LandRAY Final Report

The overarching Project objective is to demonstrate the feasibility of using an innovative Power Take-Off (PTO) Module, to be used in the Columbia Power Technologies, Inc. (C·Power) utility-scale wave energy converter (WEC). The PTO Module uniquely combines a large-diameter, direct-drive, rotary permanent magnet generator; a patent-pending rail-bearing system; and a corrosion-resistant fiber-reinforced-plastic structure. The rail bearing system allows for: • A flexible non-rigid and low-cost generator frame as compared to conventional machines. • A reduction of air gap and consequently lower cost electromagnetic design • Ability to reduce costs by increasing diameter to much larger dimensions, while maintaining the small air gap. • A direct drive electro-mechanical solution that is the fastest and most precise approach for responding to the dynamic variability of forces from wave energy. The land-based test of the PTO Module (DDP1) will provide an important risk reduction phase, to demonstrate the reliability and feasibility of a large-diameter, small air-gap generator that is capable of delivering high efficiency, fault-tolerance and relatively simple "at-sea" maintenance capabilities – qualities that are essential for cost-effective wave energy devices. This is the first known test of such a system.

16 TIDAL AND WAVE POWER↗

Direct Drive Wave Energy Buoy

This Project aims to satisfy objectives of the DOE’s Water Power Program by completing a system detailed design (SDD) and other important activities in the first phase of a utility-scale grid-connected ocean wave energy demonstration. In early 2012, Columbia Power (CPwr) had determined that further cost and performance optimization was necessary in order to commercialize its StingRAY wave energy converter (WEC). CPwr’s progress toward commercialization, and the requisite technology development path, were focused on transitioning toward a commercial-scale demonstration. This path required significant investment to be successful, and the justification for this investment required improved annual energy production (AEP) and lower capital costs. Engineering solutions were developed to address these technical and cost challenges, incorporated into a proposal to the US Department of Energy (DOE), and then adapted to form the technical content and statement of project objectives of the resulting Project (DE-EE0005930). Through Project cost-sharing and technical collaboration between DOE and CPwr, and technical collaboration with Oregon State University (OSU), National Renewable Energy Lab (NREL) and other Project partners, we have demonstrated experimentally that these conceptual improvements have merit and made significant progress towards a certified WEC system design at a selected and contracted deployment site at the Wave Energy Test Site (WETS) at the Marine Corps Base in Oahu, HI (MCBH).

16 TIDAL AND WAVE POWER↗