DOE OSTI · 1134470
Engineered Geothermal System Demonstration Project
Abstract
In June 2009, AltaRock Energy began field work on a project supported by the U.S. Department of Energy entitled “Use of Multiple Stimulations to Improve Economics of Engineered Geothermal Systems in Shallow High Temperature Intrusives.” The goal of the project was to develop an Engineered Geothermal System (EGS) in the portion of The Geysers geothermal field operated by the Northern California Power Agency (NCPA). The project encountered several problems while deepening Well E-7 which culminated in the suspension of field activities in September 2009. Some of the problems encountered are particular to The Geysers area, while others might be encountered in any geothermal field, and they might be avoided in future operations.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Petty, Susan. 2014-06-24. Engineered Geothermal System Demonstration Project. https://doi.org/10.2172/1134470
Cite the original work for its findings. Save a collection to share your selection of sources.