Engineering PapersSearch

Engineering topics

Hendrichs, Todd

Publications and source records attributed to Hendrichs, Todd.

Preliminary Multi-Variable Parametric Cost Model for Space Telescopes

This slide presentation reviews creating a preliminary multi-variable cost model for the contract costs of making a space telescope. There is discussion of the methodology for collecting the data, definition of the statistical analysis methodology, single variable model results, testing of historical models and an introduction of the multi variable models.

Stahl, H. Philip

Preliminary Multi-Variable Cost Model for Space Telescopes

Parametric cost models are routinely used to plan missions, compare concepts and justify technology investments. This paper reviews the methodology used to develop space telescope cost models; summarizes recently published single variable models; and presents preliminary results for two and three variable cost models. Some of the findings are that increasing mass reduces cost; it costs less per square meter of collecting aperture to build a large telescope than a small telescope; and technology development as a function of time reduces cost at the rate of 50% per 17 years.

Stahl, H. Philip