Engineering Papers⌕ Search

Engineering topics

Jackson, A.

Publications and source records attributed to Jackson, A..

Overview of fast particle experiments in the first MAST Upgrade experimental campaigns

Abstract MAST-U is equipped with on-axis and off-axis neutral beam injectors (NBI), and these external sources of super-Alfvénic deuterium fast-ions provide opportunities for studying a wide range of phenomena relevant to the physics of alpha-particles in burning plasmas. The MeV range D-D fusion product ions are also produced but are not confined. Simulations with the ASCOT code show that up to 20% of fast ions produced by NBI can be lost due to charge exchange (CX) with edge neutrals. Dedicated experiments employing low field side (LFS) gas fuelling show a significant drop in the measured neutron fluxes resulting from beam-plasma reactions, providing additional evidence of CX-induced fast-ion losses, similar to the ASCOT findings. Clear evidence of fast-ion redistribution and loss due to sawteeth (ST), fishbones (FB), long-lived modes (LLM), Toroidal Alfvén Eigenmodes (TAE), Edge Localised Modes (ELM) and neoclassical tearing modes (NTM) has been found in measurements with a Neutron Camera (NCU), a scintillator-based Fast-Ion Loss Detector (FILD), a Solid-State Neutral Particle Analyser (SSNPA) and a Fast-Ion Deuterium- α (FIDA) spectrometer. Unprecedented FILD measurements in the range of 1–2 MHz indicate that fast-ion losses can be also induced by the beam ion cyclotron resonance interaction with compressional or global Alfvén eigenmodes (CAEs or GAEs). These results show the wide variety of scenarios and the unique conditions in which fast ions can be studied in MAST-U, under conditions that are relevant for future devices like STEP or ITER.

Physics↗

HighNESS conceptual design report: Volume I

The European Spallation Source, currently under construction in Lund, Sweden, is a multidisciplinary international laboratory. Once completed to full specifications, it will operate the world’s most powerful pulsed neutron source. Supported by a 3 million Euro Research and Innovation Action within the EU Horizon 2020 program, a design study (HighNESS) has been completed to develop a second neutron source located below the spallation target. Compared to the first source, designed for high cold and thermal brightness, the new source has been optimized to deliver higher intensity, and a shift to longer wavelengths in the spectral regions of cold (CN, 2–20 Å), very cold (VCN, 10–120 Å), and ultracold (UCN, >500 Å) neutrons. The second source comprises a large liquid deuterium moderator designed to produce CN and support secondary VCN and UCN sources. Various options have been explored in the proposed designs, aiming for world-leading performance in neutronics. These designs will enable the development of several new instrument concepts and facilitate the implementation of a high-sensitivity neutron-antineutron oscillation experiment (NNBAR). This document serves as the Conceptual Design Report for the HighNESS project, representing its final deliverable.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

HighNESS conceptual design report: Volume II. The NNBAR experiment.

A key aim of the HighNESS project for the European Spallation Source is to enable cutting-edge particle physics experiments. This volume presents a conceptual design report for the NNBAR experiment. NNBAR would exploit a new cold lower moderator to make the first search in over thirty years for free neutrons converting to anti-neutrons. The observation of such a baryon-number-violating signature would be of fundamental significance and tackle open questions in modern physics, including the origin of the matter-antimatter asymmetry. This report shows the design of the beamline, supermirror focusing system, magnetic and radiation shielding, and anti-neutron detector necessary for the experiment. A range of simulation programs are employed to quantify the performance of the experiment and show how background can be suppressed. For a search with full background suppression, a sensitivity improvement of three orders of magnitude is expected, as compared with the previous search. Civil engineering studies for the NNBAR beamline are also shown, as is a costing model for the experiment.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Constraints on the putative companions to PSR1257+12

The radio pulsar PSR1257+12 was first observed about two years ago at the Arecibo radio telescope. It has a pulse period of 6.2 milliseconds which makes it one of only a handful of known objects of this type that spin at a dizzying rate of several hundred times per second. Routine follow-up monitoring of this object has continued since its discovery. The pulsar's discoverer has recently reported that a standard analysis of the time-of-arrival measurements of the radio pulses from PSR1257+12 showed that after accounting for the usual features of millisecond pulsars, there remained a residual in the signal which appeared to be a superposition of two components, one with a period of 98 days and the other with a period of 66 days. This was interpreted as being due to the presence of two low mass companions in orbit about the pulsar. The amplitude of the individual components in the residuals then gives a measure of the masses of the companions, up to a factor 1/sin i where i is the inclination of the orbital plane to the plane of the sky, so that a lower limit of the companion masses is well defined. The work reported in this paper tests the validity of this interpretation through orbital dynamics.

Malhotra, R.↗

Advanced manufacturing development of a composite empennage component for L-1011 aircraft. Phase 3: Production readiness verification testing

Twenty-two specimens of each of two key structural elements of the Advance Composite Vertical Fin (ACVF) were fabricated and tested. One element represented the front spar at the fuselage attachment area and the other element represented the cover at the fuselage joint area. Ten specimens of each element were selected for static testing. The coefficient of variation resulting from the tests was 3.28 percent for the ten cover specimens and 6.11 percent for the ten spar specimens, which compare well with metallic structures. The remaining twelve cover and twelve spar specimens were durability tested in environmental chambers which permitted the temperature and humidity environment to be cycled as well as the applied loads. Results of the durability tests indicated that such components will survive the service environment.

Jackson, A.↗

Advanced manufacturing development of a composite empennage component for L-1011 aircraft

This is the final report of technical work conducted during the fourth phase of a multiphase program having the objective of the design, development and flight evaluation of an advanced composite empennage component manufactured in a production environment at a cost competitive with those of its metal counterpart, and at a weight savings of at least 20 percent. The empennage component selected for this program is the vertical fin box of the L-1011 aircraft. The box structure extends from the fuselage production joint to the tip rib and includes front and rear spars. During Phase 4 of the program, production quality tooling was designed and manufactured to produce three sets of covers, ribs, spars, miscellaneous parts, and subassemblies to assemble three complete ACVF units. Recurring and nonrecurring cost data were compiled and documented in the updated producibility/design to cost plan. Nondestruct inspections, quality control tests, and quality acceptance tests were performed in accordance with the quality assurance plan and the structural integrity control plan. Records were maintained to provide traceability of material and parts throughout the manufacturing development phase. It was also determined that additional tooling would not be required to support the current and projected L-1011 production rate.

Alva, T.↗

Flight service evaluation of an advanced composite empennage component on commercial transport aircraft. Phase 1: Engineering development

The empennage component selected for this program is the vertical fin box of the L-1011 aircraft. The box structure extends from the fuselage production joint to the tip rib and includes the front and rear spars. Various design options were evaluated to arrive at a configuration which would offer the highest potential for satisfying program objectives. The preferred configuration selected consists of a hat-stiffened cover with molded integrally stiffened spars, aluminum trussed composite ribs, and composite miniwich web ribs with integrally molded caps. Material screening tests were performed to select an advanced composite material system for the Advanced Composite Vertical Fin (ACFV) that would meet the program requirements from the standpoint of quality, reproducibility, and cost. Preliminary weight and cost analysis were made, targets established, and tracking plans developed. These include FAA certification, ancillary test program, quality control, and structural integrity control plans.

Ary, A.↗

Carrier extraction circuit

Feedback loop extracts demodulated reference signals from IF input and feeds signal back to demodulator. Since reference signal is extracted directly from carrier, no separate reference need be transmitted. Circuit obtains coherent carrier from balanced or unbalanced four-phase signal of varying characteristics.

Solomon, K.↗