Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “turbine testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Tidal Turbine Test, Downeast Turbines, July 12, 2021

Downeast Turbines tested a tidal turbine prototype with novel rotor/channel system and lateral effluent discharge apparatus (LEDA), during five days of testing in the flume at Alden Lab. Three days of testing (July 12-14, 2021) focused on turbine power metrics of torque and rpm, which were low, and then two days of follow-up testing (July 27-28, 2021) focused on LEDA performance metrics of pressure differential and rates of volumetric flow, with encouraging results. Next step is to to characterize, and even optimize, configurations of the LEDA, using 3D-CFD as a helpful tool, to refine its shape and explore its limits of performance as a means of effluent discharge that augments performance of an instream turbine. An improved configuration of the LEDA will be re-combined with the rotor/channel system of the turbine prototype, and ultimately, the rotor will be re-sized (enlarged), to better match the LEDA's performance capabilities in drawing through a rate of volumetric flow. This submission is Downeast Turbines' Post Access Report for the test event. It includes the files described here (next below), and several reference links. "Downeast TEAMER-Post-Access-Report...docx" is a document file containing the report. "Appendices A, B, and C" are included in this file, and so are "Figures #1-7." "Appendix D - Test Data Workbooks.zip" is an archive file containing all post access data (raw data tables, calculating tables, and graphs), presented in fourteen Excel workbooks as described in the report. "Appendix E - Post Access Figures.zip" is an archive file containing "Figures #8-52," of the report.

16 TIDAL AND WAVE POWER↗

Offshore Testing Facility – Small Scale Turbine Testing and Development Final Technical Report

In July 2010 funding for an award was made available under contract DE-EE0004200 which is the focus of this report. Under this funding, The U.S. Department of Energy’s (USDOE) designated Florida Atlantic University’s (FAU) state of Florida marine renewable energy focused Center of Excellence for Ocean Energy Technology as the Southeast National Marine Renewable Energy Center (SNMREC). The award was advertised in 2008, when the USDOE Wind and Water Program issued a funding opportunity announcement (DE-PS36-08GO98030) to establish university-led National Marine Renewable Energy Centers (NMRECs). Although FAU was selected for this opportunity, funding did not become available until 2010 at which time three of the original five years of performance remained and scope was adjusted accordingly. This award was divided into two phases. The first phase focused on marine energy turbine system enhancement and research while the second phase aimed to advance offshore capabilities and testing opportunities for small-scale demonstration turbines. The project’s objective was to increase the nation’s capabilities, knowledge, and competitiveness with respect to ocean current energy technology. This project successfully achieved these goals by advancing marine energy technology testing opportunities and capabilities. This report details these accomplishments by phase and task. Descriptions include any relevant results, challenges, achievements, and outcomes. Additional intellectual products and publications are listed in the Appendix where detailed technical explanations can be found. Further, because this award designated SNMREC as a USDOE center, it challenges FAU to continue providing value for the marine energy sector in the long term. The direct accomplishments of this project, though noteworthy, are also the seeds for a greater partnership between the USDOE and FAU. SNMREC, leveraging its designation as an NMREC under this award, will expand these contributions for decades to come as a coordinated sustainable program that can serve the marine energy sector’s needs as they arise.

16 TIDAL AND WAVE POWER↗

Experimental Validation of a High-Temperature Test Facility for Future Additive Manufactured Supercritical Carbon Dioxide Turbine Testing

For next-generation power plants to achieve high cycle efficiencies consistent with the Department of Energy's 65% efficiency target, turbomachinery capable of operating within high-temperature power cycles must be demonstrated. Pairing additively manufactured superalloy turbines with the supercritical carbon dioxide (sCO 2 ) power cycle could enable turbine inlet temperatures approaching 1300 °C while providing flexibility in turbine cooling strategies. Development of test facilities to characterize and validate such systems is crucial. In this study, a turbine test facility capable of achieving inlet conditions of 800 °C, 11 MPa, and 0.43 kg/s while accommodating complex auxiliary cooling flow requirements has been designed and constructed to support future testing of a Haynes 282 additively manufactured 30 kW turbine-generator system with advanced cooling channels. This facility enables characterization of aerodynamic performance, leakage, and windage losses. Details of the facility's construction and operation are presented, along with experimental validation tests using an orifice as an expansion device in place of the turbine. These tests confirm that the facility can reach the required conditions, distinguish regions of achievable steady and pseudo-steady conditions, and identify the heater power required for each point in the upcoming turbine campaign. The campaign confirmed that ISO 5167-2 can reliably predict orifice mass flow rates in extreme supercritical carbon dioxide conditions with deviations of 0.5–7.5%.

