DOE OSTI · 1178507
Reducing EnergyPlus Run Time For Code Compliance Tools
Abstract
Integration of the EnergyPlus ™ simulation engine into performance-based code compliance software raises a concern about simulation run time, which impacts timely feedback of compliance results to the user. EnergyPlus annual simulations for proposed and code baseline building models, and mechanical equipment sizing result in simulation run times beyond acceptable limits. This paper presents a study that compares the results of a shortened simulation time period using 4 weeks of hourly weather data (one per quarter), to an annual simulation using full 52 weeks of hourly weather data. Three representative building types based on DOE Prototype Building Models and three climate zones were used for determining the validity of using a shortened simulation run period. Further sensitivity analysis and run time comparisons were made to evaluate the robustness and run time savings of using this approach. The results of this analysis show that the shortened simulation run period provides compliance index calculations within 1% of those predicted using annual simulation results, and typically saves about 75% of simulation run time.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Athalye, Rahul A., Gowri, Krishnan, Schultz, Robert W., Glazer, Jason. 2014-09-12. Reducing EnergyPlus Run Time For Code Compliance Tools. https://engineeringpapers.com/record/osti%3A1178507/reducing-energyplus-run-time-for-code-compliance-tools
Citations retain the original authors and DOI and include this site’s record URL. If this discovery service contributed to your research, you can also cite Engineering Papers by Indiciae: BibTeX · RIS.