Engineering Papers⌕ Search

Engineering topics

Joe Ward

Publications and source records attributed to Joe Ward.

Transforming any Facility for Meeting Strict Cleanliness Requirements

Over the life of the James Webb Space Telescope (JWST), Integration & Test (I&T) has taken place in areas that needed considerable work to make the facility itself and/or the protocols used while working in the rooms suitable to meet JWST percent area coverage (PAC) and molecular accumulation requirements. In addition to normal particulate matter, JWST had a uniquely significant challenge: fibers! Fibers not only cause much higher PAC levels, but they also risk damaging the angstrom sized Near Infrared Spectrometer (NIRSpec) microshutter array (MSA), which is critical to NIRSpec instrument performance. The primary emphasis of this paper is to address particulate and fiber contamination. The success of the JWST mission required effective cleanrooms, protocols, and mitigations in non-cleanroom areas that were pressed into service to house contamination-sensitive optics and scientific instruments. Some presented profound challenges. These included: NASA’s 60-year-old Johnson Space Center (JSC) Chamber A, which had never been used for anything contamination-sensitive, and the European tropical launch facilities, which were designed to meet International Standard Organization (ISO) Class 8 processing for communication satellites. The final challenge for JWST, as if to stare us in the face and say, “I dare you to try and make me clean enough,” was preparing the 4 areas in the Centre Spatial Guyanais (CSG) Final Assembly Building (BAF) located in French Guiana, a building in which one entire side opens for Ariane 5 rocket ingress and egress. This paper will describe our initial evaluation processes and the actual work undertaken to transform even the most challenging areas into first class cleanrooms that met JWST particulate and fiber requirements.

James Webb Space Telescope↗

Molecular Accumulation during JWST’s Optical Telescope Cryogenic Thermal Vacuum Testing

Maintaining molecular cleanliness during the JWST’s Optical Telescope/Instrument Module (OTIS) Cryogenic Thermal Vacuum (TV) test campaign was critical to the success of its optical mission on orbit. In the thermal vacuum tests leading up to the final cryogenic test to validate the OTIS flight hardware, NASA Johnson Space Center’s (JSC’s) TV Chamber A was fully characterized for molecular contamination. It was found to contain common volatile condensable materials (VCM), including hydrocarbons, plasticizers, and silicones, all of which absorb in JWST’s infrared wavelength region. Due to the risks involved, cleaning molecular contamination from the OTIS mirrors was not an option and heating the Primary Mirror (PM) segments would have also been a risky and expensive endeavor. As a result, a monitoring process was developed and implemented during four different Pathfinder or risk reduction tests that were scheduled to occur prior to the flight hardware test. The goal was to quantify and assess the risk of molecular contamination depositing on the PM resulting from relatively warm chamber shrouds “leading” colder PM mirrors during warmup, by a margin of 10-50 Kelvin (K). This was accomplished using Cryogenic Quartz Crystal Microbalances (CQCMs), held at temperatures slightly cooler than the segments to signal the onset of contamination events. Per the JWST Contamination Control Plan (CCP)1, the total Primary Mirror molecular allocation requirement was 50 angstroms. In all tests, the results showed an average accumulated molecular contamination of <10 angstroms.

molecular, contamination, thermal vacuum, cryogeni↗

Operating and Maintaining the JWST Cleanroom attached to JSC's Chamber A during preparations for the OTIS Cryogenic Thermal Vacuum Test

In order to maintain cleanliness during preparations for JWST’s OTIS (Optical Telescope Element-Integrated Science Instrument Module) Cryogenic Thermal Vacuum Test, a cleanroom was built that attached directly to the 60-year-old Chamber A. The cleanroom and chamber were outfitted with independent environmental control systems each providing ISO Class 71 air cleanliness. To maintain balanced, positive pressure in both the cleanroom and chamber volumes, a special control protocol was developed and successfully implemented. Dual back-up environmental control units (one each for the chamber and cleanroom) were installed just outside the building to provide environmental control redundancy due to a single source chilled water supply and weather threats. In addition, lack of a dedicated cleanroom airlock facilitating clean ingress and egress made it necessary to perform additional cleaning and packaging, as well as augment the uncontrolled truck lock space with small clean tents for pre-cleaning. Special procedures were developed to allow ingress of extra-large support equipment required for load testing of the cleanroom crane, installation of optical equipment in Chamber A and accommodation of the OTIS shipping container. A thorough bake-out and cleaning of Chamber A was also necessary to reduce volatiles from the shroud’s black thermal paint and to reduce particle fallout. Acrylic adhesive fracture discovered during early cryo-testing represented a significant challenge that was successfully mitigated prior to OTIS testing. A dedicated team of Contamination Control (CC) Technicians was specifically trained to clean support equipment and screen materials entering the cleanroom and chamber to ensure cleanliness and vacuum compatibility.

James Webb Space Telescope↗

Predicting contamination accumulation in facilities with limited data

"In preparation for the James Webb Space Telescope (JWST) launch at Centre Spatial Guyanias (CSG) in French Guiana, particulate contamination accumulation predictions were necessary for each facility in which the hardware would be exposed because the Telescope would be uncovered in each of the facilities and had strict particulate requirements. These included facilities for final integration and testing, fueling, transportation and encapsulation. Minimal heritage data existed from CSG and previous launch campaigns to use as a basis for contamination predictions. Data from the Automatic Transfer Vehicle and Herschel & Planck launch campaigns were used in conjunction with facility monitoring data provided by ESA and data collected during JWST working group visits to CSG. These campaigns were conducted at varying cleanliness levels that were typically less stringent than JWST requirements. Each facility was evaluated using the data provided and likely performance improvement with the addition of High Efficiency Particulate Air filter (HEPA) banks operating when possible. Once the launch campaign was completed, the predicted fallout was compared with actual data collected throughout the campaign. Based on the actual measurements, JWST’s primary and secondary mirrors are likely much cleaner than was expected with the predicted fallout in each facility. "

James Webb Space Telescope, contamination, cleanro↗