Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “uplink detection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Single Carrier Modulation Resource Allocation for Massive MIMO with Virtual Antennas

Today’s Massive MIMO cellular operation is dominated by orthogonal frequency division multiplexing (OFDM) modulation. One of the advantages of OFDM is the flexibility to carve up the available spectrum into resource blocks (RBs) that can operate adjacent to one another. Massive MIMO adds spatial multiplexing layers on top of the RBs, enabling the simultaneous operation of dozens of UEs. Cyclic prefixed single carrier modulation (CP-SCM) is an alternative to OFDM that also benefits from massive MIMO and is useful as an OFDM alternative in specific scenarios. However, until recently, no resource allocation method has been proposed for CP-SCM. In this paper, we present a CP-SCM resource allocation scheme using virtual antennas in a massive MIMO time domain duplexed scenario. By creating several virtual antennas for each physical antenna, the benefits of massive MIMO are achieved with a smaller physical antenna count. Resources are quantized into data streams, and each user can be assigned a variable number of simultaneous streams. This paper presents a detailed development and analysis of multi-stream processing (MSP) for both uplink detection and downlink precoding. We also introduce heterogeneous MSP, where CP-SCM and OFDM signals can be processed in the same MSP framework.

5G and beyond communications↗

Digital Interface Board to Control Phase and Amplitude of Four Channels

An increasing number of parts are designed with digital control interfaces, including phase shifters and variable attenuators. When designing an antenna array in which each antenna has independent amplitude and phase control, the number of digital control lines that must be set simultaneously can grow very large. Use of a parallel interface would require separate line drivers, more parts, and thus additional failure points. A convenient form of control where single-phase shifters or attenuators could be set or the whole set could be programmed with an update rate of 100 Hz is needed to solve this problem. A digital interface board with a field-programmable gate array (FPGA) can simultaneously control an essentially arbitrary number of digital control lines with a serial command interface requiring only three wires. A small set of short, high-level commands provides a simple programming interface for an external controller. Parity bits are used to validate the control commands. Output timing is controlled within the FPGA to allow for rapid update rates of the phase shifters and attenuators. This technology has been used to set and monitor eight 5-bit control signals via a serial UART (universal asynchronous receiver/transmitter) interface. The digital interface board controls the phase and amplitude of the signals for each element in the array. A host computer running Agilent VEE sends commands via serial UART connection to a Xilinx VirtexII FPGA. The commands are decoded, and either outputs are set or telemetry data is sent back to the host computer describing the status and the current phase and amplitude settings. This technology is an integral part of a closed-loop system in which the angle of arrival of an X-band uplink signal is detected and the appropriate phase shifts are applied to the Ka-band downlink signal to electronically steer the array back in the direction of the uplink signal. It will also be used in the non-beam-steering case to compensate for phase shift variations through power amplifiers. The digital interface board can be used to set four 5-bit phase shifters and four 5-bit attenuators and monitor their current settings. Additionally, it is useful outside of the closed-loop system for beamsteering alone. When the VEE program is started, it prompts the user to initialize variables (to zero) or skip initialization. After that, the program enters into a continuous loop waiting for the telemetry period to elapse or a button to be pushed. A telemetry request is sent when the telemetry period is elapsed (every five seconds). Pushing one of the set or reset buttons will send the appropriate command. When a command is sent, the interface status is returned, and the user will be notified by a pop-up window if any error has occurred. The program runs until the End Program button is depressed.

Smith, Amy E.↗

Cell-Edge Detection via Selective Cooperation and Generalized Canonical Correlation

Improving the uplink quality of service for users located around the boundaries between cells is a key challenge in cellular systems. Existing approaches relying on power control throttle the rates of cell-center users, while multi-user detection requires accurate channel estimates for the cell-edge users, which is another challenge due to their low received signal-to-noise ratio (SNR). Utilizing the fact that cell-edge user signals are weak but common (received at roughly equal power) at different base stations (BSs), this paper establishes a connection between cell-edge user detection and generalized canonical correlation analysis (GCCA). It puts forth a GCCA-based method that leverages selective BS cooperation to recover the cell-edge user signal subspace even at low SNR. The cell-edge user signals can then be extracted from the resulting mixture via algebraic signal processing techniques. The paper includes theoretical analysis showing why GCCA recovers the correct subspace containing the cell-edge user signals under mild conditions. The proposed method can also identify the number of cell-edge users in the system, i.e., the common subspace dimension. Simulations reveal significant performance improvement relative to various multiuser detection techniques. Cell-edge detection performance is further studied as a function of how many / which BSs are selected, and it is shown that using the closest three BS is always the best choice.

