Expedited desalination permitting enables adaptive planning and water system cost reduction

Seawater desalination is a drought-proof water supply for coastal cities, but widespread development of desalination plants in the U.S. has been limited by both cost and the complexity of permitting processes designed to minimize environmental impact . This work estimates the value of accelerating the permitting timeline without changing environmental or social standards. On average, faster permitting reduces the frequency of desalination plant construction and operation, the overall costs of robust water system operation, the environmental impacts of drought-tolerant water supplies due to shorter duration of plant operation. Expedited permitting allows fundamental changes in how water infrastructure is deployed, facilitating a transition from anticipatory construction and continuous operation of seawater desalination capacity as a redundant drought buffer to just-in-time (i.e. adaptive) deployment of seawater desalination capacity when critical drought thresholds are crossed. We demonstrate the value of expedited desalination permitting in enabling adaptive planning and reducing water system costs using a simple case study in Santa Barbara, CA. We discuss additional forms of adaptive water infrastructure planning as enabled by faster permitting and address their challenges and opportunities. Lastly, we identify synergies between innovation in adaptive planning, innovation in expedited permitting practices, and innovation in water technology.

adaptive planning

Sensor assemblies and methods for emulating interaction of entities within water systems

Methods for emulating interaction of entities within water systems are provided. The methods can include introducing a sensor assembly into a water system. The sensor assembly can include: a circuit board supporting processing circuitry components on either or both of opposing component support surfaces of the circuit board; a housing about the circuit board and the components, the housing being circular about the circuit board in at least one cross section; and wherein the support surfaces of the circuit board are substantially parallel with the plane of the housing in the one cross section.

Deng, Z. Daniel

Machine Learning–Based Condition Monitoring of a Circulating Water System of a Canadian Nuclear Plant

With the need to maintain long-term reliable energy using nuclear power plants, there is an underlying demand to ensure that the maintenance of plant components and systems is also done in an efficient and cost-effective manner. One way to achieve this is by moving from time-based maintenance to condition-based maintenance. The research presented in this paper focuses on applying statistical and machine-learning-based methods to capture anomalies within data for fault detection to further develop into condition monitoring. This paper focuses on system data for a circulating water system (CWS) of a pressurized heavy-water reactor for detecting anomalies. The different methodologies used for detecting and capturing anomalies in the CWS data are matrix profile, density-based spatial clustering of applications with noise (DBSCAN), and support vector machines (SVMs). Matrix profile and DBSCAN are used to distinguish between normal data and anomalous data. This paper presents a hybrid method using DBSCAN and SVM when a portion of the data is used for DBSCAN to generate clusters. This portion of data is then used to train the SVM along with the clusters generated by DBSCAN as output. SVM is then tested on unseen data as a predictive tool, which can work in real time to categorize data points as either normal or anomalous. This paper presents results that show the high accuracies of DBSCAN and SVM in capturing anomalies within the data for a CWS for fault detection. Thus, the maintenance plan would be focused on component condition rather than a time-based schedule by switching to an automated system to identify and predict faults within a CWS.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS

Climate change and its influence on water systems increases the cost of electricity system decarbonization

The electric sector simultaneously faces two challenges: decarbonization to mitigate, and adaptation to manage, the impacts of climate change. In many regions, these challenges are compounded by an interdependence of electricity and water systems, with water needed for hydropower generation and electricity for water provision. Here, we couple detailed water and electricity system models to evaluate how the Western Interconnection grid can both adapt to climate change and develop carbon-free generation by 2050, while accounting for interactions and climate vulnerabilities of the water sector. We find that by 2050, due to climate change, annual regional electricity use could grow by up to 2% from cooling and water-related electricity demand, while total annual hydropower generation could decrease by up to 23%. To adapt, we show that the region may need to build up to 139 GW of additional generating capacity between 2030 and 2050, equivalent to nearly thrice California's peak demand, and could incur up to $\$$150 billion (+7%) in extra costs.

