Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “wec”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Review of TEAMER Awards for WEC-Sim Support: Preprint

Testing Expertise and Access for Marine Energy Research (TEAMER) is a U.S. Department of Energy Water Power Technologies Office sponsored program, overseen by the Pacific Ocean Energy Trust, which aims to advance the state of marine energy technologies. The program connects technology developers with experts at U.S. facilities, including numerical modeling and analysis facilities, like WEC-Sim. The WEC-Sim facility is supported by the WEC-Sim development team at Sandia National Laboratories and the National Renewable Energy Laboratory. WEC-Sim (Wave Energy Converter SIMulator) is an open-source software for simulating wave energy converters. WEC-Sim can model the multi-body dynamics of devices comprised of bodies, joints, power take-off systems, and mooring systems. Since TEAMER's first round of support in 2020, there have been eighteen TEAMER awards focused on numerical model development in WEC-Sim. TEAMER awards for WEC-Sim support have modeled a wide range of wave energy converter archetypes, including point absorbers, attenuators, oscillating water columns, and many other novel architectures. A wide variety of studies have been conducted, leading to important insights for TEAMER partners and software improvements for WECSim. This article highlights several successful WEC-Sim TEAMER awards. The awards described herein include TEAMER recipients Ocean Motion Technologies, AquaHarmonics, iProTech, East Carolina University, Virginia Tech, Maiden Wave Energy, and the University of Massachusetts Dartmouth. The awards of these seven partners contain a wide range of investigations and cover the creation of baseline hydrodynamic models, PTO modeling, geometry optimization in both boundary element methods and WECSim, and model tuning and validation.

industry support↗

HERO WEC - Bills of Materials: WEC, RO System, and Submersible Pump

This submission includes detailed Bills of Materials for the NREL-designed and -built Hydraulic and Electric Reverse Osmosis Wave Energy Converter (HERO WEC), as well as the reverse osmosis assembly and submersible pump that are used in the HERO WEC. The WEC file is specific to the components and sub-components that are included on the in-water buoy portion of the WEC. The RO file is specific to the components and sub-components that are included on the reverse osmosis module that is used for both the hydraulic and electric configuration. The submersible pumps file is specific to the components and sub-components that are included on the submersible pump module that is used feed the reverse osmosis module when the HERO WEC is in the electric configuration. In addition to this submission, an additional submission available for the WEC model itself, including the power electronics enclosure, and reverse osmosis assembly that is needed to supply water in the electric submission. A link is provided below. More details on this project including data, CAD drawings, etc. can be found in the HERO-WEC main page link below. This data set has been developed by the National Renewable Energy Laboratory, operated by Alliance for Sustainable Energy, LLC, for the U.S. Department of Energy (DOE) under Contract No. DE-AC36-08GO28308. Funding provided U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Water Power Technologies Office.

16 TIDAL AND WAVE POWER↗

HERO WEC V1 Upgrades - SolidWorks Models (WEC, RO System, and Submersible Pump Housing)

The attached zip files include SolidWorks pack-and-go assemblies of NREL's HERO WEC (hydraulic and electric reverse osmosis wave energy converter), the reverse osmosis (RO) assembly, and the submersible pump assembly that is used to provide flow to the RO assembly in the electric configuration. These 3 models were upgraded in 2023 from their baseline models. The HERO WEC model does not include all aspects of the design (i.e. RO system, electrical enclosure, hose, cable), it only includes the WEC and PTO (power take-off) design. This model supersedes the old MHKDR model submission, linked below. The RO model file includes a SolidWorks (version 2023) pack-and-go assembly of the RO assembly that was used for HERO WEC as it was upgraded in 2023. This model ONLY includes the RO assembly and not the WEC, hoses, etc. The submersible pump enclosure model includes a SolidWorks (version 2023) pack-and-go assembly of the submersible pump assembly that is used to provide flow to the RO assembly in the electric configuration HERO WECas it was upgraded in 2023. This model ONLY includes the submersible pump assembly and not the WEC, RO system, hoses, etc. This work has been developed by the National Renewable Energy Laboratory, operated by Alliance for Sustainable Energy, LLC, for the U.S. Department of Energy (DOE) under Contract No. DE-AC36-08GO28308. Funding provided U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Water Power Technologies Office.

