested: a two-settlement market analogous to typical ISO design today, and a multi-settlement market that allows additional forward-trading periods during the real-time market. Results from the pilot competition show that the storage bidding problem is nontrivial and is well suited for future challenges. We find that: 1) all four teams utilized different approaches to the bidding problem, 2) different methodological approaches led to substantially different offer behaviors, 3) resource profits are clustered by team and methodological approach, 4) simulated offers reduced market surplus by about 0.5%, 5) substantially different prices between two-settlement and multi-settlement markets albeit minimal difference in overall market surplus.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Supporting ARPA-E Power Grid Optimization (Final Report)

Pacific Northwest National Laboratory (PNNL), Arizona State University (ASU), Georgia Institute of Technology (Georgia Tech), Los Alamos National Laboratory (LANL), National Renewable Energy Laboratory (NREL), Texas A&M University (TAMU), The University of Texas at Austin (UT), and the University of Wisconsin-Madison (UW-M) supported the ARPA-E Grid Optimization (GO) Competition by providing a common problem formulation, data format, datasets, evaluation mechanism, scoring, rules, and results that resulted in the awarding of $\$9.24$ million dollars to teams from academia, industry, and national labs for solving three sets of increasingly difficult non-linear, security- constrained AC Optimal Powerflow (AC-OPF) optimization problems in order to increase the efficiency of the US Electric Grid. It is estimated that a 1% increase in efficiency can save $\$1$ billion. Current industry practices typically use a linear DC model (DC-OPF) in order solve the OPF problem within the time constraints of the operation schedule. The GO Competition challenges the best power engineers, mathematicians, and computer scientists to make possible operational decisions based on accurate physical models. To accomplish this, the GO Competition created a series of Challenges and funded teams to produce the best solver. Challenge 1 was to solve the security constrained Alternating Current Optimal Power Flow (ACOPF) problem. Challenge 2 extended that to by adding adjustable transformer tap ratios, phase shifting transformers, switchable shunts, price-responsive demand, ramp rate constrained generators and loads, and fast-start unit commitment (UC). Furthermore, Challenge 2 was a maximization problem while Challenge 1 was a minimization problem. While Challenge 3 was being developed, the entrants were invited to find better solutions to the Challenge 2 synthetic datasets with no restrictions on time, hardware, or algorithms. The Challenge 2 solutions turned out to be very good. Challenge 3 expanded the Challenge 2 problem further by using multiperiod dynamic markets, including advisory models for extreme weather events, day-ahead markets, and the real-time markets with an extended look-ahead. These problems included active bid-in demand and topology optimization. Together the Challenges used nearly 30 million CPU hours. Since each team was working on the same problem, using the same data, and running on the same hardware, fair comparisons could be drawn as to the best solver. The datasets were varied enough, however, that the best solver for one dataset was not necessarily the best at another, so cumulative scores were used. The process was managed by the PNNL maintained website https://GOCompetition.energy.gov, where Entrants could find information about the problem, the data, the rules, submit their solver for evaluation, and see the scores of all the competing teams on a Leaderboard. Interest was world-wide but only American teams were eligible for prizes. The Competition has produced 34 journal articles 115 papers and been cited over 500 times in the literature, including 12 dissertations (4 from foreign countries; Columbia (2), Germany, and Italy) and 3 from the DOE ExaScale project. Software developed by Pearl Street Technologies for Challenges 1 and 2 is now deployed by Southwest Power Pool (SPP) and Midcontinent Independent Service Operator (MISO). Other teams have received inquiries from venture capitalists. Google DeepMind has thanked the Competition for making the datasets developed for the Competition public. They are using it to train machine learning models. The larger datasets have billions of unknowns to be solved for, but only a small percent matter in the final solution. Knowing what unknowns are important can dramatically speedup the solution.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Grid Optimization Competition Challenge 3 Problem Formulation