base station cooperation↗

Use of Semi-Autonomous Tools for ISS Commanding and Monitoring

As the International Space Station (ISS) has moved into a utilization phase, operations have shifted to become more ground-based with fewer mission control personnel monitoring and commanding multiple ISS systems. This shift to fewer people monitoring more systems has prompted use of semi-autonomous console tools in the ISS Mission Control Center (MCC) to help flight controllers command and monitor the ISS. These console tools perform routine operational procedures while keeping the human operator "in the loop" to monitor and intervene when off-nominal events arise. Two such tools, the Pre-positioned Load (PPL) Loader and Automatic Operators Recorder Manager (AutoORM), are used by the ISS Communications RF Onboard Networks Utilization Specialist (CRONUS) flight control position. CRONUS is responsible for simultaneously commanding and monitoring the ISS Command & Data Handling (C&DH) and Communications and Tracking (C&T) systems. PPL Loader is used to uplink small pieces of frequently changed software data tables, called PPLs, to ISS computers to support different ISS operations. In order to uplink a PPL, a data load command must be built that contains multiple user-input fields. Next, a multiple step commanding and verification procedure must be performed to enable an onboard computer for software uplink, uplink the PPL, verify the PPL has incorporated correctly, and disable the computer for software uplink. PPL Loader provides different levels of automation in both building and uplinking these commands. In its manual mode, PPL Loader automatically builds the PPL data load commands but allows the flight controller to verify and save the commands for future uplink. In its auto mode, PPL Loader automatically builds the PPL data load commands for flight controller verification, but automatically performs the PPL uplink procedure by sending commands and performing verification checks while notifying CRONUS of procedure step completion. If an off-nominal condition occurs during procedure execution, PPL Loader notifies CRONUS through popup messages, allowing CRONUS to examine the situation and choose an option of how PPL loader should proceed with the procedure. The use of PPL Loader to perform frequent, routine PPL uplinks offloads CRONUS to better monitor two ISS systems. It also reduces procedure performance time and decreases risk of command errors. AutoORM identifies ISS communication outage periods and builds commands to lock, playback, and unlock ISS Operations Recorder files. Operation Recorder files are circular buffer files of continually recorded ISS telemetry data. Sections of these files can be locked from further writing, be played back to capture telemetry data that occurred during an ISS loss of signal (LOS) period, and then be unlocked for future recording use. Downlinked Operation Recorder files are used by mission support teams for data analysis, especially if failures occur during LOS. The commands to lock, playback, and unlock Operations Recorder files are encompassed in three different operational procedures and contain multiple user-input fields. AutoORM provides different levels of automation for building and uplinking the commands to lock, playback, and unlock Operations Recorder files. In its automatic mode, AutoORM automatically detects ISS LOS periods, then generates and uplinks the commands to lock, playback, and unlock Operations Recorder files when MCC regains signal with ISS. AutoORM also features semi-autonomous and manual modes which integrate CRONUS more into the command verification and uplink process. AutoORMs ability to automatically detect ISS LOS periods and build the necessary commands to preserve, playback, and release recorded telemetry data greatly offloads CRONUS to perform more high-level cognitive tasks, such as mission planning and anomaly troubleshooting. Additionally, since Operations Recorder commands contain numerical time input fields which are tedious for a human to manually build, AutoORM's ability to automatically build commands reduces operational command errors. PPL Loader and AutoORM demonstrate principles of semi-autonomous operational tools that will benefit future space mission operations. Both tools employ different levels of automation to perform simple and routine procedures, thereby offloading human operators to perform higher-level cognitive tasks. Because both tools provide procedure execution status and highlight off-nominal indications, the flight controller is able to intervene during procedure execution if needed. Semi-autonomous tools and systems that can perform routine procedures, yet keep human operators informed of execution, will be essential in future long-duration missions where the onboard crew will be solely responsible for spacecraft monitoring and control.

