Abstract
The objective of this work is to utilize on-line gamma monitoring data collected during Tank Closure Cesium Removal (TCCR) Column Batch 3 operations to calibrate the parameters (essentially, the correction/dilution factors (CF or DF)) used in the VERSE-LC models for the prediction of cesium breakthrough while processing Savannah River Site (SRS) Tank 10H dissolved saltcake High-Level Waste through a packed cylindrical bed of Crystalline Silicotitanate (CST). Calibrated VERSE-LC models could be applied to aid in evaluating future TCCR operations.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Hang, Thong. 2021-10-01. VERSE-LC TCCR Model Calibration using Batch 1A, Batch 2, and Batch 3 Column Data. https://doi.org/10.2172/1829806