Engineering Papers⌕ Search

Engineering topics

Rand, Joseph

Publications and source records attributed to Rand, Joseph.

20 records · Page 2

Effects of land-based wind turbine upsizing on community sound levels and power and energy density

Multiple technological, social, and market factors of wind power are evolving rapidly. Most notably, significant wind turbine scaling is occurring and is forecasted to continue. While the larger turbines expected to be deployed in the future are more powerful and efficient, they are also expected to operate at higher sound levels and require larger setbacks than those installed in the last decade. These sometimes-competing deployment trends and impacts cannot be understood via simple extrapolations of past trends. This study analyzes the effect of these future larger turbines on wind turbine micro-siting, project-level power and energy density, and community noise impacts. Due to their taller heights, larger rotors, and higher sound power levels, future wind turbines will require larger setbacks from homes and greater inter-turbine spacing, resulting in fewer turbines deployed for a given land area. This research finds these changes more than offset the effect of the higher turbine sound emissions, significantly decreasing the average sound levels that wind plant hosting communities experience. Yet, simultaneously, plant layouts using future turbine designs also result in projects with higher installed capacities and annual energy output for a given land area. These increases will likely lead to increased tax benefits and local income in the community. The deployment of fewer turbines on a smaller number of parcels could have implications on siting flexibility and landowner payments.

17 WIND ENERGY↗

Interconnection Cost Analysis in the PJM Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the PJM Territory, representing nearly 86% of all new unique generators requesting interconnection from 2000 to 2022. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