42 ENGINEERING↗

TEAMER – Enhanced Flow Measurement for Aquantis Tidal Turbine Test

The AQ10 is a floating, two-bladed, passive yawing tidal turbine developed by Aquantis that has a 10-meterrotor diameter, 160 kW rating, and employs reliable off-the-shelf powertrain and power conversion hardware. Aquantis is planning on-water turbine power performance and loads (blade loading and thrust)testing, where the turbine will be pushed through still water up to 4 knots and placed in a ‘station keeping’ tow in a tidal race up to its rated speed. On-water testing will be conducted using vessels and floating platforms on the sea surface to improve ease of testing and reduce disturbance to the environment. In this TEAMER project, Pacific Northwest National Laboratory (PNNL) will conduct water velocity and turbulence measurements in front of the turbine during on-water testing using acoustic Doppler instrumentation. By measuring both the tidal current flowing past the turbine and the resulting electrical power output, test results will provide a power curve (power vs flow speed) for the turbine up to rated power. Measurements of turbulence and velocity shear in front of the rotor will also provide information to assess the structural response of the rotor blades. With this analysis, Aquantis can use the performance and loads data to validate Tidal Bladed and OpenFAST simulations of the measured operating conditions. Measuring the power performance of a prototype turbine is a valuable step to improving device development and conducting a complete power performance assessment to IEC/TS 62600-200 standards in the future.

16 TIDAL AND WAVE POWER↗

The Design of a Multiphase CO2 Turbine Test Facility

As the energy market continues to evolve with increased renewables, such as solar and wind energy, the need to balance energy demand with its availability has become increasingly more challenging. The country’s aggressive decarbonization goals in the upcoming decades will increase renewable energy market penetration, thus exacerbating the disparity between energy demand and renewable resource availability. Long-duration energy storage technologies, such as pumped thermal energy storage (PTES), are potential solutions to this challenge with high potential round-trip efficiency (RTE), no geological or geographical constraints, and low safety risks. The charge mode of a PTES system operates a heat pump cycle, converting input power to thermal energy in hot and cold reservoirs. Fundamentally, heat pumps are commonly used in daily life, but the operating conditions required by high RTE PTES systems are outside the design experience of these systems. The low-pressure side of the cycle for a supercritical CO2 (sCO2) PTES operates just above the vapor-dome and potentially drives the turbine to expand into the dome, resulting in multiphase operation in the rear stages of the turbine. This paper presents the design of the test facility for an advanced multiphase-tolerant sCO2 turbine for the heat pump of a PTES system. Heat rejection and pressure loss estimations for the multiphase sections of the test loop presented unforeseen challenges.

25 ENERGY STORAGE↗

Comparison of Thin Film Heat Flux Gauge Technologies Emphasizing Continuous-Duration Operation

Abstract Thin-film heat flux gauges (HFGs) have been used for decades to measure surface temperatures and heat flux in test turbines with the majority being used in facilities that are short-duration. These gauges are typically composed of two resistive temperature devices deposited on opposing sides of a dielectric. However, because these sensors have been traditionally applied for measurements in transient-type facilities, the challenges facing adaptation of this technology for a steady facility warrant investigation. These challenges are highlighted, and the solutions are presented throughout the paper. This paper describes the nanofabrication process for heat flux gauges and a new calibration method to address the potential deterioration of gauges over long runtimes in continuous-duration facilities. Because the primary uncertainty of these sensors arises from the ambiguity of the thermal properties, the emphasis is placed on the property determination. Also, this paper presents a discussion on the use of impulse response theory to process the data showing the feasibility of the method for steady-duration facilities after an initial settling time. The latter portion of the paper focuses on comparing well-established heat flux gauges developed for short-duration turbine test facilities to recently developed gauges fabricated using modern nanofabrication techniques for a continuous turbine test facility. The gauges were compared using the test case of an impinging jet over a range of Reynolds numbers. The comparison between the PSU gauge and the reference device indicated agreement within 14%, and similar results were achieved through comparison with established sensors from partner institutions.

