Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “uncertainty management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Uncertainty management in intelligent design aiding systems

A novel approach to uncertainty management which is particularly effective in intelligent design aiding systems for large-scale systems is presented. The use of this approach in the materials handling system design domain is discussed. It is noted that, during any point in the design process, a point value can be obtained for the evaluation of feasible designs; however, the techniques described provide unique solutions for these point values using only the current information about the design environment.

Brown, Donald E.↗

Uncertainty Management for Diagnostics and Prognostics of Batteries using Bayesian Techniques

Uncertainty management has always been the key hurdle faced by diagnostics and prognostics algorithms. A Bayesian treatment of this problem provides an elegant and theoretically sound approach to the modern Condition- Based Maintenance (CBM)/Prognostic Health Management (PHM) paradigm. The application of the Bayesian techniques to regression and classification in the form of Relevance Vector Machine (RVM), and to state estimation as in Particle Filters (PF), provides a powerful tool to integrate the diagnosis and prognosis of battery health. The RVM, which is a Bayesian treatment of the Support Vector Machine (SVM), is used for model identification, while the PF framework uses the learnt model, statistical estimates of noise and anticipated operational conditions to provide estimates of remaining useful life (RUL) in the form of a probability density function (PDF). This type of prognostics generates a significant value addition to the management of any operation involving electrical systems.

Saha, Bhaskar↗

Solar Uncertainty Management and Mitigation for Exceptional Reliability in Grid Operations (SUMMER-GO): Project Final Report

The Solar Uncertainty Management and Mitigation for Exceptional Reliability in Grid Operation (SUMMER-GO) project was recently completed through a collaboration among the National Renewable Energy Laboratory, Maxar, the Electric Reliability Council of Texas (ERCOT), the University of Texas at Dallas, the University of California Berkeley, and the University of Colorado Boulder. The project made significant advances in probabilistic solar power forecasting, both through the development of Bayesian model averaging methods for ensemble forecasting and in bringing these and other advancements into practice with Maxar's delivery of operational forecasts to ERCOT. In addition to creating more reliable solar power forecasts, the project developed methods for their utilization in power system operations. These include the development of risk-aware unit commitment and economic dispatch algorithms and methods to reformulate probabilistic forecasts to be used in these power system operational models. Dynamic power system reserve methods were also developed, which have been shown in silico to create economic savings and reliability improvements on an ERCOT-like system as well as financial savings in the ERCOT system through more granular consideration of the uncertainty associated with solar power forecasts. Finally, a situational awareness tool to help grid operators better understand solar power forecast uncertainty in daily operations was developed and extensively vetted.

14 SOLAR ENERGY↗

Prognostics Uncertainty Management with Application to Government and Industry

Predictions about the future are contingent on future usage, but also on the quality of the models employed and the assessment of the current health state. These factors, amongst others, need to be considered to arrive at a prediction that is conducted through a rigorous method but where the confidence bounds are not prohibitively large.

Prognostics↗

Managing Uncertainty and Flexibility in Day-Ahead Electricity Markets

Net load imbalances from day ahead forecasts can lead to significant grid operations costs and are expected to increase as variable renewable energy adoption grows. We propose a new wholesale market product to manage the risk of net load imbalances called Flexibility Options. This product relies on probabilistic forecasts to estimate flexibility demand and would be co-optimized in the day-ahead market. We also propose stochastic methods that enable DER and flexible load aggregators to participate in flexibility markets while considering the uncertainty in weather and occupant behavior.

day-ahead market↗

Uncertainty management by relaxation of conflicting constraints in production process scheduling

Mathematical-analytical methods as used in Operations Research approaches are often insufficient for scheduling problems. This is due to three reasons: the combinatorial complexity of the search space, conflicting objectives for production optimization, and the uncertainty in the production process. Knowledge-based techniques, especially approximate reasoning and constraint relaxation, are promising ways to overcome these problems. A case study from an industrial CIM environment, namely high-grade steel production, is presented to demonstrate how knowledge-based scheduling with the desired capabilities could work. By using fuzzy set theory, the applied knowledge representation technique covers the uncertainty inherent in the problem domain. Based on this knowledge representation, a classification of jobs according to their importance is defined which is then used for the straightforward generation of a schedule. A control strategy which comprises organizational, spatial, temporal, and chemical constraints is introduced. The strategy supports the dynamic relaxation of conflicting constraints in order to improve tentative schedules.

