Rand, Joseph

Publications and source records attributed to Rand, Joseph.

At least 19 records

Corrigendum to ‘Under-capacitated and over-powered? Rural austerity and asymmetrical negotiating relationships in US wind energy development’ [J. Rural Stud., 119 (2025) 1–14]

The authors regret that there is an incomplete sentence in the abstract of the article, and request that the portion “, and counties incre” be deleted from the abstract (found at the end of the sentence beginning with “However …”). The portion to be deleted is underlined and bolded below. The authors would like to apologise for any inconvenience caused. Current abstract: Though rural local governments are central actors in renewable energy development, local governments in the United States (US) remain systematically under-funded. This paper considers what the manifestations of austerity in local governments broadly and rural localities specifically mean for renewable energy development and for energy transitions. Drawing on a survey of 262 elected county officials with experience with wind energy in eight US states, this paper asks how local officials understand the impacts of wind development, how local governments are involved in wind energy negotiations, how the resources and expertise needed to navigate negotiations are distributed among counties, and analyze the relationship between local capacity, access to resources, and involvement in negotiations. We find that local officials express simultaneously affective and material concerns with the impacts of wind development and see negotiations with the developer as central to realizing local benefits. However, the expertise and staffing needed to negotiate with developers is less accessible to poorer or sparsely populated counties, and counties with lower overall revenues have narrower scopes of negotiation, and counties incre. Our results suggest that uneven rural capacity heightens an already asymmetrical relationship between localities and developers. In analyzing how infrastructure developments are shaped by relationships between localities and developers that are conditioned by austerity and (under)capacity, this paper contributes to and bridges scholarly discussions on rural austerity, rescaling, and renewable energy transitions. These results challenge conventional wisdoms around centralizing energy siting processes, contextualize popular and academic debates about opposition to renewable energy development, and highlight the need for rural reinvestment to realize meaningfully participatory energy developments.

Elmallah, Salma↗

Under-capacitated and over-powered? Rural austerity and asymmetrical negotiating relationships in US wind energy development

Though rural local governments are central actors in renewable energy development, local governments in the United States (US) remain systematically under-funded. This paper considers what the manifestations of austerity in local governments broadly and rural localities specifically mean for renewable energy development and for energy transitions. Drawing on a survey of 262 elected county officials with experience with wind energy in eight US states, this paper asks how local officials understand the impacts of wind development, how local governments are involved in wind energy negotiations, how the resources and expertise needed to navigate negotiations are distributed among counties, and analyze the relationship between local capacity, access to resources, and involvement in negotiations. We find that local officials express simultaneously affective and material concerns with the impacts of wind development and see negotiations with the developer as central to realizing local benefits. However, the expertise and staffing needed to negotiate with developers is less accessible to poorer or sparsely populated counties, and counties with lower overall revenues have narrower scopes of negotiation, and counties incre. Our results suggest that uneven rural capacity heightens an already asymmetrical relationship between localities and developers. In analyzing how infrastructure developments are shaped by relationships between localities and developers that are conditioned by austerity and (under)capacity, this paper contributes to and bridges scholarly discussions on rural austerity, rescaling, and renewable energy transitions. These results challenge conventional wisdoms around centralizing energy siting processes, contextualize popular and academic debates about opposition to renewable energy development, and highlight the need for rural reinvestment to realize meaningfully participatory energy developments.

Elmallah, Salma↗

Go slow to go fast? A review of the impacts of permitting on large-scale solar project development

State and local permitting challenges could impede the ability of large-scale solar (LSS) to meet growing electricity demand in the United States. Here, we review research that explores LSS permitting and its impacts on the pace and scale of LSS project development. Research on LSS permitting is relatively scarce, such that we support our review with research in the context of wind permitting, where appropriate. Further, few studies attempt to rigorously quantify the effects of permitting on the pace and scale of LSS project development. The available evidence allows us to identify various hypotheses and identify gaps for further research. Our review suggests that differences in permitting policies, regulations, and ordinances explain relatively little variation in LSS permitting and development outcomes across jurisdictions, except where jurisdictions implement rules designed to impede LSS. The evidence suggests LSS permitting challenges largely accrue during the implementation of permitting processes. Recent research suggests that community opposition to project development is a key driver of LSS permitting challenges, given that project opponents often use permitting processes to translate opposition into legal action. We call on future researchers to more concretely describe the LSS permitting challenge and to identify the specific actors responsible for implementing solutions.