Engineering↗

Comparison of Thin Film Heat Flux Gauge Technologies Emphasizing Continuous-Duration Operation

Thin film heat flux gauges (HFGs) have been used for several decades to measure surface temperatures and heat flux in test turbines with the majority being used in facilities that are short-duration. These gauges are typically composed of two resistive temperature devices deposited on opposing sides of a dielectric. However, because these sensors have been traditionally applied for measurements in short-duration, transient-type facilities, the challenges facing adaptation of this technology for a continuous-duration steady facility warrant investigation. Those challenges are highlighted, and solutions are presented throughout the paper. This paper describes the nanofabrication process for heat flux gauges and a new calibration method to address potential deterioration of gauges over long runtimes in continuous-duration facilities. Because a primary uncertainty of these sensors arises from the ambiguity of the thermal properties, special emphasis is placed on the property determination and potential errors due to improper thermal properties. Also, this paper presents a discussion on the use of impulse response theory to process the data showing the feasibility of the method for steady-duration facilities after an initial settling time. The latter portion of the paper focuses on comparing well-established heat flux gauges developed for short-duration turbine test facilities to recently developed gauges fabricated using modern nanofabrication techniques for a continuous turbine test facility. Using a commercially available heat flux gauge, capable of measuring a steady heat flux as a reference, the gauges were compared using the test case of an impinging jet over a range of Reynolds numbers. The comparison between the PSU gauge and the reference device indicated agreement within 14%, and similar results were achieved through comparison with established sensors from partner institutions.

20 FOSSIL-FUELED POWER PLANTS↗

Characterizing the Influence of Abstraction in Full-Scale Wind Turbine Nacelle Testing

In recent years, there has been a growing interest in full-scale wind turbine nacelle testing to complement individual component testing. As a result, several wind turbine nacelle test benches have been built to perform such testing with the intent of loading the integrated components as they are in the field. However, when mounted on a test bench the nacelle is not on the top of a tower and does not have blades attached to it - this is a form of abstraction. This paper aims to quantify the influence of such an abstraction on the dynamic response of the nacelle through a series of simulation case studies. The responses of several nacelle components are studied including the main bearing, main shaft, gearbox supports, generator, and yaw bearing interface. Results are presented to highlight the differences in the dynamic response of the nacelle caused by the abstraction. Additionally, the authors provide recommendations for mitigating the effects of the abstraction.

17 WIND ENERGY↗

1:52 Scale Testing of the First US Commercial Scale Floating Wind Turbine, VolturnUS: Testing Overview and the Evolution of Scale Model Testing Methods

Over the past 6 years, the University of Maine (UMaine) has been an active contributor in research and scale-model testing of floating offshore wind turbines (FOWTs). This paper serves to share the evolution of UMaine’s scale-model testing pedigree by exploring the various test campaigns at a high level, culminating with the design validation of the VolturnUS floating platform. These model test campaigns have each provided key insights into the behavior of FOWT platforms as well as improving the ability to perform model tests of FOWTs. In 2011, the UMaine-led DeepCwind Consortium carried out 1/50-scale model tests of a generic tension leg platform (TLP), a semi-submersible (semi), and a spar-buoy (spar) floating platform at the Maritime Research Institute Netherlands (MARIN) test facility. The designs were Froude-scaled and supported a scaled version of the 5-MW National Renewable Energy Laboratory (NREL) offshore research turbine. Data from these tests has been used extensively for numerical simulation validation efforts using NREL’s computer-aided engineering software FAST and laid the foundation for UMaine’s design efforts on VolturnUS. In 2013, UMaine conducted another test campaign at MARIN using the original semi-submersible from 2011 with an improved turbine as well as a 1:50-scale model of the VolturnUS concrete semi-submersible design. The improved DeepCwind semi-submersible data is currently being utilized in the validation of a large number of other analysis codes as part of the International Energy Agency’s OC5 project. In 2015, UMaine opened its own Wind/Wave test facility, the Alfond Wind/Wave Ocean Engineering Laboratory (W2). Utilizing this new facility, UMaine tested the 1:50-scale model DeepCwind semi-submersible, repeating the tests from MARIN, to validate the experimental equipment and procedures as well as demonstrate the capability of the W2. In 2016 UMaine carried out testing of a 1:52-scale model of the 100% design of the VolturnUS with a 6-MW topside as a final design validation to support the US Department of Energy-supported, full-scale Aqua Ventus demonstration project scheduled to be connected to the grid in 2019. A newly designed 6-MW scale model turbine was used in this test and the performance-matched turbine design methodology is described. Selected results from the test campaign and preliminary numerical comparisons are discussed as well as key lessons learned from the model test campaigns are presented.