This report contains the problem formulation for the Grid Optimization (GO) Competition Challenge 3. The Grid Optimization Competition is run by a team of researchers from a number of organizations, including the sponsor Advanced Research Projects Agency - Energy (ARPA-E), lead organization Pacific Northwest National Laboratory (PNNL), and technical contributors from Los Alamos National Laboratory (LANL), National Renewable Energy Laboratory (NREL), Texas A&M University (TAMU), Georgia Institute of Technology (GT), University of Wisconsin (UW), and others. The GO Competition poses challenge problems in the field of power grid management, invites entrants to develop solvers for these problems, invokes the solvers on a set of problem instances using common hardware, ranks the solvers according to their performance, and awards prizes according to the rankings. The overall goal of the GO Competition is to spur innovative research on high impact and computationally challenging problems in power grid management from initial development through commercial deployment. Complete information about the GO Competition can be found online at [2]. The webpage covers previous Challenges, rules, timeline, registration information, data formats, scoring methods, computational platform information, information on supported solvers and languages, sponsor information, frequently asked questions, administrator contact information, publicly available problem instances, computer code for reading and evaluating problem and solution data, a sandbox for testing solvers, and a solver submission interface, results, and publications.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrated solution techniques for security constrained unit commitment problem

Apparatus and methods are disclosed for solving Mixed Integer Programming (MIP) problems, such as Security Constrained Unit Commitment (SCUC) problems used by power grid authorities to perform day-ahead market clearing. In certain examples, a plurality of threads of a software tool implementing a concurrent optimizer can be executed concurrently and sequentially to generate new solutions to a SCUC problem for an upcoming planning horizon. Data can be shared among the concurrently executing threads, such as intermediate/incumbent solutions and hints regarding the fixing of variables and constraints to reduce the size of the SCUC problem. In some examples, the threads are seeded with historical solutions from prior planning horizons. The software tool can select a best solution from the solutions generated by the threads, and determine dispatch instructions for a device coupled to the power grid for the upcoming planning horizon based at least in part on the selected solution.

Pan, Feng↗

Energy Storage Participation Algorithm Competition Overview: Market simulation, divisions, stages, storage attributes, and scoring

The Energy Storage Participation Algorithm Competition (ESPA-Comp) aims to assess the performance of participants’ battery storage offer algorithms on their ability to maximize the value of battery storage resources under three different market designs: two-settlement, multi-settlement, and rolling horizon forward markets. This document describes the overall design of the competition at a high level.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Model Formulations: Market clearing models, market design specifications, and dispatch simulation

This document provides various model formulations that will be implemented for the Energy Storage Participation Algorithm pilot competition (ESPA-Comp). This competition will assess the performance of different storage offer algorithms in terms of their ability to maximize the value of storage resources participating under various market designs that vary in the range of complexity of possible storage offers. The model formulations include a general market clearing optimization model and specification to implement it in various market designs. We provide specifications for three market designs to be tested in ESPA-Comp, which we call the two-settlement, multi-settlement, and rolling horizon forward markets. The market designs include different trading frequencies and offer formats. Storage resources participating in the market are provided with primitive values for the resource’s physical capabilities, and they are provided with a storage offer format that their algorithms will be tasked with populating. A detailed physical model is used to assess each storage resource’s ability to maintain its scheduled dispatch according to its state-of-charge, operating temperature, and power conversion efficiency.

25 ENERGY STORAGE↗

SCUC-DER Integration Report: Integrating Distributed Energy Resources (DER) Using Advanced Unit Commitment Models and DER Aggregation Methodologies

Distributed energy resources (DERs) are continuing to grow due to regulatory, policy, and market shifts, and it needs to be ensured that small DERs are given a level playing field with traditional resources. Legacy market processes such as unit-commitment problems were designed for a power grid consisting largely of centralized power plants. In contrast, DERs consist of many small devices with distinct operating characteristics that may or may not be connected at the transmission interconnection points, limiting their visibility to the independent system operators (ISOs) who operate wholesale electricity markets. This report details the development and initial results from a simulation platform that integrates state-of-the-art security-constrained unit commitment software, detailed feeder models, and a DER aggregator model to quantify potential DER integration issues. Quantitative results to date illustrate potential infeasible scheduling solutions from SCUC when the DERA includes aggregations of energy-limited energy storage resources. Likewise, if aggregations are not penalized for dispatch deviations, they may have incentives to deviate from the SCUC-determined resource schedules. Assumptions about the amount of aggregated demand response resources (DRRs) and the ability of DERAs to follow profit incentives have an important impact – DRRs have significant flexibility and can typically feasibly meet their SCUC schedule, but on the other hand, their profit incentives can cause unscheduled increases in load before and after DRR dispatch. Computation time results on the SCUC solver and simulation platform only show a modest increase in SCUC solution time as the number of DERAs is increased, but results to date only reflect the RTS-GMLC test system; results may show more significant solver slowdown in larger transmission systems. The largest contribution to simulation time is attributed to the DERA offer generation method, which is suggested for future improvements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Recent Developments in Security-Constrained AC Optimal Power Flow: Overview of Challenge 1 in the ARPA-E Grid Optimization Competition

