Engineering PapersSearch

Engineering topics

Iok M Wong

Publications and source records attributed to Iok M Wong.

Tall Lunar Tower (TLT) Powering Exploration at the Moon's South Pole

Animation of a conceptual Lunar mission for the Tall Lunar Tower (TLT) robotic in-space assembly system. The landing, deployment, and operation of the tower assembly system is shown. A successful tower assembly and solar power payload is depicted at the lunar south pole. The video is intended to convey how an engineering development unit (EDU) demonstrated at NASA Langley Research Center may look when operated on the Lunar surface. The EDU models are shown in place of flight hardware. The animation was produced by the Advanced Concepts Laboratory with models provided by the TLT team.

Tall Lunar Tower

Near-term Persistent Platform Orbital Testbed: Three Candidate Architecture Options

On-orbit Servicing, Assembly, and Manufacturing (OSAM) will revolutionize the space industry by transforming the concept of operations of space systems and enabling new, radically different system implementations. These new implementations will benefit from a novel persistent asset design paradigm which focuses on evolvable designs that are tailored to the operational environment, not the launch environment. In addition, the ability to launch sub-systems independently enable future persistent assets to economically expand in capability and size, achieving cost effective and productive operations lasting for decades like terrestrial observatories. With few exceptions (International Space Station, Hubble Space Telescope, Mission Extension Vehicle customers), current space systems are not visited once they are operational. Leveraging emerging low cost commercial launch provides the ability to repeatedly and routinely revisit space systems. Thus, revolutionary new approaches for space system design are possible, creating completely new opportunities for small businesses and accelerating the growth of already established space industries. To usher in the revolutionary new operational paradigm, two things are needed. First, to build confidence in the technology and new paradigm, there must be a leading example, a bellwether persistent asset, that demonstrates the reliability and maturity of the new persistent asset paradigm (where repeated visits are common). Second, in order to rapidly advance and validate OSAM capabilities, an efficient means is required to conduct tests in the space environment. A persistent platform testbed satisfies both these needs. The space environment exhibits a plethora of characteristics that are difficult and costly to accurately simulate for a full system in a terrestrial laboratory, such as near zero gravity, a wide range of ionizing radiation types, atomic oxygen, and micro-meteoroids and space debris traveling at high velocity. In addition, since persistent assets range in mass from a few grams to several metric tons, it is difficult to accurately simulate interactions between these systems and visiting vehicles (that also exhibit a wide range of varying masses and capabilities). These interactions include the transmission of forces and/or exchanging mass (in the form of instruments, fuel, robotic assets, etc.). Thus, a rapid, versatile and cost efficient in-space testing capability that includes a persistent test platform and a surrounding in-space test zone is needed to mature technologies through experimentation. The testbed can provide common services, such as: power, thermal control, vibration isolation, data transmission between experiments and terrestrial experimenters, station-keeping, pointing, and robotic agents that can be leveraged by customer experiments. The onboard robotic agents can be used to provide payload handling services, such as: assembly, change out or upgrade, relocation, connecting/disconnecting utilities, inspection, repair or servicing, etc. Since the persistent platform cost will be amortized over many hosted payloads, its services can eventually be offered at a price much lower than if one were to design a unique and dedicated spacecraft and mission for those few experiments. The key to achieving an effective testbed is providing efficient cost effective access and infrastructure to a variety of commercial, academic and government customers coupled with extensibility, in the capability of an individual persistent platform test bed or replication of the test bed in a different operational regime. Three potential options for implementing a test bed were developed and evaluated in this study.