Brzezinski, Amy S.↗

Multi-Beam Laser Beacon Propagation Over Lunar Distance: Comparison of Predictions and Measurements

A multi-beam beacon was transmitted from the Optical Communication Telescope Laboratory (OCTL) located at Table Mountain, CA to the Lunar Laser Space Terminal (LLST), on-board the Lunar Atmospheric Dust and Environment Explorer (LADEE) spacecraft, during NASA’s recent Lunar Laser Communication Demonstration (LLCD). The laser beacon (1568?0.1 nm) was square wave modulated and sensed by a LLST quadrant sensor to enable link acquisition and tracking. LLST computed the mean received beacon power and returned 5 kHz sampled power time series over the downlink. Post-processing of the decoded downlink received at OCTL retrieved the uplink power recorded at LLST. The predicted mean irradiance delivered to LLST consistently agreed with the variable beam divergence transmitted from OCTL to within < 1 decibel (dB). Irradiance fluctuations detected at LLST were reconciled with an uplink wave-propagation model derived using independently monitored atmospheric parameters. We report good agreement of the scintillation index and atmospheric coherence time.

Biswas, A↗

HiMAT onboard flight computer system architecture and qualification

Two highly maneuverable aircraft technology (HiMAT) remotely piloted research vehicles (RPRV's) are being flight tested at NASA Dryden Flight Research Center, Edwards, California, to demonstrate and evaluate a number of technological advances applicable to future fighter aircraft. Closed-loop primary flight control is performed from a ground-based cockpit utilizing a digital computer and up/down telemetry links. A backup flight control system for emergency operation resides in one of two onboard computers. Other functions of the onboard computer system are uplink processing, downlink processing, engine control, failure detection, and redundancy management. This paper describes the architecture, functions, and flight qualification of the HiMAT onboard flight computer systems.

Myers, A. F.↗

Frequency Domain Detection and Precoding for Massive MIMO With Single Carrier Modulation

Single carrier modulation (SCM) schemes are attractive for uplink (UL) transmissions due to improved power efficiency at the user equipment (UE) transmitter compared with multi-carrier modulation schemes. In a massive MIMO scenario with SCM, the UL detection must mitigate the effects of inter-symbol interference and multiuser interference. This processing is effectively performed in the frequency domain (FD) using a minimum mean squared error (MMSE) detector when the transmission is framed with a cyclic prefix. This paper presents a MMSEbased detector that is compatible with distributed processing in a time-division duplex (TDD) system. The matrix inverses computed for the UL detection are then reused to perform multi-user precoding for the downlink (DL). We find that this scheme yields a tremendous savings in computational complexity compared to commonly used zero-forcing (ZF) precoding without sacrificing any performance. Since MMSE processing introduces a bias to the estimates, we then derive the scalar coefficients necessary to cancel the MMSE bias. The impact of channel estimation errors are analyzed for both the UL and DL cases in conjunction with a power-efficient approach to SCM channel estimation. Moreover, extensive simulations are performed to confirm our theoretical findings.

42 ENGINEERING↗

Results from the Galileo Laser Uplink: A JPL Demonstration of Deep-Space Optical Communications

The successful completion of the Galileo Optical Experiment (GOPEX), represented the accomplishment of a significant milestone in JPL's optical communication plan. The experiment demonstrated the first transmission of a narrow laser beam to a deep-space vehicle. Laser pulses were beamed to the Galileo spacecraft by Earth-based transmitters at the Table Mountain Facility (TMF), California, and Starfire Optical Range (SOR), New Mexico. The experiment took place over an eight-day period (December 9 through December 16, 1992) as Galileo receded from Earth on its way to Jupiter, and covered ranges from 1 to 6 million kilometers (15 times the Earth-Moon distance), the laser uplink from TMF covered the longest known range for laser beam transmission and detection. This demonstration is the latest in a series of accomplishments by JPL in the development of deep-space optical communications technology.

