Engineering topics
Luo, Y.
Publications and source records attributed to Luo, Y..
Simulation study of head-on beam-beam compensation with realistic RHIC lattices
N/A
Beam-Beam Observations in RHIC
The relativistic heavy ion collider (RHIC) at Brookhaven National Laboratory has been in operation since 2000. Over the past decade the luminosity in the polarized proton (p-p) operations has increased by more than one order of magnitude. The maximum total beam-beam tune shift with two collisions has reached 0.018. The beam-beam interaction leads to large tune spread, emittance growth, and short beam and luminosity lifetimes. In this article, we review the beam-beam observations during the previous RHIC p-p runs. The mechanism for particle loss is presented. The intra-beam scattering (IBS) contributions to emittance and bunch length growths are calculated and compared with the measurements. In the end we will discuss current limits in the RHIC p-p operations and their solutions.
Development and beam test of a continuous wave radio frequency quadrupole accelerator
Not Available
Wide range tune scan simulations for RHIC
In this article, we report on numerical simulations to calculate dynamic apertures over wide tune ranges for RHIC. Three Blue ring lattices are used as the starting points: 2012 255 GeV polarized proton lattice, 2010 100 GeV ion run lattice, and 2012 100 GeV ion run lattice. For each lattice, we scan the fractional tunes from (0.011,0.001) to (0.991, 0.990) with a step size of 0.001 by adjusting the main arc quadrupoles QFs and QDs. The tracking results are presented, together with the resonance structures, β-beats w.r.t the base lattices, and nonlinear chromaticities.
Wide range tune scan simulations for RHIC
In this article, we report on numerical simulations to calculate dynamic apertures over wide tune ranges for RHIC. Three Blue ring lattices are used as the starting points: 2012 255 GeV polarized proton lattice, 2010 100 GeV ion run lattice, and 2012 100 GeV ion run lattice. For each lattice, we scan the fractional tunes from (0.011,0.001) to (0.991, 0.990) with a step size of 0.001 by adjusting the main arc quadrupoles QFs and QDs. The tracking results are presented, together with the resonance structures, β-beats w.r.t the base lattices, and nonlinear chromaticities.
Beam-beam effects in RHIC
In this article we review the beam-beam effects in the polarized proton runs in the Relativistic Heavy Ion Collider (RHIC). The operational observations, limitations, and the next luminosity goal are presented and discussed. With an upgraded polarized proton source, the proton bunch intensity will be increased from 1.7 × 10 11 up to 3.0 × 10 11 . To accommodate the large beam-beam tune spread in the current tune space between 2/3 and 7/10 and to compensate the nonlinear beam-beam resonance driving terms, head-on beam-beam compensation with electron lenses (e-lenses) is to be installed.
Proton beam lifetime increase with 10- and 12-pole correctors in the Relativistic Heavy Ion Collider
10- and 12-pole correctors were installed in a number of machines and are also considered for future machines. In the Relativistic Heavy Ion Collider (RHIC) 10- and 12-pole correctors exist to correct for the detrimental effects of magnetic field errors in the interaction region magnets. These field errors in conjunction with beam-beam effects and parameter modulations dominate the beam lifetime in polarized proton operation. During the 2009 polarized proton run 10- and 12-pole correctors were set through an iterative procedure, and used for the first time operationally in one of the beams. We report on the procedure to set these high-order multipole correctors, compare the found values with calculated ones, estimate the effect of the new corrector settings on the integrated luminosity, and calculate the effect of both the calculated and experimentally found corrector strengths on the dynamic aperture.
Beam-Beam Effects in RHIC
In this article we review the beam-beam effects in the polarized proton runs in the Relativistic Heavy Ion Collider (RHIC). The operational observations, limitations, and the next luminosity goal are presented and discussed. With an upgraded polarized proton source, the proton bunch intensity will be increased from 1.7 x 10 11 up to 3.0 x 10 11 . To accommodate the large beam-beam tune spread in the current tune space between 2/3 and 7/10 and to compensate the nonlinear beam-beam resonance driving terms, head-on beam-beam compensation with electron lenses (e-lenses) is to be installed.
Proton beam lifetime increase with 10- and 12-pole correctors in the Relativistic Heavy Ion Collider
10- and 12-pole correctors were installed in a number of machines and are also considered for future machines. In the Relativistic Heavy Ion Collider (RHIC) 10- and 12-pole correctors exist to correct for the detrimental effects of magnetic field errors in the interaction region magnets. These field errors in conjunction with beam-beam effects and parameter modulations dominate the beam lifetime in polarized proton operation. During the 2009 polarized proton run 10- and 12-pole correctors were set through an iterative procedure, and used for the first time operationally in one of the beams. We report on the procedure to set these high-order multipole correctors, compare the found values with calculated ones, estimate the effect of the new corrector settings on the integrated luminosity, and calculate the effect of both the calculated and experimentally found corrector strengths on the dynamic aperture.
Report on Betatron Phaseadvance Measurements with Phaseshifter in RUN 12
The function of upcoming E-lens requests the phase advance between the collision IP and location of E-lens(IP10) to be integer multiples of pi. The RHIC quadrupole mains were modified(phaseshifter) to allow the control of phase advance between IP8 and IP10. Measurements were made during RHIC run 2012 to confirm the effect of phaseshifter on the betatron phase advance between the two IPs. The results are reported in this paper.
Local 3Q y betatron resonance correction in the 2012 RHIC 250 GeV run
In this article we performed numerical simulations to correct the local vertical third order betatron resonance 3Qy in the interaction regions in the Yellow ring for the 2012 RHIC 250 GeV polarized proton run. Considering the main sources of skew sextupoles are located in the interaction regions, we used local bump methods to minimize their contributions to the global 3Qy resonance driving term. Two kinds of correction orbit bumps are tested and the dynamic apertures with these correction strengths are calculated and compared.
Beam-beam effects with stochastic cooling in the 2012 RHIC 100 GeV heavy ion run
The 3-D stochastic cooling has been implemented in RHIC for the first time in the 2012 heavy ion run. In the U-U run, the U beam’s transverse emittances were cooled from initially about 13.5 mm.mrad down to 2.5 mm.mrad. The beam-beam parameters reached a maximum of -0.005. In the Cu-Au run, due to the unbalanced transverse beam sizes of the Cu and Au beams in the first several hours at the store, the Cu beam lifetime was significantly reduced by the beam-beam interaction. To maintain the Cu beam lifetime and to maximize the integrated luminosity, we intentionally reduced the cooling rate for the Au beam until the Cu beam got cooled. In this article, we review the beambeam effects in the 2012 RHIC heavy ion run and carry out numerical simulations to interpret the observations.
Dynamic aperture calculations for the 2012 RHIC 100 GeV polarized proton run
In this article, we summarize the dynamic aperture calculations for the 2012 RHIC 100 GeV polarized proton run. We varied β ∗ at the interaction action points, calculated the off-momentum dynamic aperture, and investigated the dependence of dynamic aperture on the proton bunch intensity and the proton beam transverse emittance. Based on the off-line optics model, we also applied second order chromaticity correction in the Yellow ring and compared the calculated dynamic apertures without and with the correction. In the end we compared the off-momentum dynamic apertures with different voltages of 197 MHz Landau RF cavity.