Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “workload transitions”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Transitioning GlideinWMS, a multi domain distributed workload manager, from GSI proxies to tokens and other granular credentials

GlideinWMS is a distributed workload manager that has been used in production for many years to provision resources for experiments like CERN’s CMS, many Neutrino experiments, and the OSG. Its security model was based mainly on GSI (Grid Security Infrastructure), using X.509 certificate proxies and VOMS (Virtual Organization Membership Service) extensions. Even when other credentials, like SSH keys, were used to authenticate with resources, proxies were also added all the time, to establish the identity of the requestor and the associated memberships or privileges. This single credential was used for everything and was, often implicitly, forwarded wherever needed. The addition of identity and access tokens and the phase-out of GSI forced us to reconsider the security model of GlideinWMS, to handle multiple credentials which can differ in type, technology, and functionality. Both identity tokens and access tokens are supported. GSI proxies even if no more mandatory, are still used, together with various JWT (JSON Web Token) based tokens and other certificates. The functionality of the credentials, defined by issuer, audience, and scope, also differ: a credential can allow access to a computing resource, or can protect the GlideinWMS framework from tampering, or can grant read or write access to storage, can provide an identity for accounting or auditing, or can provide a combination of any the formers. Furthermore, the tools in use do not include automatic forwarding and renewal of the new credentials so credential lifetime and renewal requirements became part of the discussion as well. In this paper, we will present how GlideinWMS was able to change its design and code to respond to all these changes.

97 MATHEMATICS AND COMPUTING↗

Dynamic Human-in-the-Loop Simulated Nuclear Power Plant Thermal Dispatch System Demonstration and Evaluation Study

An Idaho National Laboratory research team performed a human-in-the-loop study with two formerly licensed retired operators to evaluate thermal power dispatch operations supported by the modified GSE Systems GPWR plant simulator. Virtual representations of the analog control panels were presented on touch-screen bays configured to mimic the control room layout in the newly renovated Human Systems Simulation Laboratory. The operators performed 15 scenarios covering normal evolutions to transition the plant from full turbine operation to joint turbine and thermal power dispatch operations in addition to transient response scenarios induced with simulated faults to evaluate the impact of thermal power dispatch system on operator and plant responses. A prototype human-system interface (HSI) was developed and displayed in tandem with the virtual analog panels to support the operators executing the procedurally drive evolutions and transient responses. An interdisciplinary team of operations experts, nuclear engineers, and human factors experts observed the operators performing the scenarios to evaluate the operations. Only a preliminary analysis of the results has been performed. The full analysis will be shared in a milestone report scheduled for release at the end of September; however, some high-level conclusions were readily available. Two high level findings for the system design were captured in the study. The manual control supported by the HSI to transition from standard operations to thermal power dispatch operation imposed a considerable amount of workload on the operators due to tedious manual valve manipulations and system monitoring required to verify their intended effect. An additional operator would be required in the control room to support the daily evolution. Automatic control for the transition was deemed a requirement for plant adoption without imposing additional staffing costs. The second finding was the necessity for an automatic thermal power dispatch system trip isolation function linked to a turbine and reactor trip signal. The operators completed scenarios with automatic isolation functionality and manually required actuation of the thermal power dispatch system. The operator response was sufficiently slower in the manual trip condition, such that operators were unable to manually actuate key post trip safety functions an indicate a degraded control capability that should be avoided. With an automatic trip signal little to no impact of the thermal power dispatch system was identified on the primary plant response and therefore the system could be readily and safely adopted. Together these two findings represent the need to support the adoption of thermal power dispatch capability into existing operations by leveraging automation to augment any additional operator tasking required to control and monitor an additional system beyond existing operations.

99 GENERAL AND MISCELLANEOUS↗

Evaluating the Cloud for Capability Class Leadership Workloads

Cloud platforms offer a variety of benefits that are very appealing for a large scale HPC facility with a diverse and dynamic user base and workload set. At the same time, there is cause for concern about transitioning to the cloud. Incorporating cloud resources into existing HPC facilities or even fully transitioning to a cloud deployment poses significant challenges at the technical, organizational, and economic levels. Regardless, based on current trends it is highly likely that cloud platforms will become an integral component of many HPC centers in some form. To gain a better understanding of both the limitations and capabilities of current cloud infrastructures we evaluated the public offerings of the three leading cloud platforms (Amazon Web Services, Microsoft Azure, and Google Cloud Platform) using a selection of representative application workloads from our facility. Our findings show that while current HPC offerings are still nascent, significant progress is being made to address the present shortcomings. At the same time, significant challenges and questions remain about whether HPC cloud offerings will be able to deliver the full range of expected benefits.