Dorn, Juergen↗

Managing Uncertainty Due to a Fundamental Error Source Arising from Scatterer Distribution Complexity in Radar Remote Sensing of Precipitation

The assumption that cloud and rain drops are spatially distributed according to a Poisson distribution within a scattering volume probed by a radar being used to estimate precipitation has represented bedrock theory in establishing 'rules of the game' for pulse averaging--the process needed to beat down noise to an acceptable level in the measurement of radar reflectivity factor. Based on relatively recent observations of 'realistic' spatial distributions of hydrometeor scatterers in a cloudy atmosphere motivates a renewed examination of the consequences of using a too simplified assumption underlying volume scattering--particularly in regards to the standard pulse averaging rule. Our investigation addresses two extremes, simple to complex, insofar as allowed for complexities in an underlying scatterer distribution. It is demonstrated that as the spatial distribution ranges from Poisson (a narrow distribution) to multi-fractal (much broader distribution), uncertainty in a measurement increases if the rule for pulse averaging goes unchanged from its Poisson distribution reference county. [A bounded cascade is used for the multi-fractal distribution, a regularly observed distribution vis-a-vis cloud liquid water content.] The resultant measurement uncertainty leads to a fundamental source of error in the estimation of rain rate from radar measurements, one that has been disregarded since the early 1950s when radar sets first began to be used for rainfall measuring. It is shown how this source of error can be 'managed'--under the assumption that number of data analysis experiments would be carried out, experiments involving pulse-by-pulse measurements obtained from a radar set modified to output individual pulses of reflectivity factor. For practical applications, a new parameter called normalized k-sample intensity invariance is developed to enable defining the required pulse average count according to a preferred degree of uncertainty.

Smith, Eric A.↗

Uncertainty Management in Remote Sensing of Climate Data. Summary of A Workshop

Great advances have been made in our understanding of the climate system over the past few decades, and remotely sensed data have played a key role in supporting many of these advances. Improvements in satellites and in computational and data-handling techniques have yielded high quality, readily accessible data. However, rapid increases in data volume have also led to large and complex datasets that pose significant challenges in data analysis (NRC, 2007). Uncertainty characterization is needed for every satellite mission and scientists continue to be challenged by the need to reduce the uncertainty in remotely sensed climate records and projections. The approaches currently used to quantify the uncertainty in remotely sensed data, including statistical methods used to calibrate and validate satellite instruments, lack an overall mathematically based framework.

Remote sensing↗

Human subjects concerns in ground based ECLSS testing - Managing uncertainty in closely recycled systems

U.S. space missions have to this point used water either made on board or carried from earth and discarded after use. For Space Station Freedom, long duration life support will include air and water recycling using a series of physical-chemical subsystems. The Environmental Control and Life Support System (ECLSS) designed for this application must be tested extensively at all stages of hardware maturity. Human test subjects are required to conduct some of these tests, and the risks associated with the use of development hardware must be addressed. Federal guidelines for protection of human subjects require careful consideration of risks and potential benefits by an Institutional Review Board (IRB) before and during testing. This paper reviews the ethical principles guiding this consideration, details the problems and uncertainties inherent in current hardware testing, and presents an incremental approach to risk assessment for ECLSS testing.

Crump, William J.↗

Managing Uncertainty in Preliminary Aeroshell Design Analysis

An analysis tool to aid in preliminary design of re-entry aeroshells for interplanetary exploration is presented. The computational tool addresses a common feature of design analysis, the need to make use of results from several analysis regimes and from several sources.