16 TIDAL AND WAVE POWER↗

HERO WEC V1.0 - WEC-Sim Model (July 2024)

**This submission supersedes submission MHKDR-483** This submission file contains the files that are needed to simulate NREL's HERO WEC (hydraulic and electric reverse osmosis wave energy converter). This requires the user to have already installed WEC-Sim. In addition to the standard toolboxes that are required to run WEC-Sim the user will also need the Simscape Fluids and Simscape Driveline packages. The zip file (HERO_V1_WECSim_2024.zip) contains the following: - HERO_HPTO_2024.slx: Simulink-based WEC Sim model of the first gen (V1.0) Hydraulic PTO (power take-off) that was designed for the HERO WEC. This model has been updated since submission #483 based on in-laboratory experimental results. - wecSimInputFile.m: Input file needed to run the model - userDefinedFunctionsMCR.m: MCR (multi condition run) script that is needed if a use wants to simulate multiple wave conditions. - geometry (folder): Includes the geometry file that is needed for visualization - hydroData (folder): Includes the required WAMIT data to run WEC-Sim -HydVisualization.mlx: Visualization script to plot simulation results (not needed to run)

16 TIDAL AND WAVE POWER↗

HERO WEC V1.0 2024 - WEC-Sim Detailed Simulation Runs and Summary Data

This dataset includes results from simulations of NREL's hydraulic and electric reverse osmosis wave energy converter (HEREO WEC). Simulation runs include 135 wave cases that were based on the updated WEC-Sim model, which is linked below. The data represented in this repository is based on an updated WEC-Sim model using laboratory data to tune and refine the original WEC-Sim model for the V1.0 HERO WEC. The 135 wave cases represent waves with the following wave height and wave period ranges: - Significant Wave Height: 0.25 - 3.75m in 0.25m increments - Wave Period: 5 - 13 sec in 1 sec increments Each run was simulated using a Pierson-Moskowitz irregular wave spectrum with a 100 second ramp time, a total simulation time of 3,100 seconds, and a simulation time-step of 0.005s. A reference table has been included to map each multi condition run (MCR) case with each wave condition. Summary data set includes a spreadsheet and image files with matrices that are associated with data from simulation runs. All matrices cover the same significant wave height and wave periods from the simulation runs, in the same increments. The following matrices are included: - Power Abs: The average absorbed power from the WEC (calculated from anchor reaction force and heave velocity) - Power Hyd: The average hydraulic power output at pump (calculated from pump output flow and pressure) - Power - Hyd ROi: The average hydraulic power measured at the RO system inlet (calculated from RO system pressure and flow (pre-accumulator)) - Flow - Pump out: The average flowrate measured at the pump outlet - Flow - Perm: The average permeate (clean water) production - Flow - RO (pre): The average flowrate measured at the inlet of the RO system before the accumulators - Flow - RO (post): The average flowrate measured after the accumulator bank in the RO system - Pressure - RO: The average pressure measured at the inlet of the RO system This data set has been developed by the National Renewable Energy Laboratory, operated by the Alliance for Sustainable Energy, LLC, for the U.S. Department of Energy (DOE) under Contract No. DE-AC36-08GO28308. Funding provided by the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Water Power Technologies Office.