13 HYDRO ENERGY

Tritium Production Estimates in EIC Cooling Water Systems

Annual tritium production in EIC cooling water has been estimated in one sextant cooling system from expected electron beam and proton beam losses in the tunnel. Beam losses and the secondary particles they produce are the only source within the RHIC Tunnel for producing radioactivity in cooling water, including tritium. The need to estimate tritium production supports decisions on whether cooling water systems are required to meet Suffolk County Article 12 requirements (e.g., double-walled piping, leak detection and containment, etc.). Results are extended to the remaining sextant cooling water systems because of the similarity in tunnel cooling water loads and system volumes.

43 PARTICLE ACCELERATORS

Exploring Water System Vulnerabilities in California's Central Valley Under the Late Renaissance Megadrought and Climate Change

Abstract California faces cycles of drought and flooding that are projected to intensify, but these extremes may impact water users across the state differently due to the region's natural hydroclimate variability and complex institutional framework governing water deliveries. To assess these risks, this study introduces a novel exploratory modeling framework informed by paleo and climate‐change based scenarios to better understand how impacts propagate through the Central Valley's complex water system. A stochastic weather generator, conditioned on tree‐ring data, produces a large ensemble of daily weather sequences conditioned on drought and flood conditions under the Late Renaissance Megadrought period (1550–1580 CE). Regional climate changes are applied to this weather data and drive hydrologic projections for the Sacramento, San Joaquin, and Tulare Basins. The resulting streamflow ensembles are used in an exploratory stress test using the California Food‐Energy‐Water System model, a highly resolved, daily model of water storage and conveyance throughout California's Central Valley. Results show that megadrought conditions lead to unprecedented reductions in inflows and storage at major California reservoirs. Both junior and senior water rights holders experience multi‐year periods of curtailed water deliveries and complete drawdowns of groundwater assets. When megadrought dynamics are combined with climate change, risks for unprecedented depletion of reservoir storage and sustained curtailment of water deliveries across multiple years increase. Asymmetries in risk emerge depending on water source, rights, and access to groundwater banks.

Gupta, Rohini S. [School of Civil and Environmenta

Using a Large Language Model for Accurate Technical Language Generation in the Predictive Maintenance of Circulating Water Systems in Nuclear Power Plants

Machine learning (ML) methods for predictive maintenance (PdM) are emerging as effective proactive strategies for diagnosing equipment degradation and enabling effective decision-making. However, explainability and trustworthiness of artificial intelligence are two salient challenges that need to be addressed for wider deployment of these technologies in nuclear power plants (NPPs). Large language models (LLMs) offer a unique approach to tackle these challenges by explaining PdM, work orders, diagnosis results, and ML algorithms to users, who may not be familiar with ML and PdM in general. Moreover, by dynamically retrieving relevant information from technical documents and evaluating factuality of LLM generation, the accuracy and relevance of LLM generations can be improved. This work demonstrates using LLMs to explain the causes and consequences of circulating water system failures based on multiyear NPP work orders. This work tests the capability of multimodal LLM approaches in explaining the differences in the circulating water system from both the Salem and Hope Creek NPPs using both text and image resources. This work also demonstrates the use of multimodal LLMs in describing the diagnosis tab of a predictive maintenance software named VIsualization for PrEdictive maintenance Recommendation (VIPER) to users.

22 - GENERAL STUDIES OF NUCLEAR REACTORS

Cost estimation of balance of plant equipment scale up for proton exchange membrane water electrolyzer systems

Water electrolyzers that use electricity to split water into hydrogen and oxygen could be a key technology for increasing hydrogen supply to meet expanded and emerging market applications, although currently the capital costs of these electrolyzers are high. Here we examine cost reductions that might be achieved by scaling up proton exchange membrane (PEM) electrolyzer systems and leveraging economies of scale through balance of plant (BOP) components for system sizes between 1 MW and 1 GW. We estimate BOP equipment capital costs of about $\$$848/kW at 1 MW, potentially decreasing to $\$$87/kW at 1 GW (2022-dollar year basis) with most of the cost reduction happening as systems scale from 1 MW to 100 MW. We find that BOP subsystems hydrogen drying and water knockout benefited the most from economies-of-scale cost reductions, and piping, instrumentation, and housing and power electronics were less impacted. These cost reductions from economies of scale could be more significant than estimated cost reductions from manufacturing scale-up reported in literature. These results add to the knowledge base that could guide optimal system designs that balance process scale-up with plant modularization and numbering-up. We also estimate that scaling up BOP could potentially lower the levelized cost of hydrogen (LCOH) by $\$$1.7-$\$$4.6/kg, depending on the scale-up magnitude and the plant capacity factor.

