CO 2 -Responsive Fracturing Fluids for Enhanced Geothermal Systems (Final Report)

Our group has recently developed StimuFrac, a non-toxic stimuli-responsive fracturing fluid consisting of a CO 2 -reactive polymer which has shown at the lab-scale to consistently fracture rock cores at significantly lower net pressures in a range of representative geothermal pressure/temperature conditions. However, until now the mechanism/s responsible for more effective fracturing, of critical importance to optimize fracturing performance as well as strategize injection methodologies for field deployment, was not understood. In this document, we report (1) on the two main mechanisms responsible for fracturing rock at lower net pressures with StimuFrac; (2) the phase behavior of StimuFrac/CO 2 under geothermal wellbore conditions; and (3) based on high-temperature true triaxial stimulations, detailed evidence that StimuFrac/CO 2 is the best performing stimulation fluid under EGS T/P conditions as compared to water, waterless CO 2 , and CO 2 /water fracturing fluids. This is because i) it requires significantly lower volumes of CO 2 due to its reduced leak off into the formation by the crosslinked polymer solution; ii) large fractures can be generated reproducibly at both low and high CO 2 injection flow rates, and iii) the reversible (previously reported) viscosity increase of StimuFrac could be beneficial to transport proppants when they become available for EGS. These results were particularly evident for hot nearly dry rock as well as partially and nearly fully water-saturated granitic rock. GTO requires StimuFrac to be evaluated in fully water-saturated rock to determine whether the above-described performance applies under these conditions. Since (1) GTO considers there is no enough evidence for Sa different StimuFrac formulation to work below 90C (where full water-saturation in an open system is possible) and (2) no polyaxial loading frame larger than a few centimeters that can do hydraulic fracturing tests while maintaining the rock sample fully saturated with water at 200 C exists; PNNL concludes that the only way to determine if StimuFrac represents an advanced fracturing fluid alternative for EGS, is to perform a stimulation in an actual EGS reservoir.

15 GEOTHERMAL ENERGY↗

Optimizing Rate of Penetration and Tripping Decision-Making using Real-Time Bit Wear Monitoring While Drilling Geothermal Wells

Understanding bit wear while drilling is critical to minimizing non-productive time (NPT) and optimizing rate of penetration (ROP). Lengthening drilling runs with damaged bits does not only lower the ROP, but also elevates the risk of inducing severe bit damage, which could potentially lead to time-consuming fishing operations. When drillers believe the bit has worn off substantially, the bit is tripped out to be replaced. On geothermal wells, tripping can take up to 20% of the overall well construction time, and this is generally acknowledged as an opportunity for improvement. Ideally, a bit run should be terminated before the bit is damaged beyond repair. At the same time, premature bit pulls are to be avoided as well. This study aims to leverage bit and tooth wear metrics that can be obtained in real time to characterize bit condition in order to optimize ROP and determine the optimal time to pull the bit. Two metrics were explored in this study: a bit wear metric that incorporated depth-of-cut, and a tooth wear metric developed by Bourgoyne & Young characterizing the state of bit teeth dull. Both metrics were computed using recorded data from 12¼ inches roller cone insert bit runs in five geothermal wells targeting a granodiorite formation in the western United States. Together with the actual dull grades, determined after the bits were pulled to surface, the metric trends were interpreted to characterize the downhole bit condition and identify the point at which the bit should have optimally been tripped out. The insights from studying the actual dull grades and how they relate to the two metrics were used to establish a reliable bit pull criterion. The bit wear metric trend correctly showed a noticeable departure from baseline for bits experiencing major dulling behavior. Additionally, the tooth wear model predicted the cutter dull within two dull grades for most runs, with better performance in predicting the inner teeth dull. Moreover, the combination of the bit wear and tooth wear metrics was effective in revealing the cause of the bit performance impairment. Proactive tracking of these two metrics in real-time can facilitate geothermal drilling ROP optimization and better-informed tripping decision-making, thereby avoiding wasted time and cost.