16 TIDAL AND WAVE POWER↗

HERO WEC V1.0 - WEC-Sim Model

This zip file contains the files that are needed to simulate NREL's HERO WEC (hydraulic and electric reverse osmosis wave energy converter). This requires the user to have already installed WEC-Sim. In addition to the standard toolboxes that are required to run WEC-Sim the user will also need the Simscape Fluids and Simscape Driveline packages. In the zip file you will find the following: - HEROV1_HPTO.slx: Simulink-based WEC Sim model of the first gen (V1.0) Hydraulic PTO (power take-off) that was designed for the HERO WEC - wecSimInputFile.m: Input file needed to run the model - userDefinedFunctionsMCR.m: MCR (multi condition run) script that is needed if a use wants to simulate multiple wave conditions. - geometry (folder): Includes the geometry file that is needed for visualization - hydroData (folder): Includes the required WAMIT data to run WEC-Sim

16 TIDAL AND WAVE POWER↗

Pioneer WEC concept design report

The "Pioneer WEC" project is targeted at developing a wave energy generator for the Coastal Surface Mooring (CSM) system within the Ocean Observatories Initiative (OOI) Pioneer Array. The CSM utilizes solar photovoltaic and wind generation systems, along with rechargeable batteries, to power multiple sensors on the buoy and along the mooring line. This approach provides continuous power for essential controller functions and a subset of instruments, and meets the full power demand roughly 70% of the time. Sandia has been tasked with designing a wave energy system to provide additional electrical power and bring the CSM up-time for satisfying the full-power demand to 100%. This project is a collaboration between Sandia and Woods Hole Oceanographic Institution (WHOI), along with Evergreen Innovations, Monterey Bay Aquarium Research Institute (MBARI), Eastern Carolina University (ECU), Johns Hopkins University (JHU), and the National Renewable Energy Laboratory (NREL). This report captures Phase I of an expected two phase project and presents project scoping and concept design results.

16 TIDAL AND WAVE POWER↗

HERO WEC V1.0 - WEC-Sim Detailed Simulation Runs and Summary Data

Data sets from simulation runs include 144 wave cases that were run based on the WEC-Sim model (https://mhkdr.openei.org/submissions/483). The 144 wave cases represent waves with the following wave height and wave period ranges: - Significant Wave Height: 0.25 - 4.0m in 0.25m increments - Wave Period: 5 - 13 sec in 1 sec increments Each run was simulated using a Pierson-Moskowitz irregular wave spectrum with a 200 second ramp time and a total simulation time of 2,200 seconds. Summary data set includes a spreadsheet and image files with matrices that are associated with data from simulation runs. All matrices cover the same significant wave height and wave periods from the sim runs, in the same increments. The following matrices are included: - Mechanical Power Input: Absorbed power calculated using linear input velocity at PTO (power take-off) multiplied by winch tension. - Mechanical Power Output: The hydraulic power calculated at the pump output prior to the pressure relief valve dump. - Feed Pressure: Average pressure at RO (reverse osmosis) input prior to pre-filters - RO Power Input: The hydraulic power calculated at the RO system inlet, accounts for flow loss due to pressure relief valve - Water Production: Average clean water flow at RO output

16 TIDAL AND WAVE POWER↗

New Developments and Capabilities Within WEC-Sim

WEC-Sim is an open-source software for simulating wave energy converters and has been actively developed and applied since its initial release in 2014 to simulate a wide variety of device archetypes. WEC-Sim is developed jointly by the National Renewable Energy Laboratory and Sandia National Laboratories within the MATLAB/SIMULINK environment. A general wave-to-wire model begins with a deployment site resource characterization, which is used to complete the hydrodynamic simulation of wave energy converters (WEC), with the power generation profile imported to a grid simulator to understand the influence on the local electrical network. While modeling the entire wave-to-wire is difficult and encompasses multiple time scales and physics, WEC-Sim is focused on the hydrodynamics simulation to predict, analyze, and optimize WEC dynamics and power performance. WEC-Sim simulations are performed in the time domain based on the radiation and diffraction method using hydrodynamics coefficients derived from boundary element method (BEM)-based frequency-domain potential flow solvers (e.g., WAMIT, NEMOH, Capytaine, or ANSYS-AQWA). With this level of modeling fidelity, WEC-Sim can handle floating body hydrodynamics, mechanical and electrical power generation methods, advanced control implementation, mooring systems, and other unique applications such as desalination. Additional WEC-Sim functionalities include pre-built Simulink blocks and MATLAB scripts that can simulate a wide range of floating systems and the corresponding auxiliary subsystems. The developers of WEC-Sim continue to release new versions of the software, at least annually, with the latest release in September 2022. These releases include bug fixes, updates to software documentation, as well as new features to expand WEC-Sim's capabilities to model a wide range of WEC concepts. This publication will highlight the new features added to WEC-Sim between versions 4.1.0 to 5.0.1, which spans a 2-year period from June 2020 to September 2022. New features described here include topics such as continuous integration checks, revised Morison Element and nonlinear hydro implementations, run directly from Simulink (required for hardware-in-the-loop execution), BEMIO updates to import Capytaine BEM hydrodynamics, addition of cable blocks, and new wave visualization features.