08 HYDROGEN

Advancing Asset Management in Water Infrastructure Systems

Aging water system infrastructure, including drinking water, wastewater, and stormwater, poses a growing challenge for utilities and municipalities. These water systems have well documented challenges with respect to their age, condition, and level of service. ASCE annual report cards consistently rate these infrastructure systems in the United States as underfunded, overcapacity, or past service life (ASCE 2025 Report Card). For example, Chini and Stillwell (2017) estimated that the mean water loss in drinking water systems, i.e., non-revenue water, is approximately 16% across the United States. These concerns are not just relegated to the United States, with Courtenay, British Columbia, identifying 17% of their water main pipes as in a ‘poor’ condition state, defined as a category condition 5 out of 5 (City of Courtenay, 2024). These cases illustrate the challenges utilities are facing to manage extensive networks of infrastructure to deliver a consistent and high level of service. For buried infrastructure such as water systems, studies suggest that preventative interventions can lead to lower maintenance costs and fewer service disruptions (Mazumder et al, 2018; Li et al, 2014). The demonstrated need and benefit of appropriately applied asset management is juxtaposed against the relatively sparse literature that evaluates water systems within an asset management construct. Since 2020, just 37 papers specifically reference asset management in the Journal of Water Resources Planning and Management. Of those, only a few specifically look to develop strategies for improved asset management. Therefore, we highlight four key research areas that represent opportunities for advancement of asset management research for water systems. First, advances in condition assessment and forecasting are needed to better estimate asset deterioration using diverse datasets. Second, machine learning (ML) and artificial intelligence (AI) hold promise for predictive maintenance and investment prioritization, though questions of generalizability and model transparency remain. Third, applying a value of information framework can guide utilities in making cost-effective sensor deployment and data collection decisions, to direct monitoring strategies towards data-informed asset management decisions. Finally, integrated infrastructure management is critical, requiring coordinated planning with other infrastructure systems and stakeholder engagement to reduce costs and enhance service delivery.

Chini, Christopher M.

Assessment of Molybdate Based Corrosion Inhibitor for use at the Savannah River Tank Farm Cooling Water System

The Savannah River Site (SRS) has relied on 51 underground storage tanks, many dating back to the 1950s, to store radioactive liquid waste generated from nuclear processing and radionuclide production. These tanks use carbon steel cooling coils, cooled by soft, acidic water, to dissipate the decayed heat produced by radioactive waste. For decades, following historical industry practices, chromate has been added to the cooling water (~450 ppm at pH 9-11) to effectively inhibit corrosion, ensuring cooling coil longevity. Inspections of failed coils reveal that chromate-treated surfaces are generally well-preserved.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W

Investigation of the Performance and Explainability Tradeoffs for Machine-Learning Models for Predictive Maintenance of Circulating Water Systems in Nuclear Power Plants

Predictive maintenance (PdM) has shown great potential for achieving substantial cost savings and enhancing the economic competitiveness of nuclear power plants (NPPs) in today's energy market. Among the different modeling approaches that exist, machine learning (ML) tools in particular have a demonstrated ability to handle high dimensional and multivariate data and to extract hidden relationships within data in industrial environments. While ML methods show great potential, their lack of explainability---especially for black-box models---is a major hurdle to their adoption. Moreover, considering the supposed trade-off between explainability and performance challenges, careful consideration must be made as to which of these quality aspects takes precedence in light of multiple modeling options, resource availability, and domain characteristics. The present work evaluates the performance of six ML models, each with a different degree of explainability, in classifying the conditions of circulating water pumps (CWPs) by utilizing sensor data from nuclear power plants. To determine the drivers behind the trade-offs presented by this array of models, this work also tests different combinations of CWP units as the training and testing data, degrees of data imbalance, and objective functions for hyperparameter tuning. It was found that black-box models tend to afford superior performance in cases where there are far more instances of one type of labeled data than of any other type. It is recommended that a guided procedure be followed for designing and delivering an ML system that is sufficiently explainable to all involved stakeholders.

