Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Utility operational experience on the NASA/DOE MOD-0A 200-kW wind turbine

The Mod-0A 200 wind turbine was designed and fabricated as part of the Federal Wind Energy Program. Early wind turbine operation and performance data were obtained while gaining initial experience in the operation of large, horizontal axis wind turbines in typical utility environments. The Mod-0A wind turbine was turned over to the Town of Clayton Light and Water Plant, Clayton, NM, for utility operation and on December 31, 1978, the machine had completed ten months of utility operation. The machine is described and the recent operational experience at Clayton, NMis documented.

Glasgow, J. C.

Utility operational experience on the NASA/DOE Mod-OA 200 kW Wind Turbine

The Mod-OA 200 kW Wind Turbine was designed and fabricated by the Lewis Research Center of the NASA under the direction of the U.S. Department of Energy. The project is a part of the Federal Wind Energy Program and is designed to obtain early wind turbine operation and performance data while gaining initial experience in the operation of large, horizontal axis wind turbines in typical utility environments. On March 6, 1978, the Mod-OA wind turbine was turned over to the Town of Clayton Light and Water Plant, Clayton, NM, for utility operation and on December 31, 1978 the machine had completed ten months of utility operation. This paper describes the machine and documents the recent operational experience at Clayton, NM.

Glasgow, J. C.

Navigating Integration: Key Challenges for Data Centers, Nuclear Stakeholders, and Utility Operators

he exponential growth of data centers—driven by artificial intelligence and cloud computing—is reshaping the U.S. energy landscape, presenting urgent challenges and transformative opportunities for data center developers, nuclear energy providers, and utility operators. As data centers are projected to consume up to 12% of U.S. electricity by 2028, stakeholders must address rapid deployment needs, grid congestion, and the demand for reliable, high-quality power. This presentation explores the multifaceted barriers to integrating data centers with nuclear and utility infrastructure, including land use constraints, public perception, regulatory complexity, and workforce alignment. It highlights the distinct priorities and operational cultures of each sector, and the friction that arises from misaligned planning horizons and risk tolerances. We examine collaborative strategies such as co-siting, hybrid power-purchase agreements, unified community engagement, and innovative financing models.

22 - GENERAL STUDIES OF NUCLEAR REACTORS

NSTS operations utilization directorate

A basic understanding is provided of the National Space Transportation System payload processing operations performed at NASA-Kennedy. The payload facilities, support services, and ground support equipment used to support that process are described.

Morian, John

Operational utilization of remotely sensed data

The use of data from environmental satellites and other remote sensing platforms in some of NOAA's operational services are described. Topics discussed include: hurricanes; severe local storms and tornadoes; forest guidance; weather forecasting; hydrology; space program support; oceanography; search and rescue; and wildlife management. Applications which have become routine, and those which are in advanced field test are included. Some applications yield a clear cut economic benefit. In other cases, benefits -- if any -- are obscure. In yet other cases, benefits in one sector may be offset by detriments in another. Illustrative examples are given.

Jones, J. B.

Navigating Integration: Key Challenges for Data Centers, Nuclear Stakeholders, and Utility Operators

The rapid expansion of data centers, driven by the exponential growth in data-processing and storage needs, presents significant challenges and opportunities for various stakeholders, including data center developers, nuclear energy providers, and utility companies. Data centers are projected to consume 6.7–12% of United States (U.S.) electricity by 2028, driven by artificial intelligence (AI) and cloud-computing demands. Nuclear energy offers reliability and dispatchable baseload power, but data centers need power now while nuclear still needs time to address siting, fast power ramping, and regulatory hurdles. Utilities must keep pace with the unprecedented acceleration of large load interconnection requests and urgently adapt to high-density loads while maintaining grid stability, reliability, and accelerating interconnection timelines. This report dives into these challenges and proposes key collaboration strategies to streamline data center integration that aligns with recent federal initiatives like America’s AI Action Plan and related executive orders that emphasize the importance of data center growth, nuclear energy expansion, and maintaining a competitive edge in the global AI race.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN

Objective Operational Utilization of Satellite Microwave Scatterometer Observations of Tropical Cyclones

This study has demonstrated that high-resolution scatterometer measurements in tropical cyclones and other high-marine surface wind regimes may be retrieved accurately for wind speeds up to about 35 mls (1-hour average at 10 m) when the scatterometer data are processed through a revised geophysical model function, and a spatial adaptive algorithm is applied which utilizes the fact that wind direction is so tightly constrained in tile inner core of severe marine storms that wind direction may be prescribed from conventional data. This potential is demonstrated through case studies with NSCAT data in a severe West Pacific Typhoon (Violet, 1996) and an intense North Atlantic hurricane (Lili, 1996). However, operational scatterometer winds from NSCAT and QuickScat in hurricanes and severe winter storms are biased low in winds above 25 m/s. We have developed an inverse model to specify the entire surface wind field about a tropical cyclone from operational QuickScat scatterometer measurements within 150 nm of a storm center with the restriction that only wind speeds up to 20 m/s are used until improved model function are introduced. The inverse model is used to specify the wind field over the entire life-cycle of Hurricane Floyd (1999) for use to drive an ocean wave model. The wind field compares very favorably with wind fields developed from the copious aircraft flight level winds obtained in this storm.

Cardone, Vincent J.

Verification of an altitude decompression sickness prevention protocol for Shuttle operations utilizing a 10.s psi pressure stage

Three test series involving 173-man tess were conducted to define and verify a pre-extravehicular activity (EVA) denitrogenation procedure that would provide acceptable protection against altitude decompression sickness while minimizing the required duration of oxygen (O2) prebreathe in the suit prior to EVA. The tests also addressed the safety, in terms of incidence of decompression sickness, of conducting EVA's on consecutive days rather than on alternate days. The tests were conducted in an altitude chamber, subjects were selected as representative of the astronaut population, and EVA periods were simulated by reducing the chamber pressure to suit pressure while the subjects breathed O2 with masks and worked at EVA representative work rates. A higher than anticipated incidence of both venous bubbles (55%) and symptoms (26%) was measured following all denitrogenation protocols in this test. For the most part, symptoms were very minor and stabilized, diminished, or disappeared in the six-hour tests. Instances of clear, possible, or potential systemic symptoms were encountered only after use of the unmodified 10.2 psi protocol and not after the modified 10.2 psi protocol, the 3.5-hour O2 prebreathed protocol, or the 4.0-hour O2 prebreathe protocol. The high incidence of symptoms is ascribed to the type and duration of exercise and the sensitivity of the reporting technique to minor symptoms. Repeated EVA exposures after only 17 hours did not increase symptom or bubble incidence.

Waligora, J. M.

Real-Time Multiprocessor Programming Language (RTMPL) user's manual

A real-time multiprocessor programming language (RTMPL) has been developed to provide for high-order programming of real-time simulations on systems of distributed computers. RTMPL is a structured, engineering-oriented language. The RTMPL utility supports a variety of multiprocessor configurations and types by generating assembly language programs according to user-specified targeting information. Many programming functions are assumed by the utility (e.g., data transfer and scaling) to reduce the programming chore. This manual describes RTMPL from a user's viewpoint. Source generation, applications, utility operation, and utility output are detailed. An example simulation is generated to illustrate many RTMPL features.

Arpasi, D. J.

International utilization and operations

The international framework of the Space Station Freedom Program is described. The discussion covers the U.S. space policy, international agreements, international Station elements, overall program management structure, and utilization and operations management. Consideration is also given to Freedom's user community, Freedom's crew, pressurized payload and attached payload accommodations, utilization and operations planning, user integration, and user operations.

Goldberg, Stanley R.