Lasers experiment optical communications Galileo d↗

Resource Allocation for Single Carrier Massive MIMO Systems

Resource allocation in orthogonal frequency division multiplexing (OFDM) systems is performed through allocating blocks of subcarriers to each user. Even though OFDM is the primary waveform for 5G NR systems, research reports have noted that single carrier modulation (SCM) offers several advantages over OFDM in massive multiple input multiple output (MIMO) systems, making it a preferred candidate for some future applications such as massive machine type communications (mMTC). This paper presents a method for SCM resource allocation and the relevant information recovery algorithms at the receiver. Our emphasis is on cyclic prefixed SCM, where highly flexible and efficient frequency domain detection algorithms enable the operation of many simultaneous users in a massive MIMO uplink scenario. The proposed resource allocation method allows the number of users to exceed the number of antennas at the base station (BS). Each single carrier transmission is partitioned into L interleaved streams, and each user is allocated a number of such streams. One major benefit of SCM is that each data symbol is spread over the entire bandwidth. As such, the receiver performance is dictated by the average channel gain across the transmission band rather than the channel gain at a given frequency bin or a small group of frequencies. In the proposed setup, each stream may be thought of as a resource block in SCM, analogous to resource blocks in OFDM. Hence, in the context of this paper, the terms resource blocks and streams may be used interchangeably.

5G and Beyond Communications↗

Deep space network radio science system for Voyager Uranus and Galileo missions

An overview is presented of major new requirements, challenges and conceptual designs for the DSN Radio Science System in the 1985 to 1988 period. The Voyager Uranus encounter is being supported with larger combined aperture, higher sample rate, and a centrally controlled network. The Galileo mission will be provided with a high resolution S-Band Faraday rotation detection capability and a high-stability Doppler system with X-Band uplink for gravitational wave search.

Peng, T. K.↗

MPST Software: MoonKommand

This software automatically processes Sally Ride Science (SRS) delivered MoonKAM camera control files (ccf) into uplink products for the GRAIL-A and GRAIL-B spacecraft as part of an education and public outreach (EPO) extension to the Grail Mission. Once properly validated and deemed safe for execution onboard the spacecraft, MoonKommand generates the command products via the Automated Sequence Processor (ASP) and generates uplink (.scmf) files for radiation to the Grail-A and/or Grail-B spacecraft. Any errors detected along the way are reported back to SRS via email. With Moon Kommand, SRS can control their EPO instrument as part of a fully automated process. Inputs are received from SRS as either image capture files (.ccficd) for new image requests, or downlink/delete files (.ccfdl) for requesting image downlink from the instrument and on-board memory management. The Moon - Kommand outputs are command and file-load (.scmf) files that will be uplinked by the Deep Space Network (DSN). Without MoonKommand software, uplink product generation for the MoonKAM instrument would be a manual process. The software is specific to the Moon - KAM instrument on the GRAIL mission. At the time of this writing, the GRAIL mission was making final preparations to begin the science phase, which was scheduled to continue until June 2012.

Kwok, John H.↗

406-MHz geostationary SAR experiment

The ability of a 406-MHz satellite to detect and locate aeronautical, maritime, and terrestrial distress incidents is investigated. The geostationary satellite, uplink and downlink budgets, and processors utilized in the experiment are described. The experiment involves: (1) benchmark testing, (2) verification of spacecraft repeater performance, (3) system evaluation, and (4) environmental testing. The Canadian processor data reveal that the processor threshold is 28 dB Hz, the degradation at 27 dB Hz is significant, the median distress message throughput time is 6 minutes, and the microcomputer can handle 10 distress incidents per hour.

Dumont, P.↗

The Effects of Limited Intent Information Availability on Self-Separation in Mixed Operations

This paper presents the results of a computer simulation of the NASA Autonomous Flight Rules (AFR) concept for airborne self-separation in airspace shared with conventional Instrument Flight Rules (IFR) traffic. This study was designed to determine the impact of varying levels of intent information from IFR aircraft on the performance of AFR conflict detection and resolution. The study used Automatic Dependent Surveillance-Broadcast (ADS-B) to supply IFR intent, but other methods such as an uplink from a ground-based System Wide Information Management (SWIM) network could alternatively supply this information. The independent variables of the study consist of the number of ADS-B trajectory change reports broadcast by IFR aircraft and the time interval between those reports. The conflict detection and resolution metrics include: the number of conflicts and losses of separation, the average conflict warning time, and the amount of time spent in strategic vs. tactical flight modes (i.e., whether the autoflight system was decoupled from the planned route in the Flight Management System in order to respond to a short-notice traffic conflict). The results show a measurable benefit of broadcasting IFR intent vs. relying on state-only broadcasts. The results of this study will inform ongoing separation assurance research and FAA NextGen design decisions for the sharing of trajectory intent information in the National Airspace System.

