Engineering Papers⌕ Search

Engineering topics

Zimmerman, Wayne F.

Publications and source records attributed to Zimmerman, Wayne F..

In Situ Potassium-Argon Geochronology Using Fluxed Fusion and a Double Spike

A document highlights an Li-based fluxing agent that enables sample fusion and quantitative Ar-release at relatively low temperatures (900-1,000 C), readily achievable with current flight resistance furnace designs. A solid, double spike containing known quantities of Ar-39 and K-41 was developed that, when added in known amounts to a sample, enables the extraction of a Ar-40/K-40 ratio for age estimation without a sample mass measurement. The use of a combination of a flux and a double spike as a means of solving the mechanical hurdles to an in situ K-Ar geochronology measurement has never been proposed before. This methodology and instrument design would provide a capability for assessing the ages of rocks and minerals on the surfaces of planets and other rocky terrestrial bodies in the solar system.

Hurowitz, Joel A.↗

A Surface Science Paradigm for a Post-Huygens Titan Mission

With the Cassini-Huygens atmospheric probe drop-off mission fast approaching, it is essential that scientists and engineers start scoping potential follow-on surface science missions. This paper provides a summary of the first year of a two year design study which examines in detail the desired surface science measurements and resolution, potential instrument suite, and complete payload delivery system. Also provided are design concepts for both an aerial inflatable mobility platform and deployable instrument sonde. The tethered deployable sonde provides the capability to sample near surface atmosphere, sub-surface liquid (if it exists), and surface solid material. Actual laboratory tests of the amphibious sonde prototype are also presented.

Zimmerman, Wayne F.↗

To Land on Europa

The Science Definition Team (SDT) for NASA's Jupiter Icy Moons Orbiter (JIMO) Mission recommends including a lander as an integral part of the science payload of the JIMO Mission. The Europa Surface Science Package (ESSP) could comprise up to 25% of science payload resources. We have identified several key scientific and technical issues for such a lander, including 1) the potential effects of propellant contamination of the landng site, 2) the likely macroscopic surface roughness of potential landing sites, and 3) the desire to sample materials from depths of approximately 1 m beneath the surface. Discussion and consensus building on these issues within the science community is a prerequisite for establishing design requirements.

Shirley, James H.↗

Comparison Of Telerobot Control Modes

Report presents evaluation of three different modes of telerobot control: teleoperation with position control only; teleoperation with force reflection; and teleoperation with shared control, in which operator controls some elements of task while autonomous system controls other elements of task. Evaluation involved experiments in which nine trained operators used telerobot system to perform tasks of increasing difficulty - removal and insertion of electrical connector, removal and insertion of orbital replacement unit, and removal and insertion of electronic-circuit board in electronic chassis.

Zimmerman, Wayne F.↗

Test Bed For Telerobots

Assembly of electromechanical and electronic equipment (including computers) constitutes test bed for development of advanced robotic systems for remote manipulation. Combines features not found in commercial systems. Its architecture allows easy growth in complexity and level of automation. System national resource for validation of new telerobotic technology. Intended primarily for robots used in outer space, test bed adapted to development of advanced terrestrial telerobotic systems for handling radioactive materials, dangerous chemicals, and explosives.

Matijevic, Jacob R.↗

Space Station Freedom automation and robotics: An assessment of the potential for increased productivity

This report presents the results of a study performed in support of the Space Station Freedom Advanced Development Program, under the sponsorship of the Space Station Engineering (Code MT), Office of Space Flight. The study consisted of the collection, compilation, and analysis of lessons learned, crew time requirements, and other factors influencing the application of advanced automation and robotics, with emphasis on potential improvements in productivity. The lessons learned data collected were based primarily on Skylab, Spacelab, and other Space Shuttle experiences, consisting principally of interviews with current and former crew members and other NASA personnel with relevant experience. The objectives of this report are to present a summary of this data and its analysis, and to present conclusions regarding promising areas for the application of advanced automation and robotics technology to the Space Station Freedom and the potential benefits in terms of increased productivity. In this study, primary emphasis was placed on advanced automation technology because of its fairly extensive utilization within private industry including the aerospace sector. In contrast, other than the Remote Manipulator System (RMS), there has been relatively limited experience with advanced robotics technology applicable to the Space Station. This report should be used as a guide and is not intended to be used as a substitute for official Astronaut Office crew positions on specific issues.

Weeks, David J.↗

The space station assembly phase: Flight telerobotic servicer feasibility, volume 1

The question is addressed which was raised by the Critical Evaluation Task Force (CETF) analysis of the space station: if a Flight Telerobotic Servicer (FTS) of a given technical risk could be built for use during space station assembly, could it save significant extravehicular (EVA) resources. Key issues and trade-offs associated with using an FTS to aid in space station assembly phase tasks such as construction and servicing are identified. A methodology is presented that incorporates assessment of candidate assembly phase tasks, telerobotics performance capabilities, development costs, operational constraints (STS and proximity operations), maintenance, attached payloads, and polar platforms. A discussion of the issues is presented with focus on potential FTS roles: (1) as a research-oriented test bed to learn more about space usage of telerobotics; (2) as a research-based test bed with an experimental demonstration orientation and limited assembly and servicing applications; or (3) as an operational system to augment EVA, to aid the construction of the space station, and to reduce the programmatic (schedule) risk by increasing the flexibility of mission operations. During the course of the study, the baseline configuration was modified into Phase 1 (a station assembled in 12 flights), and Phase 2 (a station assembled over a 30 flight period) configuration.

Smith, Jeffrey H.↗

The space station assembly phase: Flight telerobotic servicer feasibility. Volume 2: Methodology and case study

A methodology is described for examining the feasibility of a Flight Telerobotic Servicer (FTS) using two assembly scenarios, defined at the EVA task level, for the 30 shuttle flights (beginning with MB-1) over a four-year period. Performing all EVA tasks by crew only is compared to a scenario in which crew EVA is augmented by FTS. A reference FTS concept is used as a technology baseline and life-cycle cost analysis is performed to highlight cost tradeoffs. The methodology, procedure, and data used to complete the analysis are documented in detail.

Smith, Jeffrey H.↗