In “Recent Developments in Security-Constrained AC Optimal Power Flow: Overview of Challenge 1 in the ARPA-E Grid Optimization Competition,” we review the state of the art in practical algorithms for scheduling power-systems operations in the short term and the results of the recent competition organized by the U.S. Advanced Research Projects Agency–Energy. We explain the mixed-integer nonlinear formulation used in the competition for nonspecialists in electrical engineering, the context and organization of the competition, and the performance of competitors. We find that the collective approaches and results of competitors provide support for efforts to move nonlinear optimization techniques into industrial applications, as they have proven to be a robust and efficient alternative to current linear approximation techniques.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Fast simultaneous feasibility testing and applications for electrical power grids

Fast simultaneous feasibility testing (SFT) for management of an electrical power grid is achieved through various innovations. The computation problem relates to evaluation of candidate solutions for external power flows into a power grid, with respect to predetermined constraints and contingencies. Storage and computations are reduced by formulating the problem in terms of transactional nodes (e.g. third party connections for generators and loads) instead of the larger number of bus nodes. Further advantages are achieved by precomputing matrices that can be reused across multiple SFT invocations, organizing matrices and operations to reduce storage and computation, and eliminating branches that have no contingency violations. The fast SFT further enables new applications for integrating SFT with a Security-Constrained Unit Commitment (SCUC) optimizer for efficient single pass solutions; operating SFT as a service to multiple SCUC solvers; or integration with Security-Constrained Economic Dispatch (SCED) optimization.

97 MATHEMATICS AND COMPUTING↗

Coordinated voltage control and reactive power regulation between transmission and distribution systems

Systems and methods are described for coordinating volt-var control between sub-transmission and distribution systems. Distributed energy resources of a distribution system are aggregated into virtual power plants from which reactive power can optimally be dispatched to the sub-transmission system. A sub-transmission controller executes a volt-var AC optimal power flow optimisation function to minimize voltage fluctuations that might otherwise occur when coordinating with a distribution system having distributed energy resources. The distribution system can use a sensitivity matrix for regulating voltage at distribution feeders while fulfilling a transmission or sub-transmission system's demand requests.

Samaan, Nader A.↗

Transmission-distribution long-term volt-var planning considering reactive power support capability of distributed PV

High penetration of grid-edge, inverter-based photovoltaic (PV) can cause significant voltage fluctuations not only at the distribution but also at the sub-transmission levels due to PV output intermittency. Traditional reactive power planning approaches do not consider intermittency, nor the possibility of coordinating the control of existing and future volt-ampere reactive resources. This paper proposes a reactive power planning tool for sub-transmission systems to mitigate voltage violations and fluctuations caused by high PV penetration and intermittency with a minimum investment cost. The planning tool coordinates with an optimization-based volt-var operational tool for: a) modeling the coordination of all existing var assets in both sub-transmission and distribution systems to reduce the need of new equipment, and b)selecting a set of scenarios with voltage violations, derived from PV intermittency c) testing the final investment decision. The tool obtains an investment need for each intermittency scenario with a proposed optimal power-flow framework with efficient techniques to handle a high number of discrete variables. Two options are provided for final planning decision: i) a conservative direct combination of investment need solutions and ii) a machine learning-based selection of representative investment needs at most time steps. The final investment decision options are verified using a realistic large-scale sub-transmission system and 5-minute PV and load data. The results show a significant voltage performance improvement with a lower investment cost for additional var equipment compared to conventional approaches.

14 SOLAR ENERGY↗

A Statistics-Based Threshold for the RMS-Energy Oscillation Detector

System operators and reliability coordinators currently rely on extensive baselining studies to set thresholds for their oscillation detectors. The resulting thresholds are based largely on engineering judgment and may vary significantly between organizations. In this paper, statistical distribution theory is used to derive a detection threshold for the widely deployed root-mean-square (RMS)-energy detector. This expression provides a theoretical basis for the detector's configuration, simplifies the process of selecting the threshold, and enables improved consistency among organizations that need to coordinate during system-wide events. Three methods for calculating the threshold using synchrophasor measurements are also proposed. These methods ensure that the threshold can be calculated reliably for various applications. Tests with simulated and field-measured data demonstrate that the statistics-based threshold provides consistent detection of grid disturbances while maintaining a low probability of false alarm.

Follum, James D.↗