Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “vent port tool”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

CH Packaging Operations Manual

This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing Shielded Container Payload Assembly; 1.7, Preparing SWB Payload Assembly; and 1.8, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence, except as noted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations Manual (Rev. 10)

This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing Shielded Container Payload Assembly; 1.7, Preparing SWB Payload Assembly; and 1.8, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence, except as noted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations Manual (Rev. 10.1)

This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing Shielded Container Payload Assembly; 1.7, Preparing SWB Payload Assembly; and 1.8, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence, except as noted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CNS 10-160B RH Cask Program Guidance (Rev. 2)

The purpose of this document is to provide guidelines and to define responsibilities for use, operation, inspection, and maintenance of the 10-160B cask and directly related components used for shipments of DOE controlled TRU waste. This document complies with the minimum requirements specified in the Safety Analysis Report (SAR) for Model 10-160B Type B Radwaste Shipping Cask and U.S. Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9204. In the event of a conflict between this document and the SAR or C of C, the C of C shall govern.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Multipurpose Thermal Insulation Test Apparatus

A multi-purpose thermal insulation test apparatus is used for testing insulation materials, or other components. The test apparatus is a fluid boil-off calorimeter system for calibrated measurement of the apparent thermal conductivity (k-value) of a specimen material at a fixed vacuum level. The apparatus includes an inner vessel for receiving a fluid with a normal boiling point below ambient temperature, such as liquid nitrogen, enclosed within a vacuum chamber. A cold mass assembly, including the inner vessel and thermal guards, is suspended from the top of the vacuum chamber. Handling tools attach to the cold mass assembly for convenient manipulation of the assembly and for the installation or wrapping of insulation test materials. Liquid nitrogen is typically supplied to the inner vessel using a fill tube with funnel. A single port through the top of the vacuum chamber facilitates both filling and venting. Aerogel composite stacks with reflective films are fastened to the top and the bottom of the inner vessel as thermal guards. The comparative k-value of the insulation material is determined by measuring the boil-off flow rate of gas, the temperature differential across the insulation thickness, and the dimensions (length and diameters) of the test specimen.

Fesmire, James E.↗

The International Space Station (ISS) Port 1 (P1) External Active Thermal Control System (EATCS) Ammonia Leak

From 2011 to 2017, the crew onboard the International Space Station (ISS) was at risk of dire consequences due to an external ammonia leak. Ammonia is used in the External Active Thermal Control System (EATCS) to cool the pressurized modules and external electrical systems. Engineers at NASA's Johnson Space Center (JSC) initially detected the leak in one of two cooling loops by monitoring the system ammonia inventory decay over time. White flakes seen on High Definition (HD) cameras were also thought to be associated with the leakage but not confirmed. Initially, the leak was small enough that the ammonia inventory and system operations were not in jeopardy. However, the leak began to accelerate to the point where troubleshooting and corrective action were vital to the sustainability of the ISS. Therefore, it became imperative that the leak be located and repaired for ISS operations to continue. No tools were readily available on the ISS to locate such a leak when it was initially detected, however NASA engineers were already in the process of developing a new device for this purpose called the Robotic External Leak Locator (RELL). The RELL is a robotic instrument package with a mass spectrometer and an ion pressure gauge. Initial checkout operations with RELL happened to coincide with the increasing leak, and ammonia vapors were measured around the P1 EATCS Radiator #3 flexible jumper hoses. The leak stopped after the radiator and its flexible hoses were remotely isolated from the loop and the ammonia from the isolated segment was vented to space. Astronauts conducted a spacewalk that successfully removed the hoses, which were returned to ground for further investigation. The purpose of this paper is to review the leak detection and isolation efforts, investigation results, lessons learned and the recovery plan.

Cowan, Darnell T.↗

The International Space Station (ISS) Port 1 (P1) External Active Thermal Control System (EATCS) Ammonia Leak

From 2011 to 2017, the crew onboard the International Space Station (ISS) was at risk of dire consequences due to an external ammonia leak. Ammonia is used in the External Active Thermal Control System (EATCS) to cool the pressurized modules and external electrical systems. Engineers at NASA's Johnson Space Center (JSC) initially detected the leak in one of two cooling loops by monitoring the system ammonia inventory decay over time. White flakes seen on High Definition (HD) cameras were also thought to be associated with the leakage but not confirmed. Initially, the leak was small enough that the ammonia inventory and system operations were not in jeopardy. However, the leak began to accelerate to the point where troubleshooting and corrective action were vital to the sustainability of the ISS. Therefore, it became imperative that the leak be located and repaired for ISS operations to continue. No tools were readily available on the ISS to locate such a leak when it was initially detected, however NASA engineers were already in the process of developing a new device for this purpose called the Robotic External Leak Locator (RELL). The RELL is a robotic instrument package with a mass spectrometer and an ion pressure gauge. Initial checkout operations with RELL happened to coincide with the increasing leak, and ammonia vapors were measured around the P1 EATCS Radiator #3 flexible jumper hoses. The leak stopped after the radiator and its flexible hoses were remotely isolated from the loop and the ammonia from the isolated segment was vented to space. Astronauts conducted a spacewalk that successfully removed the hoses, which were returned to ground for further investigation. The purpose of this paper is to review the leak detection and isolation efforts, investigation results, lessons learned and the recovery plan.

Cowan, Darnell T.↗