TIDAL AND WAVE POWER↗

New Developments and Capabilities Within WEC-Sim: Preprint

WEC-Sim is an open-source software for simulating wave energy converters, which has been actively developed and applied since its initial release in 2014 to simulate a wide variety of device archetypes. WEC-Sim is developed jointly by the National Renewable Energy Laboratory (NREL) and Sandia National Laboratories (Sandia) within the MATLAB/SIMULINK environment. A general wave-to-wire model begins with a deployment site resource characterization, which is used to complete the hydrodynamic simulation of wave energy converters (WEC), with the power generation profile imported to a grid simulator to understand the influence on the local electrical network. While modeling the entire wave-to-wire is difficult and encompasses multiple time scales and physics, WEC-Sim is focused on the hydrodynamics simulation to predict, analyze, and optimize WEC dynamics and power performance. WEC-Sim simulations are performed in the time domain based on the radiation and diffraction method using hydrodynamics coefficients derived from boundary element method (BEM)-based frequency-domain potential flow solvers (e.g., WAMIT, NEMOH, Capytaine, or ANSYS-AQWA). With this level of modeling fidelity, WEC-Sim can handle floating body hydrodynamics, mechanical and electrical power generation methods, advanced control implementation, mooring systems, and other unique applications such as desalination. Additional WEC-Sim functionalities include pre-built Simulink blocks and MATLAB scripts that can simulate a wide range of floating systems and the corresponding auxiliary subsystems. The developers of WEC-Sim continue to release new versions of the software, at least annually, with our latest release in September 2022. These releases include bug fixes, updates to software documentation, as well as new features to expand WEC-Sim's capabilities to model a wide range of WEC concepts. This publication will highlight the new features added to WEC-Sim between versions 4.1.0 to 5.0.1 which spans over a two year period from June 2020 to September 2022. New features to be described will include topics such as continuous integration checks, revised Morison Element and nonlinear hydro implementations, run directly from Simulink (required for hardware-in-the-loop execution), BEMIO updates to import Capytaine BEM hydrodynamics, addition of cable blocks, and new wave visualization features.

TIDAL AND WAVE POWER↗

Co-Located Wave Energy Converter (WEC) and Aquaculture System Annotated Bibliography

This annotated bibliography includes references that could aid in the design of a co-located WEC and aquaculture system off the coast of Guam. The breadth of this work covers multiple co-location archetypes such as: 1. WEC seawater desalination system a) Nearshore and deepwater WEC deployment b) Onshore and offshore aquaculture 2. WEC powering an offshore aquaculture platform a) Nearshore or deepwater WEC deployment 3. WEC powering an onshore aquaculture system a) Nearshore WEC deployment 4. Wave powered seawater pump a) Nearshore WEC deployment b) Onshore aquaculture There are two archetypes that may be of immediate interest to the community in Guam are to service the existing Fadian Hatchery (Mangilao) and to support freshwater aquaculture activities. First, the seawater pump at the hatchery that fills the facility’s seawater storage unit is broken. A nearshore seawater pumping WEC could be a solution to this issue. In addition, due to the high frequency of typhoons/extreme conditions and the island’s bathymetry, the likelihood of community support for an offshore aquaculture platform or WEC deployed in deepwater is low. Proactive and resilient solutions not just for power, but for freshwater are of interest as well to support any freshwater aquaculture activities. Therefore, a nearshore WEC desalination system is another archetype to consider.

