Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Swift Wind Turbine Testing

The purpose of this project was to independently test the Swift wind turbine according to the AWEA Small Wind Turbine Performance and Safety Standard. This project was part of the U.S. Department of Energy’s (DOE’s) Independent Testing project. The project was established to help providers of small wind turbines the opportunity to validate the product to AWEA standards. The National Wind Technology Center (NWTC) conducted testing that included duration, safety and function, power performance, and acoustic. Successful operation of the turbine was confirmed in the results of the testing. Duration requirements were met, there were no safety issues, power performance was established, and the acoustic level was verified to be low compared to other similar turbines. Data results can be assembled and submitted to the Small Wind Certification Council (SWCC) for certification of the turbine to AWEA standards.

17 WIND ENERGY↗

Characterizing the Influence of Abstraction in Full-Scale Wind Turbine Nacelle Testing

In recent years, there has been a growing interest in full-scale wind turbine nacelle testing to complement individual component testing. As a result, several wind turbine nacelle test benches have been built to perform such testing with the intent of loading the integrated components as they are in the field. However, when mounted on a test bench the nacelle is not on the top of a tower and does not have blades attached to it - this is a form of abstraction. This paper aims to quantify the influence of such an abstraction on the dynamic response of the nacelle through a series of simulation case studies. The responses of several nacelle components are studied including the main bearing, main shaft, gearbox supports, generator, and yaw bearing interface. Results are presented to highlight the differences in the dynamic response of the nacelle caused by the abstraction. Additionally, the authors provide recommendations for mitigating the effects of the abstraction.

17 WIND ENERGY↗

Wind Turbine Blade Test Definition of the DeWind DW90 Rotor Blade: Cooperative Research and Development Final Report, CRADA Number CRD-09-326

This CRADA was developed as a funds-in CRADA with DeWind to assess the suitability of facilities and equipment at the NWTC for performing certification blade testing on wind turbine blades made from advanced materials. DeWind produces a wind turbine blade which includes the use of high-strength and stiffness materials. NREL and DeWind had a mutual interest in defining the necessary facilities,equipment, and test methods for testing large wind turbine blades which incorporate advanced materials and adaptive structures, as the demands on test equipment and infrastructure are greater than current capabilities. Work under this CRADA would enable DeWind to verify domestic capability for certification-class static and fatigue testing, while NREL would be able to identify and developspecialized test capabilities based on the test requirements.

17 WIND ENERGY↗

Grid Simulator for Testing a Wind Turbine on Offshore Floating Platform

An important aspect of such offshore testing of a wind turbine floating platform is electrical loading of the wind turbine generator. An option of interconnecting the floating wind turbine with the onshore grid via submarine power cable is limited by many factors such as costs and associated environmental aspects (i.e., an expensive and lengthy sea floor study is needed for cable routing, burial,etc). It appears to be a more cost effective solution to implement a standalone grid simulator on a floating platform itself for electrical loading of the test wind turbine. Such a grid simulator must create a stable fault-resilient voltage and frequency bus (a micro grid) for continuous operation of the test wind turbine. In this report, several electrical topologies for an offshore gridsimulator were analyzed and modeled.

17 WIND ENERGY↗

NWTC Controllable Grid Interface (Fact Sheet)

NREL's Controllable Grid Interface tests wind turbines off-line from the grid, verifies compliance with standards, and provides grid operators with the performance information they need for a faction of the time and cost it would take to test the turbine in the field.

17 WIND ENERGY↗

Duration Test Report for the SWIFT Wind Turbine

This test was conducted as part of the U.S. Department of Energy's (DOE) Independent Testing project. This project was established to help reduce the barriers of wind energy expansion by providing independent testing results for small turbines. Three turbines where selected for testing at the National Wind Technology Center (NWTC) as a part of round two of the Small Wind Turbine Independent Testing project. Duration testing is one of up to 5 tests that may be performed on the turbines. Other tests include power performance, safety and function, noise, and power quality. The results of the testing will provide the manufacturers with reports that may be used for small wind turbine certification.