Community opposition↗

Hybrid Power Plants: Status of Operating and Proposed Plants, 2024 Edition [Slides]

Improving battery technology and the growth of variable renewable generation are driving a surge of interest in “hybrid” power plants that combine, for example, wind or solar generating capacity with co-located batteries. While most of the current interest involves pairing photovoltaic (PV) plants with batteries, other types of hybrid or co-located plants with wide-ranging configurations have been part of the U.S. electricity mix for decades. This annually updated briefing tracks and maps existing hybrid or co-located plants across the United States while also synthesizing data from power purchase agreements (PPAs) and generation interconnection queues to shed light on near- and long-term development pipelines. The scope includes “co-located hybrids” that pair two or more resources (e.g., multiple types of generation and/or generation with storage) that are operated largely independently behind a single point of interconnection, and “full hybrids” that also feature coordinated operations of the co-located resources. The focus is on plants with one megawatt (MW) or more of capacity; smaller (often behind-the-meter) projects are also increasingly common, but are not included in this data synthesis.

14 SOLAR ENERGY↗

Land-Based Wind Market Report: 2024 Edition

Wind power additions in the United States totaled 6.5 gigawatts (GW) of capacity in 2023. 1 Wind power growth has historically been supported by the industry’s primary federal incentive—the production tax credit (PTC)—as well as numerous state-level policies. Long-term improvements in the cost and performance of wind power technologies have also been key drivers for wind additions, yielding low-priced wind energy for utility, corporate, and other power purchasers. Nonetheless, 2023 was a slow year in terms of new wind deployment, the lowest since 2014. Elevated interest rates played a role in slowing deployment, as did interconnection and siting challenges.

17 WIND ENERGY↗

Perceptions of Large-Scale Solar Project Neighbors: Results From a National Survey [Slides]

Driven by favorable economics, policy factors, and decarbonization goals, large-scale solar (LSS, defined here as ground-mounted photovoltaic projects ≥1 MWDC) has expanded rapidly in recent years, with more than 90 gigawatts (GW) now installed across the United States. Growth in LSS deployment is anticipated to accelerate in response to growing electricity demand and utility, state, and federal decarbonization goals. This continued expansion hinges, in part, on the continued support of local residents and decision-makers in communities hosting LSS projects. Understanding the perceptions and attitudes of existing LSS neighbors is critical to inform and enable future LSS deployment, and to improve outcomes for those host communities. As of 2022, there were more than 10 million U.S. homes within 3 miles of LSS plants. Yet, until recently, no comprehensive study had examined the experiences and perceptions of these LSS neighbors. In 2023, a Berkeley Lab team worked with the University of Michigan and Michigan State University to conduct the first-of-its-kind nationally representative survey of LSS neighbors as part of the Community-Centered Solar Development research project. The survey effort ultimately collected 984 responses from residents within 3 miles of existing LSS projects. The survey results are available for download via the full summary analysis slide deck report, as well as a shorter (~4 page) summary brief. The survey instrument (questionnaire) is also available for download for those interested in understanding the survey design or replicating questions in future research.

14 SOLAR ENERGY↗

Queued Up: 2024 Edition, Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2023 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require projects seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. The amount of new electric capacity in these queues is growing dramatically, with nearly 2,600 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 95% of which is for zero-carbon resources like solar, wind, and battery storage). However, most projects that apply for interconnection are ultimately withdrawn, and those that are built are taking longer on average to complete the required studies and become operational. Data from these queues nonetheless provide a general indicator for mid-term trends in developer interest.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Transmission Interconnection Roadmap: Transforming Bulk Transmission Interconnection by 2035

The U.S. electricity system is amid a rapidly occurring and widespread energy transition. Regional, Tribal, state, and customer demand for new energy resources, combined with favorable policies, is driving a rapid rise of interconnection requests. Interconnection processes will need to evolve to handle this larger number of requests today and into the future, as policy and economic drivers continue to motivate significant resource development. This roadmap identifies and organizes nearer- and longer-term solutions to enable transmission interconnection processes to meet this expected demand, and it is intended for a diverse audience of stakeholders participating within transmission interconnection processes. The roadmap is a result of the Interconnection Innovation e-Xchange (i2X) program launched by the U.S. Department of Energy (DOE) in June 2022 to convene stakeholders and address interconnection challenges. The roadmap is organized into four primary goal areas, each important to the overall i2X mission to enable a simpler, faster, and fairer interconnection of clean energy resources while enhancing the reliability, resiliency, and security of our electric grid. The first goal aims to improve interconnection data transparency, to aid interconnection customers’ ability to screen and site potential projects, better enable third-party modeling, facilitate more process automation, enhance competition while ensuring equitable outcomes, and enable benchmarking, tracking, and auditing of interconnection processes and reforms. The second goal covers solutions to improve queue management practices, affected system studies, fair processes, and workforce development. The third goal incorporates solutions that aim to improve cost allocation, reduce costs to electricity consumers, enhance the coordination between transmission planning and the interconnection process, and optimize the rightsizing of transmission investment through improvements in interconnection studies. The fourth and final goal aims to reduce the performance issues not identified during interconnection studies by updating technical requirements within interconnection studies, models, and tools while also improving industry interconnection standards.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Survey of Utility-Scale Wind and Solar Developers Report [Slides]

In 2023, Berkeley Lab conducted the first of its kind survey of industry professionals with direct experience working in community engagement and permitting of land-based, utility-scale wind and solar energy facilities in the U.S. The survey solicited information about project timelines over the last five years, leading causes of project delays and cancelations, community opposition, experience with permitting authorities, community engagement, comparisons between wind and solar, and other related topics. A total of 123 individuals responded to the survey for a response rate of 19.2%. Respondents were employed at 62 unique companies, which together are responsible for approximately half of the wind and solar developed from 2016 to 2023.