17 WIND ENERGY↗

Clemson University Wind Turbine Drivetrain Test Facility

In November of 2009, Clemson University was awarded a competitive grant from the U.S. Department of Energy to design, build and operate a facility for full-scale, highly accelerated mechanical testing of next-generation wind turbine drivetrain technologies. The primary goal of the project was to design, construct, commission, and operate a state-of-the-art sustainable facility that permits full-scale highly accelerated testing of advanced drivetrain systems for large wind turbines. The secondary goal was to meet the objectives of the American Recovery and Reinvestment Act of 2009, especially in job creation, and provide a positive impact on economically distressed areas in the United States, and preservation and economic recovery in an expeditious manner. The project was executed according to a managed cooperative agreement with the Department of Energy and was an extraordinary success. The resultant new facility is located in North Charleston, SC, providing easy transportation access by rail, road or ship and operates on an open access model such that it is available to the U.S. Wind Industry for research, analysis, and evaluation activities. The 72 m by 97 m facility features two mechanical dynamometer test bays for evaluating the torque and blade dynamic forces experienced by the rotors of wind turbine drivetrains. The dynamometers are rated at 7.5 MW and 15 MW of low speed shaft power and are configured as independent test areas capable of simultaneous operation. All six degrees of freedom, three linear and three rotational, for blade and rotor dynamics are replicated through the combination of a drive motor, speed reduction gearbox and a controllable hydraulic load application unit (LAU). This new LAU setup readily supports accelerated lifetime mechanical testing and load analysis for the entire drivetrain system of the nacelle and easily simulates a wide variety of realistic operating scenarios in a controlled laboratory environment. The development of these two dynamometer test rigs is the first significant achievement for the project. These test rigs embody a new manner of test due to the system configuration and completely new design with a free floating loading hub in the LAU. This project provided the catalyst for the advancement to this new test rig configuration that has been adopted by every significant wind turbine test rig constructed since the inception of this project. There are currently two different vendors supplying these new systems. Catalyzing this new design is the second major success of the project. With the increased market penetration of wind energy over the past decade, many regions and countries have developed specific electrical grid specifications and performance codes for large wind farms to ensure operational reliability and stability. These grid codes provide requirements for interconnection with the grid during low or high voltage phenomena, typically encountered during and after system fault events. Given the installed infrastructure of the Wind Turbine Drivetrain Testing Facility (WTDTF), a natural expansion of facility capability was to include the necessary equipment for performing fault ride-through evaluations of wind turbines to the Low Voltage Ride Through (LVRT) codes. Once the decision was made to expand the scope of the original grant into fault ride-through testing, it was clear that there are several markets, not just wind, which could benefit from this type of test and that simple fault ride-through testing could be extended into a broader scope of electrical testing capabilities. It was at this point that Clemson University was awarded a second grant to build a 15 MW Hardware-In-the-Loop (HIL) Grid Simulator in order to establish world class electrical testing capabilities to compliment the mechanical testing at the WTDTF. This third significant achievement resulted in the 15 MW HIL Grid Simulator as the corner stone of the Duke Energy eGRID Center and is collocated with the WTDTF in the SCE&G Energy Innovation Center at the new Facility in North Charleston, SC, USA. Before the eGRID was completed, it was recognized that the ability to test solar farm equipment was but a small step away thru the addition of enhanced equipment to provide for DC testing. In yet another expansion/success, a 2.5 MW rectifier system was designed and implemented by Clemson staff to enhance the Center’s capabilities. The program required over 250,000 man-hours of on-site construction labor reworking the brownfield facility on the former Navy Base, clearly satisfying one of the major goals of the Reinvestment Act. This was done while winning numerous awards for design and construction of the facility, including the Top US Project for 2014 from the Trade Journal Engineering News Record. The project was a major collaborative developmental activity managed by Clemson University staff that involved the DOE and many partners and organizations.

17 WIND ENERGY↗

UMAINE – DEEPCWIND/OC4 SEMI FLOATING WIND TURBINE REPEAT TESTS

End of March 2013, University of Maine (UMaine) commissioned MARIN to perform repeat model tests on the 5MW DeepCwind/OC4 semi-submersible floating offshore wind turbine concept. The primary objective of these tests is to assess the influence of using MARIN’s stock wind turbine and additionally a dynamic blade pitch controller (for a selected number of tests) on previously obtained results, by repeating tests from the previous test campaign (MARIN project No. 24602) with the existing floater model. The floater consists of a 4-column semi-submersible (1 centre column and 3 outer columns) with 20 m draft and 3 catenary mooring lines, and supports a tower with a rotor and the nacelle on top. The total structure will be subjected to operational and extreme waves and wind loads, at a water depth of 200 m.

