Waste Retrieval Enhancements to Achieve Preliminary Cease Waste Removal in Savannah River Site Liquid Waste Tanks 9H and 10H – 25348
The Liquid Waste (LW) contractor at the Savannah River Site (SRS) is Savannah River Mission Completion (SRMC). The LW Mission is tasked with processing legacy nuclear waste stored in underground waste tanks for final disposition. The Concentration, Storage, and Transfer Facilities (CSTF) contain 43 active waste tanks and 8 closed waste tanks between the two tank farms, F-Area Tank Farm (FTF) and H-Area Tank Farm (HTF). The first steps in the Waste Retrieval and Tank Closure (WRTC) process are the waste removal campaigns, consisting of either salt dissolution or sludge mobilization. Two tanks that are rapidly approaching the final closure determination and have demonstrated considerable success with salt dissolution are Tanks 9 and 10. The closure of these tanks is a high priority for the LW Mission due to the greater environmental risk they pose since both tanks reside within the water table and contain active leak sites from the primary tank to the annulus space. Tanks 9 and 10 have each recently completed their respective salt dissolution campaigns and achieved the Preliminary Cease Waste Removal (PCWR) milestone.