Persistent Platform

Supervised Autonomous Assembly to Create and Evolve Persistent Assets

Supervised autonomous assembly (SAA) will create a paradigm shift in the planning and design of future persistent assets (PAs), both in near zero-g environments and on planetary surfaces. SAA refers to an autonomy approach that has the benefits of autonomous assembly as well as the benefits provided by a supervisor (operator) who is available to resolve unexpected situations. SAA provides both increased design freedom as well as reduced programmatic risk. SAA enables evolution of future PAs over decades as in-space operations transition from single purpose missions to creation of PAs, such as laboratories and experimental stations which more closely resembling terrestrial laboratories that can easily adapt and evolve to new missions leveraging repeated visits to the PA. The ability to evolve enables PAs to rapidly respond to changing objectives resulting from new questions as our understanding improves. A recently initiated National Aeronautics and Space Administration (NASA) project in the Space Technology Mission Directorate (STMD) Game Changing Development (GCD) Program called the Precision Assembled Space Structure (PASS), leverages the advantages of SAA to develop technologies that enable efficient creation and evolution of hexagonal topologies; both planar (example: fuel depots) and curved (examples: telescopes and shelters). PASS will be used to provide context for the philosophy and concepts discussed as well as the decision and selections made. PASS objectives are: a) Develop confidence in SAA and on-orbit servicing, assembly and manufacturing (OSAM) technologies by executing a test campaign that uses a path-to-flight autonomous precision assembly process directly applicable to future space telescopes. b) Test autonomous technologies including automated path planning and error recovery, to emphasize a robust approach that relies on generic robots and special purpose tools. c) Validate critical component models using a digital twin that includes the assembled primary mirror support structure and assembly process. A digital twin is a high-fidelity simulation of the asset capable of predicting the on-orbit performance. The paper concludes after identifying the critical need for a modest assembly flight experiment to validate and develop confidence in the SAA paradigm, thus accelerating adoption of the benefits described. SAA is a game changing paradigm that enhances the ability of an organization to infuse new technology through rapid evolution of PAs while leveraging OSAM technologies.

Structural Modeling

Design Analysis for Lunar Safe Haven Concepts

NASA’s plan to return humans to the lunar surface faces many challenges, especially in the sustained phases of the Artemis program. In combination with a habitat, a Lunar Safe Haven (LSH) would provide additional protection to crew, electronics, and equipment from the hazards of the space environment such as radiation, thermal extremes, micrometeoroids, and lunar dust. Influenced by the NASA Artemis program goals, the Lunar Safe Haven Study defined the high-level requirements, outlined the trade space for a LSH concept, and evaluated a set of concepts using a decision analysis structure. This paper will provide additional detail for two concepts that were designed and evaluated during the LSH study, the logic behind the choices, and some of the main driving design parameters.

lunar

Programable Lead Screw Actuated Self-Leveling Platform – PLSASLP

The programmable lead screw actuated self-leveling platform (PLSASLP) is developed to provide a self-leveling and load bearing foundation required by various autonomously operated planetary surface robotic or deployable systems. PLSASLP is capable of self-leveling from a 15-degree offset to accommodate the landing slope tolerance found on most landers designed to land on the surface of the Moon or Mars.

Iok M Wong

Programable Lead Screw Actuated Self-Leveling Platform – PLSASLP

The programmable lead screw actuated self-leveling platform (PLSASLP) is developed to provide a self-leveling and load bearing foundation required by various autonomously operated planetary surface robotic or deployable systems. PLSASLP is capable of self-leveling from a 15-degree offset to accommodate the landing slope tolerance found on most landers designed to land on the surface of the Moon or Mars.

Iok M Wong

Hardware Systems and EDU Demonstration of the Tall Lunar Tower Project

The Tall Lunar Tower (TLT) project developed a robotic tower assembly system (RTAS) and TLT Truss engineering development units (EDUs) to perform a ground demonstration of supervised semi-autonomous robotic assembly of a truss-based tall tower. Truss structures provide exceptional strength-to-weight ratios for payload capabilities supporting large masses. On the lunar surface, tall towers are a critical structural system that will enable significant solar power generation by supporting vertical solar arrays and beyond-the-horizon communications at the lunar south pole, supporting the Artemis mission architecture, as well as a lunar economy. Tall towers, greater than 30-meters-tall, provide the elevation needed for more consistent solar power generation due to low inclination sunlight and deep shadowing from surface features on the lunar surface at the poles. The robotic structural assembly technologies developed for truss-based tall towers will also enable other large-scale functional lunar structures to be built, including launch plume deflectors, lunar safe havens for astronauts and assets, surface transportation for cargo, and other critical infrastructure. Robotic assembly of truss structures for lunar surface infrastructure is near-term enabling for future Artemis mission campaign and Moon to Mars Objectives needs for power and communication. The project team designed, fabricated, tested, and demonstrated the RTAS EDU by assembling a TLT Truss EDU in a laboratory environment. The hardware systems and the supervised semi-autonomous assembly process for a TLT assembled EDU design, along with descriptions of a hardware demonstration are presented.

In-space Assembly