16 TIDAL AND WAVE POWER↗

Recent Developments in the WEC-Sim Open-Source Design Tool: Preprint

WEC-Sim (Wave Energy Converter SIMulator) is an open-source code for simulating wave energy converters, which has been actively developed and applied to simulate a wide variety of device archetypes and has become a popular tool since its initial release in 2014. WEC-Sim is developed jointly by the National Renewable Energy Laboratory (NREL) and Sandia National Laboratories (SNL) within the MATLAB/SIMULINK environment. Figure 1 illustrates a general wave-to-wire model which begins with a deployment site resource characterization, which is used to complete the hydrodynamic simulation of a single WEC (or array), with the power generation profile imported to a grid simulator to understand the influence on the local electrical network. While modelling the entire wave-to-wire is difficult and encompass multiple time scales and physics, WEC-Sim is focused on the hydrodynamics simulation to predict, analyze and optimize WEC dynamics and power performance. WEC-Sim simulations are performed in the time domain based on the radiation and diffraction method using hydrodynamics coefficients derived from boundary element method (BEM) based-frequency-domain potential flow solvers (e.g., WAMIT, NEMOH, Capytaine, or ANSYS-AQWA). Within this level of modeling fidelity, WEC-Sim can handle floating body hydrodynamics, mechanical and electrical power generation methods, advanced control implementation, mooring systems, and other unique applications such as desalination. Table 1 lists additional WEC-Sim functionalities, which are created using prebuilt Simulink blocks and MATLAB scripts that can simulate a wide range of floating systems and the corresponding auxiliary subsystems.

hydrodynamics modeling↗

TEAMER - AquaHarmonics High Fidelity WEC Sim PTO and Control Model Validation, Sim Model

Collaborative effort between AquaHarmonics, Sandia National Laboratories (SNL), and the National Renewable Energy Laboratory (NREL) to revise and validate Aquaharmonics' full wave to wire model, allowing for reduced uncertainty and increased understanding of design requirements of a utility scale wave energy converter (WEC). SNL and NREL in collaboration with AquaHarmonics, will set up and run WEC Simulator (WEC-Sim) models of the AquaHarmonics WEC, building off past model developments for inclusion of custom PTO (power take-off) dynamics. The intent is to review, update, and verify or validate a new WEC-Sim model against wave tank experimental data. Furthermore, the WEC-Sim model will be coupled to an energy storage system model to better understand the wave-to-wire functionality. Project is part of the TEAMER (Testing & Expertise for Marine Energy) RFTS (request for technical support) system of WEC research projects. Testing data can be found in the associated MHKDR link below.

16 TIDAL AND WAVE POWER↗

Wave resource spatial and temporal variability dependence on WEC size

As the wave energy sector grows and looks to the Blue Economy for commercialization opportunities, there is a distinct and pressing need to clearly understand and quantify the coupled impacts of wave energy converter (WEC) size and wave resource characteristics on the annual energy production, spatial variability and temporal variability. Utilizing generic frequency domain representations of the Oscilla Power Triton WEC and spectral wave conditions at PacWave (Oregon), Los Angeles (California) and WETS (Hawaii), a series of interesting results emerge. Firstly, the ‘optimal’ WEC size, from an energy standpoint, is fundamentally dependent on the frequency distribution of the incoming wave variance density spectrum. Secondly, and from a seasonality perspective, the seasonal WEC energy generation doesn’t necessarily follow the seasonal distribution of gross wave power. Finally, from an hourly power variability perspective, a reduction in WEC size generally decreases variability. However, for each of the locations investigated, there appears to be a WEC size threshold; a threshold where further reducing WEC size results in increased power variability.