14 SOLAR ENERGY↗

Land-Based Wind Market Report: 2023 Edition

Wind power additions in the United States totaled 8.5 gigawatts (GW) in 2022. Wind power growth has historically been supported by the industry’s primary federal incentive—the production tax credit (PTC)—as well as myriad state-level policies. Long-term improvements in the cost and performance of wind power technologies have also been key drivers for wind additions. Nonetheless, 2022 was a relatively slow year in terms of new wind power deployment—the lowest since 2018—due in part to ongoing supply chain pressures, higher interest rates, and interconnection and siting challenges, but also the reduction in the value of the PTC that was in place up until the passage of the Inflation Reduction Act (IRA) in August 2022.

17 WIND ENERGY↗

Hybrid Power Plants: Status of Operating and Proposed Plants, 2023 Edition [Slides]

Improving battery technology and the growth of variable renewable generation are driving a surge of interest in “hybrid” power plants that combine, for example, wind or solar generating capacity with co-located batteries. While most of the current interest involves pairing photovoltaic (PV) plants with batteries, other types of hybrid or co-located plants with wide-ranging configurations have been part of the U.S. electricity mix for decades. This annually updated briefing tracks and maps existing hybrid or co-located plants across the United States while also synthesizing data from power purchase agreements (PPAs) and generation interconnection queues to shed light on near- and long-term development pipelines. The scope includes “co-located hybrids” that pair two or more resources (e.g., multiple types of generation and/or generation with storage) that are operated largely independently behind a single point of interconnection, and “full hybrids” that also feature coordinated operations of the co-located resources. The focus is on plants with one megawatt (MW) or more of capacity; smaller (often behind-the-meter) projects are also increasingly common, but are not included in this data synthesis. Key findings from the latest briefing include: -At the end of 2022, there were 374 hybrid plants (>1 MW) operating across the United States (+25% compared to the end of 2021), totaling nearly 41 GW of generating capacity (+15%) and 5.4 GW/15.2 GWh of energy storage (+69%/+88%). PV+storage plants are by far the most common, dominating in terms of plant number (213), storage capacity (4.0 GW/12.5 GWh), storage:generator capacity ratio (49%), and storage duration (3.1 hours). But there are nearly twenty other hybrid plant configurations as well, including several different fossil hybrid categories (each dominated by the fossil component) as well as wind+storage, wind+PV, wind+PV+storage, geothermal+PV, and others. -Last year was another strong year for PV+storage hybrids in particular: 59 of the 62 hybrids added in 2022 were PV+storage. As of the end of 2022, there was roughly as much storage capacity operating within PV+storage hybrid plants as in standalone storage plants (~4 GW each). In storage energy terms, however, PV+storage edged out standalone storage by ~2 GWh (12.5 GWh vs. 10.4 GWh, respectively). -Interconnection queue data show continued strong developer interest in hybridization. At the close of 2022, there were 51% more hybrid plants—representing 59% more generating capacity—in interconnection queues across the United States than there were at the end of 2021. Solar dominates these proposed plants as well: at the close of 2022, there were 457 GW of solar capacity proposed as a hybrid (representing ~48% of all solar capacity in the queues), most typically pairing PV with battery storage. At the same time, there were 24 GW of wind capacity proposed as a hybrid (representing ~8% of all wind capacity in the queues), again most-often pairing wind with storage. Meanwhile, more than half of all storage in the queues is estimated to be part of a hybrid plant. While many of the plants proposed in the queues will not ultimately reach commercial operations, the depth of interest in hybrid plants—especially PV+storage—is notable, particularly in certain regions. For example, in CAISO, 97% of all solar capacity and 45% of all wind capacity in the queues is proposed as a hybrid. -The report also surveys power purchase agreement (PPA) price data from a sample of operating and proposed PV+storage plants. Though PV+storage PPA prices have fallen over time, “levelized storage adders” have recently increased somewhat to ~$\$ $7000/MW-month, ~$\$ $60/MWh-stored (assuming one full cycle per day), or ~$\$ $15/MWh-PV. Some of the recent price increase could simply reflect a trend towards higher battery:PV capacity ratios over time, which increases costs, all else being equal. The well-publicized impact of inflationary and supply chain pressures on battery prices is no doubt a contributor as well.