Ashari, Rahmat↗

The Newberry Deep Drilling Project (NDDP) workshop

The important scientific questions that will form the basis of a full proposal to drill a deep well to the ductile–brittle transition zone (T>400 °C) at Newberry Volcano, central Oregon state, USA, were discussed during an International Continental Drilling Program (ICDP) sponsored workshop held at the Oregon State University-Cascades campus in Bend, Oregon, from 10 to 13 September 2017. Newberry Volcano is one of the largest geothermal heat reservoirs in the USA and has been extensively studied for the last 40 years. The Newberry Deep Drilling Project (NDDP) will be located at an idle geothermal exploration well, NWG 46-16, drilled in 2008, 3500 m deep and 340–374 °C at bottom, which will be deepened another 1000 to 1300 m to reach 500 °C. The workshop concluded by setting ambitious goals for the NDDP: (1) test the enhanced geothermal system (EGS) above the critical point of water, (2) collect samples of rocks within the brittle–ductile transition, (3) investigate volcanic hazards, (4) study magmatic geomechanics, (5) calibrate geophysical imaging techniques, and (6) test technology for drilling, well completion, and geophysical monitoring in a very high-temperature environment. Based on these recommendations, a full drilling proposal was submitted in January 2018 to the ICDP for deepening an existing well. The next steps will be to continue building a team with project, technology, and investment partners to make the NDDP a reality.

58 GEOSCIENCES↗

Toward Super Hot EGS: The Newberry Deep Drilling Project

Newberry Volcano in Central Oregon is an extensively studied volcano that contains one of the largest geothermal heat reservoirs in the western United States. The detailed characterization of this continental volcanic system reveals it is an excellent choice for drilling a well that will reach temperatures greater than 450°C at relatively shallow depths (< 5000 m). The main purpose of the Newberry Deep Drilling Project (NDDP) is to test the feasibility of super-hot EGS where super critical fluid can be produced with a higher energy compared to conventional EGS. NDDP will be located at an idle geothermal exploration well, NWG 46-16, drilled in 2008 on the western flank of the volcano. The project has several main goals: test EGS above the critical point of water; collect samples of rocks within the brittle-ductile transition zone; investigate volcanic hazards; study geomechanics in plastic rock and test technology for drilling, well completion, and geophysical monitoring. The well NWG 46-16, now 3500 m deep and 340-374°C at bottom, will be deepened another 1000 to 1300 m to reach 500°C into the supercritical region, and potentially approaching the brittle-ductile transition or even zones of partial melt. The original well was drilled with lost circulation zones only at very shallow depth and the temperature profile indicates conductive heat flow. Compared to other super-hot geothermal projects worldwide, this well would return more materials (cuttings, core and fluids) with more predictable drilling conditions, thus providing a suite of data near and across the brittle-ductile transition in silica-rich rocks. The well will be completed with casing and cement designed and tested to withstand the abuses of thermal cycling, hydraulic and thermal stimulation, and flow of supercritical fluids. Geothermal, volcanic, geophysical, and engineering information gained will be widely applicable to other magmatically active areas throughout the Pacific Rim and beyond.

EGS, supercritical, Newberry Volcano, brittle-duct↗

Super Hot EGS and the Newberry Deep Drilling Project

A productive geothermal well drilled into super-hot rock (SHR) with a temperature above 400°C will produce super-critical fluid. At a flow rate of 60 kg/s, a SHR well could produce 50 MWe compared to 5-7 MWe for the same flow at 200°C. Even though these deeper, super-hot wells will cost more, the high energy density means power produced by engineered geothermal systems (EGS) can meet the market ($46 MW-hr) by directly tapping the heat source. We propose a proof of concept where hot rock is close to the surface (~5 km), and the cost of drilling and EGS stimulation will be lowest. A suitable, ready-to-go SHR site is on Newberry Volcano, Oregon, one of the largest geothermal heat reservoirs in the USA, extensively studied for the last 40 years. Millions of dollars have already been invested in the site by private geothermal developers and the US Department of Energy (DOE), resulting in a ready-to-use facility with the necessary infrastructure, environmental permits, land commitments, and monitoring plans. The Newberry Deep Drilling Project (NDDP) will be located at an idle geothermal exploration well, NWG 46-16, drilled in 2008, 3500 m deep and 320°C at bottom, which will be deepened another 1000 to 1300 m to reach 500 °C. The original well was drilled with few lost circulation zones and the temperature profile indicates conductive heat flow. Compared to other SHR projects world-wide, this well would return more materials (cuttings, core and fluids) with more predictable drilling conditions, thus providing a suite of data near and across the brittle-ductile transition in silicarich rocks. After drilling, a hydraulic well stimulation will both change the pore pressure in fractures and cool the fracture walls resulting in permeability enhancement through both thermal fracturing, and hydro-shearing. The first step for the NDDP was an International Continental Drilling Program (ICDP) sponsored workshop held at the OSU-Cascades campus in Bend from Sept. 10-14, 2017. The workshop concluded by setting ambitious goals for NDDP: 1) test EGS above the critical point of water, 2) collect samples of rocks within the brittle-ductile transition, 3) investigate volcanic hazards, 4) study magmatic geomechanics, 5) calibrate geophysical imaging techniques, and 6) test technology for drilling, well completion, and geophysical monitoring in a very high temperature environment. The second step, completed January 15, 2018, was submitting a proposal to ICDP for 46-16 deepening. The next steps will be to continue building a team with project, technology, and investment partners to make NDDP a reality.