17 WIND ENERGY↗

Safety and Function Test Report for the SWIFT Wind Turbine

This test was conducted as part of the U.S. Department of Energy's (DOE) Independent Testing project. This project was established to help reduce the barriers of wind energy expansion by providing independent testing results for small turbines. Three turbines where selected for testing at the National Wind Technology Center (NWTC) as a part of round two of the Small Wind Turbine Independent Testing project. Safety and Function testing is one of up to 5 tests that may be performed on the turbines. Other tests include power performance, duration, noise, and power quality. The results of the testing will provide the manufacturers with reports that may be used for small wind turbine certification.

17 WIND ENERGY↗

NREL Wind Turbine Blade Structural Testing of the Modular Wind Energy MW45 Blade: Cooperative Research and Development Final Report, CRADA Number CRD-09-354

This CRADA was a purely funds-in CRADA with Modular Wind Energy (MWE). MWE had a need to perform full-scale testing of a 45-m wind turbine blade. NREL/NWTC provided the capabilities, facilities, and equipment to test this large-scale MWE wind turbine blade. Full-scale testing is required to demonstrate the ability of the wind turbine blade to withstand static design load cases and demonstrate thefatigue durability. Structural testing is also necessary to meet international blade testing certification requirements. Through this CRADA, MWE would obtain test results necessary for product development and certification, and NREL would benefit by working with an industrial partner to better understand the unique test requirements for wind turbine blades with advanced structural designs.

17 WIND ENERGY↗

Wind Turbine Generator System Acoustic Noise Test Report for the Gaia Wind 11-kW Wind Turbine

This report details the acoustic noise test conducted on the Gaia-Wind 11-kW wind turbine at the National Wind Technology Center. The test turbine is a two- bladed, downwind wind turbine with a rated power of 11 kW. The test turbine was tested in accordance with the International Electrotechnical Commission standard, IEC 61400-11 Ed 2.1 2006-11 Wind Turbine Generator Systems -- Part 11 AcousticNoise Measurement Techniques.

17 WIND ENERGY↗

First International Workshop on Grid Simulator Testing of Wind Turbine Drivetrains: Workshop Proceedings

This report summarizes the proceedings of the First International Workshop on Grid Simulator Testing of Wind Turbine Drivetrains, held from June 13 to 14, 2013, at the National Renewable Energy Laboratory's National Wind Technology Center, located south of Boulder, Colorado. The workshop was sponsored by the U.S. Department of Energy and cohosted by the National Renewable Energy Laboratory and Clemson University under ongoing collaboration via a cooperative research and development agreement. The purpose of the workshop was to provide a forum to discuss the research, testing needs, and state-of-the-art apparatuses involved in grid compliance testing of utility-scale wind turbine generators. This includes both dynamometer testing of wind turbine drivetrains ('ground testing') and field testing grid-connected wind turbines. Four sessions followed by discussions in which all attendees of the workshop were encouraged to participate comprised the workshop.

17 WIND ENERGY↗

Safety and Function Test Report for the Viryd CS8 Wind Turbine

This test was conducted as part of the U.S. Department of Energy's (DOE) Independent Testing project. This project was established to help reduce the barriers of wind energy expansion by providing independent testing results for small turbines. Several turbines were selected for testing at the National Wind Technology Center (NWTC) at the National Renewable Energy Laboratory (NREL) as a part of the Small Wind Turbine Independent Testing project. Safety and function testing is one of up to five tests that may be performed on the turbines. Other tests include duration, power performance, acoustic noise, and power quality. Viryd Technologies, Inc. of Austin, Texas, was the recipient of the DOE grant and provided the turbine for testing.

17 WIND ENERGY↗

IFT&E Industry Report: Wind Turbine-Radar Interference Test Summary

Wind turbines have grown in size and capacity with today's average turbine having a power capacity of around 1.9 MW, reaching to heights of over 495 feet from ground to blade tip, and operating with speeds at the tip of the blade up to 200 knots. When these machines are installed within the line-of-sight of a radar system, they can cause significant clutter and interference, detrimentally impacting the primary surveillance radar (PSR) performance. The Massachusetts Institute of Technology's Lincoln Laboratory (MIT LL) and Sandia National Laboratories (SNL) were co-funded to conduct field tests and evaluations over two years in order to: I. Characterize the impact of wind turbines on existing Program-of-Record (POR) air surveillance radars; II. Assess near-term technologies proposed by industry that have the potential to mitigate the interference from wind turbines on radar systems; and III. Collect data and increase technical understanding of interference issues to advance development of long-term mitigation strategies. MIT LL and SNL managed the tests and evaluated resulting data from three flight campaigns to test eight mitigation technologies on terminal (short) and long-range (60 nmi and 250 nmi) radar systems. Combined across the three flight campaigns, more than 460 of hours of flight time were logged. This paper summarizes the Interagency Field Test & Evaluation (IFT&E) program and publicly- available results from the tests. It will also discuss the current wind turbine-radar interference evaluation process within the government and a proposed process to deploy mitigation technologies.