25 ENERGY STORAGE↗

Interconnection Cost Analysis in ISO-New England

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 194 projects in New England from interconnection studies performed between 2010 and 2021. Project-level cost summary data are available for download on this page. We find: -Interconnection costs have grown over time, especially for projects that withdraw. -Interconnection costs are highest for onshore wind, followed by solar and storage. Natural gas and offshore wind projects tend to cost less to interconnect, in comparison. -Economies of scale exist for solar and possibly storage projects, but not for other resource types. -Wind and solar projects requesting capacity network resource interconnection service have higher interconnection costs, despite being evaluated using the same interconnection standard in the analyzed studies. -Low and high interconnection costs can be found throughout the ISO-NE footprint. -Costs are split fairly evenly between investments at the point of interconnection and within the broader network for active and withdrawn projects, while complete projects incur most costs at the point of interconnection.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Community Centered Solar Development (CCSD) Case Study Interviews [Slides]

Large-scale solar (LSS, defined here as ground-mounted photovoltaic projects ≥1 MWDC) has grown rapidly in the U.S., accounting for nearly half of new electric generating capacity added to the U.S. grid in 2022. All sources of electricity bring positive and negative impacts to hosting communities and the rapid growth of LSS has increased the urgency to understand those impacts. Yet, information about the potential positive and negative impacts of LSS on host communities, and the factors or drivers leading to support or opposition to a project, is lacking. This information gap limits how project developers, municipalities, and local siting authorities can address community concerns and appropriately align proposed projects to best suit and benefit local communities. As part of Berkeley Lab’s Community-Centered Solar Development (CCSD) project, this research set out to explore deep insights and perceptions from LSS stakeholders that only qualitative data can provide to identify key factors driving project success or threatened failure. Case studies, such as those utilized in this research, are uniquely adept at capturing the subjective experience of individuals and at identifying variables, structures, and interactions between stakeholders. Our case studies included 54 semi-structured interviews across 7 different LSS sites, representing a diversity of geographies, project sizes (MW), site types (i.e., greenfield, agrivoltaic, and brownfield / contaminated sites), zoning jurisdiction types, and more (Table 1). In addition to local residents living in close proximity to these LSS sites, we interviewed other key stakeholders involved in the projects such as developers, decision-makers, utility representatives, landowners, and individuals from community-based organizations. The overarching aim of this case study research was two-fold: (1) to inform subsequent tasks in the CCSD research project (including an upcoming national survey of LSS neighbors), and (2) to provide insights into the following set of research questions: -What are the key positive and negative drivers leading to support and opposition to LSS projects? -To what extent do LSS projects exacerbate or mitigate perceived inequities and marginalization within hosting communities and how can those inequities be mitigated going forward? -What strategies can communities employ to align LSS development with local land-use plans and community needs and values? The research findings and next steps are described in this slide deck report.

14 SOLAR ENERGY↗

Generator Interconnection Cost Analysis in the Southwest Power Pool (SPP) Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 845 projects from interconnection studies for the Southwest Power Pool (SPP) Territory. The studies were performed between 2002 and 2023 and include all of the most refined cost estimates available. Project-level cost summary data are available for download on this page. We find: -Project-specific interconnection costs can differ widely. -Average interconnection costs are stable for projects that complete all interconnection studies but have escalated for those that withdraw. -Broader network upgrade costs are the primary driver of recent cost increases, especially for withdrawn projects. -Potential interconnection costs of all solar and wind requests have been greater than those of storage and natural gas projects. -Economies of scale exist for completed wind and solar projects but not for other fuel types or withdrawn projects. -Interconnection costs vary by location. Berkeley Lab publishes a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2022 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2022, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 2,000 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 95% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (947 GW) and battery storage (~680 GW) are – by far – the fastest growing resources in the queues; combined they accounted for over 80% of new capacity entering the queues in 2022. Substantial wind (300 GW) capacity is also seeking interconnection, 38% of which is for offshore projects (113 GW). In total, about 1,250 GW of zero-carbon generating capacity is currently seeking transmission access, as is 82 GW of natural gas capacity. Hybrids projects (co-locating multiple generation and/or storage types) comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 457 GW of solar hybrids (primarily solar+battery) and 24 GW of wind hybrids are currently active in the queues; over half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 21% of the projects (and 14% of capacity) seeking connection from 2000 to 2017 have been built as of the end of 2022. Additionally, interconnection wait times are on the rise: The typical duration from connection request to commercial operation increased from <2 years for projects built in 2000-2007 to nearly 4 years for those built in 2018-2022 (with a median of 5 years for projects built in 2022).

24 POWER TRANSMISSION AND DISTRIBUTION↗