EGS, Geothermal, Newberry↗

Newberry Well 55-29 Stimulation Data 2014

The Newberry Volcano EGS Demonstration in central Oregon, a 5 year project begun in 2010, tests recent technological advances designed to reduce the cost of power generated by EGS in a hot, dry well (NWG 55-29) drilled in 2008. First, the stimulation pumps used were designed to run for weeks and deliver large volumes of water at moderate well-head pressure. Second, to stimulate multiple zones, AltaRock developed thermo-degradable zonal isolation materials (TZIMs) to seal off fractures in a geothermal well to stimulate secondary and tertiary fracture zones. The TZIMs degrade within weeks, resulting in an optimized injection/ production profile of the entire well. Third, the project followed a project-specific Induced Seismicity Mitigation Plan (ISMP) to evaluate, monitor for, and mitigate felt induced seismicity. An initial stimulation was conducted in 2012 and continued for 7 weeks, with over 41,000 m3 of water injected. Further analysis indicated a shallow casing leak and an unstable formation in the open hole. The well was repaired with a shallow casing tieback and perforated liner in the open hole and re-stimulated in 2014. The second stimulation started September 23rd, 2014 and continued for 3 weeks with over 9,500 m3 of water injected. The well was treated with several batches of newly tested TZIM diverter materials and a newly designed Diverter Injection Vessel Assembly (DIVA), which was the main modification to the original injection system design used in 2012. A second round of stimulation that included two perforation shots and additional batches of TZIM was conducted on November 11th, 2014 for 9 days with an additional 4,000 m3 of water injected. The stimulations resulted in a 3-4 fold increase in injectivity, and PTS data indicates partial blocking and creation of flow zones near the bottom of the well. This submission includes all of the files and reports associated with the stimulation, pressure testing, and monitoring included in the scope of the project.

15 GEOTHERMAL ENERGY↗

Newberry EGS Demonstration: Phase 2.2 Report

The Newberry Volcano EGS Demonstration is a five year field project designed to demonstrate recent technological advances for engineered geothermal systems (EGS) development. Advances in reservoir stimulation, diverter, and monitoring are being tested in a hot (>300 ºC), dry well (NWG 55-29) drilled in 2008. In the fall of 2014, 9,500m3 (2.5 million gallons) of groundwater were injected at a maximum wellhead pressure of 195 bar (2850 psi) over 4 weeks of hydraulic stimulation. Injectivity changes, thermal profiles and seismicity indicate that fracture permeability in well NWG 55-29 was enhanced. The fifteen-station microseismic array (MSA) located 398 seismic events, ranging in magnitude from M 0 to M 2.26. The next step is to drill a production well into the EGS reservoir. Advanced analysis of the microseismic data including hand picking of first arrivals, moment tensors, relative relocations, and velocity model improvements have resulted new higher-quality microseismic catalogs. These catalogs have been combined by relative weighting and gridding of seismic densities, resulting in probability-based maps and cross-sections, which have been used to plan a production well trajectory. The microseismic locations and times were also used to develop a reservoir diffusivity model, which can be used to evaluate stimulation plans such as dual-well stimulation.

15 GEOTHERMAL ENERGY↗

Engineered Geothermal System Demonstration Project

In June 2009, AltaRock Energy began field work on a project supported by the U.S. Department of Energy entitled “Use of Multiple Stimulations to Improve Economics of Engineered Geothermal Systems in Shallow High Temperature Intrusives.” The goal of the project was to develop an Engineered Geothermal System (EGS) in the portion of The Geysers geothermal field operated by the Northern California Power Agency (NCPA). The project encountered several problems while deepening Well E-7 which culminated in the suspension of field activities in September 2009. Some of the problems encountered are particular to The Geysers area, while others might be encountered in any geothermal field, and they might be avoided in future operations.

15 GEOTHERMAL ENERGY↗