Lewis, Timothy A.↗

South Atlantic Anomaly Entry and Exit as Measured by the X-Ray Timing Explorer

The Rossi X-ray Timing Explorer (RXTE) carries instruments that must switch off high voltages (HV) when passing through the South Atlantic Anomaly (SAA). The High Energy X-ray Timing Experiment (HEXTE) contains a particle monitor that detects the increased particle flux associated with the SAA and autonomously reduces its voltage. The Proportional Counter Array (PCA) relies on uplinked predictions of SAA entry/exit times based on ephemeris data provided by the Flight Dynamics Facility. A third instrument, the All-Sky Monitor (ASM) also uses a predicted SAA model to reduce voltage when passing through the SAA. Data collected from the HEXTE particle monitor, as well as other instrument readings near the times of SAA entry/exit offer the potential for refining models of the boundaries of the SAA. The SAA has an increased particle flux which causes high rates of detection in the RXTE instruments designed to observe x-rays. The high counting rates could degrade the PCA if HV is not reduced during SAA passages. On the other hand, PCA downtime can be minimized and the science return can be optimized by having the best possible model of the SAA boundary. Thus, the PCA team planned an extensive effort during in-orbit checkout to utilize both the HEXTE particle monitor data and instrument counting rates to refine the model of the SAA boundary. The times of SAA entry and exit are compared with the definitive epemeris to determine the precise location (latitude and longitude) of the SAA boundary. Over time, the SAA and its perimeter were mapped. The RXTE Science Operations Center is continuously working to feed back the results of this effort into the science scheduling process, improving the SAA model as it affects the RXTE instruments, thus obtaining more accurate estimates of the SAA entry/exit times.

Smith, Evan↗

Digital TV processing system

Two digital video data compression systems directly applicable to the Space Shuttle TV Communication System were described: (1) For the uplink, a low rate monochrome data compressor is used. The compression is achieved by using a motion detection technique in the Hadamard domain. To transform the variable source rate into a fixed rate, an adaptive rate buffer is provided. (2) For the downlink, a color data compressor is considered. The compression is achieved first by intra-color transformation of the original signal vector, into a vector which has lower information entropy. Then two-dimensional data compression techniques are applied to the Hadamard transformed components of this last vector. Mathematical models and data reliability analyses were also provided for the above video data compression techniques transmitted over a channel encoded Gaussian channel. It was shown that substantial gains can be achieved by the combination of video source and channel coding.

Source record↗

Space QUEST Mission Proposal: Experimentally Testing Decoherence Due to Gravity

Models of quantum systems on curved space-times lack sufficient experimental verification. Some speculative theories suggest that quantum properties, such as entanglement, may exhibit entirely different behavior to purely classical systems. By measuring this effect or lack thereof, we can test the hypotheses behind several such models. For instance, as predicted by Ralph and coworkers [T C Ralph, G J Milburn, and T Downes, Phys. Rev. A, 79(2):22121, 2009; T C Ralph and J Pienaar, New Journal of Physics, 16(8):85008, 2014], a bipartite entangled system could decohere if each particle traversed through a different gravitational field gradient. We propose to study this effect in a ground to space uplink scenario. We extend the above theoretical predictions of Ralph and coworkers and discuss the scientific consequences of detecting/failing to detect the predicted gravitational decoherence. We present a detailed mission design of the European Space Agency's (ESA) Space QUEST (Space - Quantum Entanglement Space Test) mission, and study the feasibility of the mission schema.

Entanglement↗

SpaceHab 1 maintenance experiment

The SpaceHab 1 flight on STS-57 served as a test platform for evaluation of two space station payloads. The first payload evaluated a space station maintenance concept using a sweep signal generator and a 48-channel logic analyzer to perform fault detection and isolation. Crew procedures files, test setup diagram files, and software to configure the test equipment were created on the ground and uplinked on the astronauts' voice communication circuit to perform tests in flight. In order to use these files, the portable computer was operated in a multi-window configuration. The test data transmitted to the ground allowing the ground staff to identify the cause of the fault and provide the crew with the repair procedures and diagrams. The crew successfully repaired the system under test. The second payload investigated hand soldering and de-soldering of standard components on printed circuit (PC) boards in zero gravity. It also used a new type of intra-vehicular foot restraints which uses the neutral body posture in zero-g to provide retention of the crew without their conscious attention.

Bohannon, Jackie W.↗