97 MATHEMATICS AND COMPUTING↗

In-Transit Data Transport Strategies for Coupled AI-Simulation Workflow Patterns

Coupled AI-Simulation workflows are becoming the major workloads for HPC facilities, and their increasing complexity necessitates new tools for performance analysis and prototyping of new in-situ workflows. We present SimAI-Bench, a tool designed to both prototype and evaluate these coupled workflows. In this paper, we use SimAI-Bench to benchmark the data transport performance of two common patterns on the Aurora supercomputer: a one-to-one workflow with co-located simulation and AI training instances, and a many-to-one workflow where a single AI model is trained from an ensemble of simulations. For the one-to-one pattern, our analysis shows that node-local and DragonHPC data staging strategies provide excellent performance compared Redis and Lustre file system. For the many-to-one pattern, we find that data transport becomes a dominant bottleneck as the ensemble size grows. Our evaluation reveals that file system is the optimal solution among the tested strategies for the many-to-one pattern.

Tummalapalli, Harikrishna [Argonne National Labora↗

Lifting and Dropping VMs to Dynamically Transition Between Time- and Space-sharing for Large-Scale HPC Systems

As HPC environments increasingly integrate with edge based systems, system architectures will need to handle a broader class of workloads and scheduling requirements. One result of this shift will be the need to simultaneously support bulk-synchronous parallel (BSP) and on-demand service based applications on the same infrastructure. This in turn will require that future resource management approaches utilize both space-shared as well as time-shared resource scheduling strategies. In this work we introduce the concept of "VM-lifting'' (and its inverse "VM-Dropping'') which allows dynamically switching an HPC workload between space-shared and time-shared scheduling regimes. Our work targets co-kernel based HPC system software environments, in which multiple specialized OS kernels execute natively on dedicated physical resource partitions inside a single compute node. With VM-lifting, a native co-kernel can be migrated at runtime to and from locally hosted Virtual Machine Environments due to changing scheduling requirements of the node. This allows an HPC node to be dynamically (re-)configured as either a time-shared Infrastructure-as-a-Service (IaaS) resource or a dedicated space shared resource based on the current workload demands. We have implemented this approach in the context of the Hobbes Exascale System Software stack and have demonstrated that a node can be reconfigured with minimal impact on the running applications.

Gordon, Nick↗

IRIS-GNN: Leveraging Graph Neural Networks for Scheduling on Truly Heterogeneous Runtime Systems

The diversity of accelerators in computer systems poses significant challenges for software developers, such as managing vendor-specific compiler toolchains, code fragmentation requiring different kernel implementations, and performance portability issues. To address these, the Intelligent Runtime System (IRIS) was developed. IRIS works across various systems, from smartphones to supercomputers, enabling automatic performance scaling based on available accelerators. It introduces abstract tasks for seamless execution transitions between accelerators while ensuring memory consistency and task dependencies. Although IRIS simplifies system details, optimal dynamic scheduling still requires user input to understand workload structures. To address this, we introduce a new scheduling policy for IRIS, termed IRIS-GNN, which is the first IRIS hybrid policy that operates in conjunction with the dynamic policies. This policy employs a Graph-Neural Network (GNN) to conduct Graph Classification of any task graphs submitted to IRIS. This GNN analyzes the structure and attributes of the task graph, categorizing it as either locality, concurrency, or mixed. This classification subsequently guides the selection of the dynamic policy used by IRIS. We provide a comparison of the performance of IRIS-GNN against the complete spectrum of IRIS’s dynamic policies, assess the overhead introduced by the GNN within this scheduling framework, and ultimately explore its practical application in real-world scenarios.

Johnston, Beau↗

Oscillatory Spreading and Inertia in Power Grids

The increase in variable renewable generators (VRGs) in power systems has altered the dynamics from a historical experience. VRGs introduce new sources of power oscillations, and the stabilizing response provided by synchronous generators (SGs, e.g., natural gas, coal, etc.), which help avoid some power fluctuations, will lessen as VRGs replace SGs. These changes have led to the need for new methods and metrics to quickly assess the likely oscillatory behavior for a particular network without performing computationally expensive simulations. This work studies the impact of a critical dynamical parameter - the inertia value - on the rest of a power system's oscillatory response to representative VRG perturbations. We use a known localization metric in a novel way to quantify the number of nodes responding to a perturbation and the magnitude of those responses. This metric allows us to relate the spread and severity of a system's power oscillations with inertia. We find that as inertia increases, the system response to node perturbations transitions from localized (only a few close nodes respond) to delocalized (many nodes across the network respond). We introduce a heuristic computed from the network Laplacian to relate this oscillatory transition to the network structure. We show that our heuristic accurately describes the spread of oscillations for a realistic power-system test case. Using a heuristic to determine the likely oscillatory behavior of a system given a set of parameters has wide applicability in power systems, and it could decrease the computational workload of planning and operation.

dynamical systems↗

Enabling Seamless Transitions from Experimental to Production HPC for Interactive Workflows

The evolving landscape of scientific computing requires seamless transitions from experimental to production HPC environments for interactive workflows. This paper presents a structured transition pathway developed at OLCF that bridges the gap between development testbeds and production systems. We address both technological and policy challenges, introducing frameworks for data streaming architectures, secure service interfaces, and adaptive resource scheduling for time-sensitive workloads and improved HPC interactivity. Our approach transforms traditional batch-oriented HPC into a more dynamic ecosystem capable of supporting modern scientific workflows that require near real-time data analysis, experimental steering, and cross-facility integration.