16 TIDAL AND WAVE POWER↗

Wave Resource Spatial and Temporal Variability Dependence on WEC Size

As the wave energy sector grows and looks to the Blue Economy for commercialization opportunities, there is a distinct and pressing need to clearly understand and quantify the coupled impacts of wave energy converter (WEC) size and wave resource characteristics on the annual energy production, spatial variability and temporal variability. Utilizing generic frequency domain representations of the Oscilla Power Triton WEC and spectral wave conditions at PacWave (Oregon), Los Angeles (California) and WETS (Hawaii), a series of interesting results emerge. Firstly, the 'optimal' WEC size, from an energy standpoint, is fundamentally dependent on the frequency distribution of the incoming wave variance density spectrum. Secondly, and from a seasonality perspective, the seasonal WEC energy generation doesn't necessarily follow the seasonal distribution of gross wave power. Finally, from an hourly power variability perspective, a reduction in WEC size generally decreases variability. However, for each of the locations investigated, there appears to be a WEC size threshold; a threshold where further reducing WEC size results in increased power variability.

blue economy↗

2.1.3.404 - WEC Array Power Management and Output Simulation Tool

An array of wave energy converter (WEC) devices has variations in power output due to the chaotic nature of the waves. Eliminating or mitigating the power fluctuations is important for reducing the integration impacts of WEC plants in both distribution and transmission grids, and in standalone isolated power systems. Reduced variability of WEC-generated power in combination with energy storage or power management control at each WEC and at the array level will help increasing hosting capacity of distribution feeders for this type of variable renewable generation, and minimization of electric losses. To reduce risks and risk perception, gain key stakeholder acceptance, and enable developers to design effective and compatible energy plants with arrays of WEC devices, it requires the use of modeling tools to simulate the resource environment, device dynamics, utility power system response, as well as the development of an interface for an array controller. The project will create a publicly accessible numerical modeling framework to empower the wave energy sector to design projects of various scales (kW-100s MW), which are optimized on a plant performance basis and are compatible with different power systems and wave conditions. The framework will integrate with WEC-Sim, a wave environment model (SWAN-FUNWAVE), as well as established relevant electrical analysis tools, to model the grid system and interconnection, and optimize power output and power management for the WEC array.

POWER TRANSMISSION AND DISTRIBUTION,TIDAL AND WAVE↗

Numerical Model of IProTech PIP WEC Device

iProTech PIP wave energy converter (WEC) is a slack moored, single hull device with no moving parts in the water, joints or bearings. This submission includes data of the simulation, reports, and code for the iProTech PIP (WEC) project. The organization of the data included in the provided archive is detailed below and in the data description of the archive. The data teamer-iprotech-nrel folder includes and explains matlab and python code developed to hydrodynamically model the PIP WEC device in WEC-Sim. The subfolders cover the following steps: 1) report: explanatory information on device geometry 2) pip_mesher: python code to generate mesh panels from device profile data 3) wec-sim_models: matlab code to run WEC-Sim The data uploaded is a snapshot as of 11/02/2121 of code residing in a Github repository administered by David Ogden of NREL.

16 TIDAL AND WAVE POWER↗

TEAMER: Numerical Modeling and Optimization of the iProTech Pitching Inertial Pump (PIP) Wave Energy Converter (WEC)

This project focused on developing an automated workflow to evaluate and optimize the iProTech Pitching Inertial Pump (PIP) wave energy converter (WEC) using open-source Python packages and the MATLAB/Simulink tool, WEC-Sim. The process involved parameterizing key design variables, running time-domain simulations, and performing sensitivity analyses to determine their impact on power output. The workflow, designed for the PIP device, is generalized and can be extended to optimize other WECs that can be simulated in WEC-Sim. This work establishes a foundation for future time-domain-based WEC design optimizations. Included in this submission are all figures from the final report and the model inputs required to generate them. This includes Python scripts with inputs that produce the meshes, boundary element method (BEM) models, hydrodynamic coefficients, and the WEC-Sim models used for time-domain analyses. Although data for every single run is not included to save space, all of it can be reproduced using the provided models. Detailed instructions for setting up the environment and running the codes are also included.

16 TIDAL AND WAVE POWER↗