NASA NTRS · 20100033125
Preliminary Multi-Variable Parametric Cost Model for Space Telescopes
Abstract
This slide presentation reviews creating a preliminary multi-variable cost model for the contract costs of making a space telescope. There is discussion of the methodology for collecting the data, definition of the statistical analysis methodology, single variable model results, testing of historical models and an introduction of the multi variable models.
Keep this discovery
Explore connections, maps & timelines
Stahl, H. Philip, Hendrichs, Todd. 2010-07-31. Preliminary Multi-Variable Parametric Cost Model for Space Telescopes. https://ntrs.nasa.gov/citations/20100033125
Cite the original work for its findings. Save a collection to share your selection of sources.