Etz, Brian [ORNL] (ORCID:0000000208554863)↗

A simulation framework for evaluating electronic order workflows in integrated health records

Electronic health record (EHR) systems are critical to modern healthcare delivery, yet the dynamic workflows that govern electronic order processing remain underexplored. Inefficiencies in these digital pathways can cause delays in care, repetitive workloads, and even patient harm. This study presents a discrete-event simulation framework used to reconstruct and evaluate EHR-based order workflows in a large integrated healthcare system. Using real-world data extracted from the Veterans Health Administration’s Corporate Data Warehouse, the authors mapped order events to standardized state transitions and modeled their progression across different facilities of varying complexity levels. After being calibrated with empirical distributions of transition times and validated against observed time-in-system metrics, the simulation demonstrates close alignment with historical performance. Scenario analyses reveal that resource capacity constraints significantly amplify the impact of electronic order surges, which are reflected in the disproportionate growth in backlogs and processing delays. Adjustments in transition probabilities further increased recirculation and extended workflow paths. Network-based analysis identified Reserved, InProgress, and Completed as structurally critical states that function as hubs within the process network but the transitions in-between also act as major bottlenecks. These results showcased the effectiveness of simulation-based approaches in monitoring EHR order processing performance and evaluating consequences of workflow changes on healthcare network resources planning. The proposed simulation framework provides a scalable data-driven tool to support operational decision-making and improve the efficiency of electronic order management in complex healthcare environments.

Engineering↗

Fermilab's Transition to Token Authentication

Fermilab is the first High Energy Physics institution to transition from X.509 user certificates to authentication tokens in production systems. All the experiments that Fermilab hosts are now using JSON Web Token (JWT) access tokens in their grid jobs. Many software components have been either updated or created for this transition, and most of the software is available to others as open source. The tokens are defined using the WLCG Common JWT Profile. Token attributes for all the tokens are stored in the Fermilab FERRY system which generates the configuration for the CILogon token issuer. High security-value refresh tokens are stored in Hashicorp Vault configured by htvault-config, and JWT access tokens are requested by the htgettoken client through its integration with HTCondor. The Fermilab job submission system jobsub was redesigned to be a lightweight wrapper around HTCondor. The grid workload management system GlideinWMS which is also based on HTCondor was updated to use tokens for pilot job submission. For automated job submissions a managed tokens service was created to reduce duplication of effort and knowledge of how to securely keep tokens active. The existing Fermilab file transfer tool ifdh was updated to work seamlessly with tokens, as well as the Fermilab POMS (Production Operations Management System) which is used to manage automatic job submission and the RCDS (Rapid Code Distribution System) which is used to distribute analysis code via the CernVM FileSystem. The dCache storage system was reconfigured to accept tokens for authentication in place of X.509 proxy certificates. As some services and sites have not yet implemented token support, proxy certificates are still sent with jobs for backwards compatibility, but some experiments are beginning to transition to stop using them.

Dykstra, Dave [Fermilab] (ORCID:0000000326539015)↗

Early experiences evaluating the HPE/Cray ecosystem for AMD GPUs

Summary The Oak Ridge Leadership Computing Facility (OLCF) has a long history of supporting and promoting GPU‐accelerated computing starting with the deployment of the Titan supercomputer in 2021 and continuing with the Summit supercomputer which has a theoretical peak performance of approximately 200 petaflops. Because the majority of Summit's computational power comes from its 27,972 GPUs, users must port their applications to one of the supported programming models in order to make efficient use of the system. To prepare the transition to Frontier, the OLCF's exascale supercomputer, users will need to adapt to an entirely new ecosystem which will include new hardware and software technologies. First, users will need to familiarize themselves with the AMD Radeon GPU architecture. Furthermore, users who have been previously relying on CUDA will need to transition to the Heterogeneous‐Computing Interface for Portability (HIP) or one of the other supported programming models (e.g., OpenMP, OpenACC). In this work, we describe our initial experiences and lessons learned in porting three applications or proxy apps currently running on Summit to the HPE/Cray ecosystem to leverage the compute power from AMD GPUs: minisweep, GenASiS, and Sparkler. Each one is representative of current production workloads utilized at the OLCF, different programming languages, and different programming models.