Karlson, Benjamin↗

Clemson University Wind Turbine Drivetrain Test Facility

In November of 2009, Clemson University was awarded a competitive grant from the U.S. Department of Energy to design, build and operate a facility for full-scale, highly accelerated mechanical testing of next-generation wind turbine drivetrain technologies. The primary goal of the project was to design, construct, commission, and operate a state-of-the-art sustainable facility that permits full-scale highly accelerated testing of advanced drivetrain systems for large wind turbines. The secondary goal was to meet the objectives of the American Recovery and Reinvestment Act of 2009, especially in job creation, and provide a positive impact on economically distressed areas in the United States, and preservation and economic recovery in an expeditious manner. The project was executed according to a managed cooperative agreement with the Department of Energy and was an extraordinary success. The resultant new facility is located in North Charleston, SC, providing easy transportation access by rail, road or ship and operates on an open access model such that it is available to the U.S. Wind Industry for research, analysis, and evaluation activities. The 72 m by 97 m facility features two mechanical dynamometer test bays for evaluating the torque and blade dynamic forces experienced by the rotors of wind turbine drivetrains. The dynamometers are rated at 7.5 MW and 15 MW of low speed shaft power and are configured as independent test areas capable of simultaneous operation. All six degrees of freedom, three linear and three rotational, for blade and rotor dynamics are replicated through the combination of a drive motor, speed reduction gearbox and a controllable hydraulic load application unit (LAU). This new LAU setup readily supports accelerated lifetime mechanical testing and load analysis for the entire drivetrain system of the nacelle and easily simulates a wide variety of realistic operating scenarios in a controlled laboratory environment. The development of these two dynamometer test rigs is the first significant achievement for the project. These test rigs embody a new manner of test due to the system configuration and completely new design with a free floating loading hub in the LAU. This project provided the catalyst for the advancement to this new test rig configuration that has been adopted by every significant wind turbine test rig constructed since the inception of this project. There are currently two different vendors supplying these new systems. Catalyzing this new design is the second major success of the project. With the increased market penetration of wind energy over the past decade, many regions and countries have developed specific electrical grid specifications and performance codes for large wind farms to ensure operational reliability and stability. These grid codes provide requirements for interconnection with the grid during low or high voltage phenomena, typically encountered during and after system fault events. Given the installed infrastructure of the Wind Turbine Drivetrain Testing Facility (WTDTF), a natural expansion of facility capability was to include the necessary equipment for performing fault ride-through evaluations of wind turbines to the Low Voltage Ride Through (LVRT) codes. Once the decision was made to expand the scope of the original grant into fault ride-through testing, it was clear that there are several markets, not just wind, which could benefit from this type of test and that simple fault ride-through testing could be extended into a broader scope of electrical testing capabilities. It was at this point that Clemson University was awarded a second grant to build a 15 MW Hardware-In-the-Loop (HIL) Grid Simulator in order to establish world class electrical testing capabilities to compliment the mechanical testing at the WTDTF. This third significant achievement resulted in the 15 MW HIL Grid Simulator as the corner stone of the Duke Energy eGRID Center and is collocated with the WTDTF in the SCE&G Energy Innovation Center at the new Facility in North Charleston, SC, USA. Before the eGRID was completed, it was recognized that the ability to test solar farm equipment was but a small step away thru the addition of enhanced equipment to provide for DC testing. In yet another expansion/success, a 2.5 MW rectifier system was designed and implemented by Clemson staff to enhance the Center’s capabilities. The program required over 250,000 man-hours of on-site construction labor reworking the brownfield facility on the former Navy Base, clearly satisfying one of the major goals of the Reinvestment Act. This was done while winning numerous awards for design and construction of the facility, including the Top US Project for 2014 from the Trade Journal Engineering News Record. The project was a major collaborative developmental activity managed by Clemson University staff that involved the DOE and many partners and organizations.