22 - GENERAL STUDIES OF NUCLEAR REACTORS

From Obsolete to Optimal (ATR Demineralized Water System)

My project was migrating a Human-Machine Interface (HMI) and Programmable Logic Controller (PLC) program from legacy software to a modern platform, enhancing operational efficiency and eliminating unsupported, obsolete equipment. Initially, I used a migration tool to transfer the programs to the new software, then manually updated variables to align with the new PLC. I optimized the PLC code by leveraging new scaling features in the I/O cards, removing over 45 obsolete rungs, and enhancing clarity with functional tag aliases. Next, I modernized the HMI's visuals with an updated color scheme and 3D buttons. I developed multiple interface versions iteratively refining them based on operator feedback. I also designed and created a dedicated "Rounds" screen incorporating insights from a previous intern’s project to streamline daily rounds. To improve clarity, consistency, and efficiency I redesigned the entire interface. Adding visual indicators to enhance operational awareness: red is used for values outside normal specifications, green for normal operating modes, yellow for manual mode, and grey for offline units. Additionally, I added a dynamic visual representation of tank levels, creating PLC logic to show the level in inches as well as inches and feet. I then incorporated a navigation sidebar to facilitate efficient screen transitions. Risk of human error was mitigated by defining narrow input ranges for tank level shutoff and password protecting setpoint changes. I also fixed issues with datatypes that caused inaccuracies in the original code. Overall, this comprehensive upgrade significantly enhanced the HMI's functionality, user experience, and operational reliability.

47 - OTHER INSTRUMENTATION

Field Testing of an Affordable Zero-Liquid-Discharge Arsenic-Removal Technology for a Small-Community Drinking Water System in Rural California

Arsenic contamination in groundwater threatens public health, particularly in small, low-income communities lacking affordable treatment solutions. This study investigated the field implementation of novel air cathode assisted iron electrocoagulation (ACAIE) technology for arsenic removal in Allensworth, California, where groundwater arsenic concentrations exceeded 250 µg/L. Over four months, a pilot-scale ACAIE system, operating at 600 L/h, consistently reduced arsenic levels to below the EPA’s maximum contaminant level of 10 µg/L. Laboratory experiments informed the optimization of charge dosage and flow rates, which were validated during field testing of the ACAIE 600 L/h system. The in-situ generation of hydrogen peroxide at the cathode speeded up the reaction kinetics, ensuring high arsenic removal efficiency while allowing high throughput, even with a compact reactor size. An economic analysis demonstrated a treatment cost of USD 0.02/L excluding labor, highlighting the system’s affordability compared to conventional methods. Adding labor costs increased the treatment cost to USD 0.09/L. The regeneration of air cathodes extended their operational life, addressing a key maintenance challenge, thus reducing the costs slightly. Intermittent challenges were encountered with filtration and secondary contaminant removal; these issues highlight opportunities for further operational improvements. Despite these challenges, ACAIE’s low operational complexity, scalability, and cost-effectiveness make it a promising solution for underserved small communities. These findings provide critical insights into deploying sustainable arsenic remediation technologies that are tailored to the needs of rural, low-resource communities.

Bandaru, Siva R S

In-Conduit Hydropower for Public Water Supply Systems: Development Challenges and Costs

Conduit hydropower leverages existing water infrastructure to provide energy solutions, though deployment has been slow. A 2022 US Department of Energy (DOE)–funded report led by Oak Ridge National Laboratory (ORNL) summarizes a reconnaissance-level study of hydropower potential at national conduits (Kao et al., 2022). The report includes power and energy estimates across three major sectors of conduit hydropower potential: municipal, agricultural, and industrial. Water resources include public water supply systems (municipal and industrial), irrigation canal systems (agricultural), thermoelectric cooling systems (industrial), and wastewater systems (municipal and industrial). In total, 1.41 GW of power potential was estimated nationwide. Subsequently, DOE has funded ORNL through the Conduit Hydropower Engineering, Evaluation, and Technology Acceleration project (CHEETA) to improve deployment potential for conduit hydropower. Work thus far has focused on “in-conduit” hydropower (ICH)—or “in-pipe” hydropower—for public water supply systems, though the project is planning to cover conduit hydropower more broadly. The timeline of ORNL’s conduit hydropower related research and development (R&D) is shown in Figure 1. The results of CHEETA should benefit the hydropower industry by providing insights into costs, barriers, and other considerations that impact project development. The hydropower industry and municipal/industrial conduit stakeholders will use the output to inform development decisions and advance low-impact hydropower growth in the US.

