Abstract

The state-of-the-art Oxygen Generation Assembly (OGA) has been reliably producing breathing oxygen for the crew aboard the International Space Station (ISS) for over eight years. Lessons learned from operating the ISS OGA have led to proposing incremental improvements to advance the baseline design for use in a future long duration mission. These improvements are intended to reduce system weight, crew maintenance time and resupply mass from Earth while increasing reliability. The proposed improvements include replacing the cell stack membrane material, deleting the nitrogen purge equipment, replacing the hydrogen sensors, deleting the wastewater interface, replacing the hydrogen dome and redesigning the cell stack power supply. The development work to date will be discussed and forward work will be outlined. Additionally, a redesigned system architecture will be proposed.

Keep this discovery

BibTeXRIS

Kevin C Takada, Ahmed E Ghariani, Steven Van Keuren. Advancing the Oxygen Generation Assembly Design to Increase Reliability and Reduce Costs for a Future Long Duration Mission. https://ntrs.nasa.gov/citations/20150016494

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Assembly and Integration Status of a High Fidelity Ground Test Bed for the Water Processor Assembly

The Water Recovery System (WRS) is a critical component of life support aboard the International Space Station (ISS) and will play an essential role in future missions beyond Low Earth Orbit (LEO). Its primary functional units – the Urine Processor Assembly (UPA), Brine Processor Assembly (BPA), and Water Processor Assembly (WPA) – must be evaluated for extended operation, dormancy resilience, material obsolescence, and reliability under exploration-driven constraints. Ground testing is vital for developing these technologies and generating statistically relevant reliability assessments, which requires extended runtime under integrated, Flight-like conditions. Currently, no high-fidelity, fully integrated WPA ground test bed exists to support these objectives. To address this gap, NASA is developing a WPA test bed at Marshall Space Flight Center (MSFC) that combines downgraded ISS flight hardware with functionally flight-like components in a cost-effective configuration while maintaining priority hardware investigations. This paper describes the current status of hardware assembly and integration, outlines key challenges such as simulating microgravity effects and mitigating obsolescence, and presents future test objectives including software development, reliability assessments, dormancy studies, and exploration-oriented upgrades.

Water Processor Assembly

NIAC Phase I Final Report Lunar South Pole Oxygen Pipeline (LSPOP)

The Lunar South Pole Oxygen Pipeline (LSPOP) Phase I NIAC, is to analyze the feasibility of constructing a pipeline at the Moon’s South Pole for transporting gaseous oxygen from point of generation to point of use. A lunar pipeline has never been pursued and will revolutionize lunar surface operations for the Artemis program and reduce cost and risk. Our starting concept is for a 5 km pipeline to transport oxygen gas from an oxygen production source, for example from our molten regolith electrolysis (MRE, currently at TRL 5, see references[1],[2],[3],[4],[5],[6] for technical discussions of the MRE process) extraction site, or any other source, to an oxygen storage/liquification plant near a lunar base. The pipeline is designed to: 1) be constructed robotically from regolith-derived metals with minimal material transferred from Earth, 2) be repairable robotically, 3) have an oxygen flow rate of ~2 kg/hour, which is commensurate with the NASA initial projected need of 10,000 kg/year, 4) operate with minimal power over the lifetime of the pipeline, with a goal of high operational reliability and the ability to survive in the lunar environment for > 10 years. We compare this concept to a pipeline concept with pipe produced on Earth and then transported to and assembled on the Moon. Both approaches will use earth-based compressors, valves, and fittings which are integrated into the pipeline on the Moon.

NIAC Phase I

Assembly and Integration Status of a High Fidelity Ground Test Bed for the Water Processor Assembly

The Water Recovery System (WRS) is a critical component of life support aboard the International Space Station (ISS) and will play an essential role in future missions beyond Low Earth Orbit (LEO). Its primary functional units – the Urine Processor Assembly (UPA), Brine Processor Assembly (BPA), and Water Processor Assembly (WPA) – must be evaluated for extended operation, dormancy resilience, material obsolescence, and reliability under exploration-driven constraints. Ground testing is vital for developing these technologies and generating statistically relevant reliability assessments, which requires extended runtime under integrated, Flight-like conditions. Currently, no high-fidelity, fully integrated WPA ground test bed exists to support these objectives. To address this gap, NASA is developing a WPA test bed at Marshall Space Flight Center (MSFC) that combines downgraded ISS flight hardware with functionally flight-like components in a cost-effective configuration while maintaining priority hardware investigations. This paper describes the current status of hardware assembly and integration, outlines key challenges such as simulating microgravity effects and mitigating obsolescence, and presents future test objectives including software development, reliability assessments, dormancy studies, and exploration-oriented upgrades.