Melesse Vergara, Verónica G.↗

DIRAC current, upcoming and planned capabilities and technologies

DIRAC is the interware for building and operating large scale distributed computing systems. It is adopted by multiple collaborations from various scientific domains for implementing their computing models. DIRAC provides a framework and a rich set of ready-to-use services for Workload, Data and Production Management tasks of small, medium and large scientific communities having different computing requirements. The base functionality can be easily extended by custom components supporting community specific workflows. DIRAC is at the same time an aging project, and a new DiracX project is taking shape for replacing DIRAC in the long term. This contribution will highlight DIRAC’s current, upcoming and planned capabilities and technologies, and how the transition to DiracX will take place. Examples include, but are not limited to, adoption of security tokens and interactions with Identity Provider services, integration of Clouds and High Performance Computers, interface with Rucio, improved monitoring and deployment procedures.

97 MATHEMATICS AND COMPUTING↗

Vulcan Test Platform: Demonstrating the Data Center as a Flexible Grid Asset

Explosive data center demand is outpacing grid infrastructure development. AI workloads and hyperscale cloud growth are creating unprecedented power requirements, while traditional grid expansion faces multi-year development timelines, regulatory hurdles, and decarbonization challenges. Sidewalk Infrastructure Partners recognized this impending crisis years ago and founded Verrus to develop an innovative solution: data centers that function as grid assets rather than passive loads. The Verrus approach integrates proprietary grid-aware controls with battery energy storage systems (BESS) in a medium-voltage architecture that delivers three critical capabilities: Fast-responding demand flexibility that can service requests from the utility within 10 seconds, Uninterrupted transition to islanded operation during grid disturbances, Continuous uptime assurance while maintaining all customer service level commitments Through Verrus' strategic partnership with the National Renewable Energy Laboratory (NREL), we validated these capabilities on Vulcan, a 70 MW utility-scale test platform powered by NREL's ARIES Virtual Emulation Environment. This deployment-ready technology has successfully demonstrated that Verrus data centers can deliver meaningful grid services while maintaining mission-critical reliability. This technical report outlines the design, methodology, and results of this emulated deployment, demonstrating that data centers can play a pivotal role in enhancing grid flexibility and reliability, without sacrificing service level guarantees.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Demonstrating the data center as a flexible grid asset using a C-HIL setup

Increasing data center demand is outpacing grid infrastructure development. Artificial intelligence workloads and hyperscale cloud growth are creating unprecedented demand for power, while traditional grid expansion faces multiyear development timelines. Verrus is developing an innovative datacenter solution for this challenge, data centers that act as active grid-supportive assets rather than passive loads. Our approach integrates a novel grid-aware power flow management system with battery energy storage systems(BESS) into a microgrid-controlled, medium-voltage power distribution architecture that delivers critical capabilities, such as: * Fast response to grid disturbances such over/ under voltage or over/ under frequency * Demand flexibility that can service requests from the utility within 10 s * Uninterrupted transition to islanded operation during grid outages * Continuous uptime assurance for compute loads while maintaining all customer service level agreements. Through Verrus' strategic partnership with the National Renewable Energy Laboratory (NREL), these capabilities were validated using NREL's Advanced Research on Integrated Energy Systems (ARIES) virtual emulation environment to model a 70-MW grid-interactive data center. This paper outlines the design, methodology, and results of this emulated deployment, demonstrating that data centers can provide both critical load resilience and ancillary grid support without compromising uptime requirements. Specifically, we present a digital real time simulation of a 70 MW data center integrated with a physical microgrid controller, and demonstrate the data center response in the event of a grid voltage and frequency event, utility demand response request and utility outage.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Exploiting CRIC to streamline the configuration management of GlideinWMS factories for CMS support

GlideinWMS is a workload management and provisioning system that allows sharing computing resources distributed over independent sites. Based on the requests made by GlideinWMS frontends, a dynamically sized pool of resources is created by GlideinWMS pilot factories via pilot job submission to resource sites’ CEs. More than 400 CEs are currently serving more than ten virtual organizations through GlideinWMS, with CMS being the biggest user with 230 CEs. The complex configurations of the parameters defining resource requests, as submitted to those CEs, have been historically managed by manually editing a set of different XML files. New possibilities arise with CMS adopting the CRIC, an information system that collects, aggregates, stores, and exposes, among other things, computing resource data coming from various data providers. The paper will describe the challenges faced when CMS started to use CRIC to automatically generate the GlideinWMS factory configurations. The architecture of the prototype, and the ancillary tools developed to ease this transition, will be discussed. Finally, future plans and milestones will be outlined.

Dost, Jeffrey↗