13 HYDRO ENERGY

Hot Water Recirculation Systems: Designing for Success [Slides]

This presentation will focus on on-demand hot water recirculation systems and how they contribute to energy and water conservation in residential buildings. This work illustrates best practices for designing, installing, and operating these systems, drawing from research and field testing to provide practical recommendations. The ultimate goal is to reduce wait times for hot water, comply with current energy codes, and lower both energy use and greenhouse gas emissions, while improving user satisfaction. In the upcoming slides, we'll dive into case studies and explore the latest technological advancements that help achieve these objectives.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Hydropower Infrastructure - LAkes, Reservoirs, and RIvers (HILARRI), v4

HILARRI is a database of links between major datasets of operational hydropower dams and powerplants, and inland water bodies. These connections are critical for conducting large-scale analysis of hydropower infrastructure and their associated natural and engineered water systems. Features include: – Dams from the National Inventory of Dams (2025) and the Global Reservoir and Dam Database (GRanD v1.3) – Hydropower plants from the Existing Hydropower Assets dataset (EHA 2025) – Power plants that are listed in the 2025 U.S. Hydropower Development Pipeline Data or were listed in previous versions of the dataset These hydropower infrastructure features are linked to several major datasets that provide hydrologic and hydraulic information relevant for analysis of hydropower systems that includes the integral water resources. That information comes from: – Products from the National Hydrography Dataset (NHD) – NHDPlusV2 Medium Resolution river network flowlines, – NHD waterbodies (limited to lakes and reservoirs), – NHD Watershed Boundary Dataset (HUC12-level for the Conterminous United States (CONUS)) – NHD High Resolution waterbodies – HydroLAKES water bodies (lakes and reservoirs) – LAGOS-US lakes and reservoirs – EPA National Lakes Assessment (2007, 2012, 2017, and 2022) – The Reservoir Sedimentation Database (RESSED) – EPA SuRGE sampling locations Unique identifiers are used to facilitate joining to the original full datasets. For example, characteristics of NHD flowlines such as estimated average flow rate can be joined from the NHDPlusV2 dataset to a dam or power plant listed in HILARRI based on the ID field, “COMID”, that is common to both datasets. HILARRI only includes basic information about identifiers, location, and data quality or usage notes. It does not contain the attributes or time series data associated with these sites. The HILARRI dataset incorporates information from several datasets to facilitate more effective and accurate analysis of hydropower infrastructure and their associated waterbodies. For example, dams were checked against the most recent American Rivers Dam Removal Database to identify and flag facilities that may no longer exist. Additionally, dams that are listed multiple times in the NID are identified and flagged to avoid double-counting when analyzing and summarizing information. Other quality flags include certainty of operational hydropower (i.e., if one or more datasets indicates hydropower at a particular location), whether an associated water body is accurate or composed of multiple polygons, or whether there is a known issue with reported characteristics in one of the underlying datasets. These additional data flags are designed to increase confidence in data usage for individual to large-scale analyses.

Hansen, Carly [ORNL] (ORCID:0000000193280838)

Monitoring strain evolution in water-sand systems using distributed acoustic sensing for geohazard early warning

Rainfall-driven hazards such as landslides, debris flows, and earthen dam failures often arise when water changes the internal strain within sand. This study evaluates the ability of distributed acoustic sensing to monitor these strain changes in real time. We embed a fiber-optic cable in a sand-filled glass cylinder and run controlled dry- and wet-sand experiments to measure how strain develops as water infiltrates, saturates, and drains from the sand. The sensing system detects uneven water movement in dry sand and enables millimeter-scale estimates of infiltration rates, and in wet sand it tracks rising water levels, delayed strain peaks after saturation, and abrupt strain shifts during drainage. These results show that fiber-optic sensing captures subtle strain evolution throughout the full water-sand interaction cycle. The study demonstrates that fiber-optic sensing offers promising potential for real-time and cost-effective monitoring and early warning of rainfall-induced geohazards.

58 GEOSCIENCES