Design Methods and Models Design Representations C↗

Adaptive Computing for Scale-Up Problems

Adaptive Computing is an application-agnostic outer loop framework to strategically deploy simulations and experiments to guide decision making for scale-up analysis. Resources are allocated over successive batches, which makes the allocation adaptive to some objective such as optimization or model training. The framework enables the characterization and management of uncertainties associated with predictive models of complex systems when scale-up questions lead to significant model extrapolation. A key advancement of this framework is its integration of multi-fidelity surrogate modeling, uncertainty management, and automated orchestration of various computing and experimentation resources into a single integrated software package. This enables efficient multi-fidelity modeling across multiple computing resources by incorporating real-world constraints such as relative queue times and throughput on individual machines into the multi-fidelity sampling decision. We discuss applications of this framework to problems in the renewable energy space, including biofuels production, material synthesis, perovskite crystal growth, and building electrical loads.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Modular supply chain optimization considering demand uncertainty to manage risk

Supply chain under demand uncertainty has been a challenging problem due to increased competition and market volatility in modern markets. Flexibility in planning decisions makes modular manufacturing a promising way to address this problem. We report the problem of multiperiod process and supply chain network design is considered under demand uncertainty. A mixed integer two-stage stochastic programming problem is formulated with integer variables indicating the process design and continuous variables to represent the material flow in the supply chain. The problem is solved using a rolling horizon approach. Benders decomposition is used to reduce the computational complexity of the optimization problem. To promote risk-averse decisions, a downside risk measure is incorporated in the model. The results demonstrate the several advantages of modular designs in meeting product demands. A pareto-optimal curve for minimizing the objectives of expected cost and downside risk is obtained.

42 ENGINEERING↗

Working Notes from the 1992 AAAI Spring Symposium on Practical Approaches to Scheduling and Planning

The symposium presented issues involved in the development of scheduling systems that can deal with resource and time limitations. To qualify, a system must be implemented and tested to some degree on non-trivial problems (ideally, on real-world problems). However, a system need not be fully deployed to qualify. Systems that schedule actions in terms of metric time constraints typically represent and reason about an external numeric clock or calendar and can be contrasted with those systems that represent time purely symbolically. The following topics are discussed: integrating planning and scheduling; integrating symbolic goals and numerical utilities; managing uncertainty; incremental rescheduling; managing limited computation time; anytime scheduling and planning algorithms, systems; dependency analysis and schedule reuse; management of schedule and plan execution; and incorporation of discrete event techniques.

Drummond, Mark↗

Implications of Simulation Conceptual Model Development for Simulation Management and Uncertainty Assessment

A simulation conceptual model is a simulation developers way of translating modeling requirements (i. e., what is to be represented by the simulation or its modification) into a detailed design framework (i. e., how it is to be done), from which the software, hardware, networks (in the case of distributed simulation), and systems/equipment that will make up the simulation can be built or modified. A conceptual model is the collection of information which describes a simulation developers concept about the simulation and its pieces. That information consists of assumptions, algorithms, characteristics, relationships, and data. Taken together, these describe how the simulation developer understands what is to be represented by the simulation (entities, actions, tasks, processes, interactions, etc.) and how that representation will satisfy the requirements to which the simulation responds. Thus the conceptual model is the basis for judgment about simulation fidelity and validity for any condition that is not specifically tested. The more perspicuous and precise the conceptual model, the more likely it is that the simulation development will both fully satisfy requirements and allow demonstration that the requirements are satisfied (i. e., validation). Methods used in simulation conceptual model development have significant implications for simulation management and for assessment of simulation uncertainty. This paper suggests how to develop and document a simulation conceptual model so that the simulation fidelity and validity can be most effectively determined. These ideas for conceptual model development apply to all simulation varieties. The paper relates these ideas to uncertainty assessments as they relate to simulation fidelity and validity. The paper also explores implications for simulation management from conceptual model development methods, especially relative to reuse of simulation components.

Pace, Dale K.↗