Helder, J. A.↗

IFT&E Industry Report: Wind Turbine-Radar Interference Test Summary

Wind turbines have grown in size and capacity with today's average turbine having a power capacity of around 1.9 MW, reaching to heights of over 495 feet from ground to blade tip, and operating with speeds at the tip of the blade up to 200 knots. When these machines are installed within the line-of-sight of a radar system, they can cause significant clutter and interference, detrimentally impacting the primary surveillance radar (PSR) performance. The Massachusetts Institute of Technology's Lincoln Laboratory (MIT LL) and Sandia National Laboratories (SNL) were co-funded to conduct field tests and evaluations over two years in order to: I. Characterize the impact of wind turbines on existing Program-of-Record (POR) air surveillance radars; II. Assess near-term technologies proposed by industry that have the potential to mitigate the interference from wind turbines on radar systems; and III. Collect data and increase technical understanding of interference issues to advance development of long-term mitigation strategies. MIT LL and SNL managed the tests and evaluated resulting data from three flight campaigns to test eight mitigation technologies on terminal (short) and long-range (60 nmi and 250 nmi) radar systems. Combined across the three flight campaigns, more than 460 of hours of flight time were logged. This paper summarizes the Interagency Field Test & Evaluation (IFT&E) program and publicly- available results from the tests. It will also discuss the current wind turbine-radar interference evaluation process within the government and a proposed process to deploy mitigation technologies.

Karlson, Benjamin↗

U.S. Department of Energy Collegiate Wind Competition 2025 Rules - Phase 1

The U.S. Department of Energy (DOE) Wind Energy Technologies Office's (WETO) Collegiate Wind Competition (CWC, also referred to as the "Competition" in this rules document) invites interdisciplinary teams of undergraduate students from a variety of academic programs to solve complex wind energy challenges. Through the competition, WETO intends to offer students direct industry experience, valuable exposure to wind energy career pathways, and greater knowledge of wind energy's potential to contribute to a clean energy future. The competition will select up to 35 teams to start, making them eligible to compete for a cash prize pool of up to $280,000 . Each year, the competition identifies a new challenge and set of activities that address real-world research questions, thus demonstrating skills that students will need to work in the wind or wider renewable energy industries. The Collegiate Wind Competition 2025 challenge requires participants to compete simultaneously in four contests: 1) Turbine Prototype Contest: Design, build, and present a unique, wind-driven power system based on market research; 2) Turbine Testing Contest: Test the wind turbine in a competition wind tunnel at the final event; 3) Project Development Contest: Research wind resource data, transmission infrastructure, and environmental factors to create a site plan and financial analysis for a hypothetical wind farm; and Connection Creation Contest: Partner with wind industry professionals, raise awareness of wind energy in your local community, and work with local media to promote your team's accomplishments. The competition does not prescribe a power system market or wind regime. It is expected that each team will participate in all four contests.

collegiate wind competition↗

U.S. Department of Energy Collegiate Wind Competition 2025: Rules - Phases 2 and 3

The U.S. Department of Energy (DOE) Wind Energy Technologies Office's (WETO) Collegiate Wind Competition (CWC, also referred to as the "competition" in this rules document) invites interdisciplinary teams of undergraduate students from a variety of academic programs to solve complex wind energy challenges. Through the competition, WETO intends to offer students direct industry experience, valuable exposure to wind energy career pathways, and greater knowledge of wind energy's potential to contribute to a clean energy future. The competition will select up to 35 teams to start, making them eligible to compete for a cash prize pool of up to $280,000. Each year, the competition identifies a new challenge and set of activities that address real-world research questions, thus demonstrating skills that students will need to work in the wind or wider renewable energy industries. The Collegiate Wind Competition 2025 challenge requires participants to compete simultaneously in four contests: 1) Turbine Design Contest: Design, build, and present a unique, wind-driven power system. 2) Turbine Testing Contest: Test the wind turbine in a competition wind tunnel at the final event. 3) Project Development Contest: Research wind resource data, transmission infrastructure, and environmental factors to create a site plan and financial analysis for a hypothetical wind farm. 4) Connection Creation Contest: Partner with wind industry professionals, raise awareness of wind energy in your local community, and work with local media to promote your team's accomplishments. The competition does not prescribe a power system market or wind regime. It is expected that each team will participate in all four contests.

Collegiate Wind Competition↗

Assessing and Testing Hydrokinetic Turbine Performance and Effects on Open Channel Hydrodynamics: An Irrigation Canal Case Study.

Hydrokinetic energy from flowing water in open channels has the potential to support local electricity needs with lower regulatory or capital investment than impounding water with more conventional means. MOU agencies involved in federal hydropower development have identified the need to better understand the opportunities for hydrokinetic (HK) energy development within existing canal systems that may already have integrated hydropower plants. This document provides an overview of the main considerations, tools, and assessment methods, for implementing field tests in an open-channel water system to characterize current energy converter (CEC) device performance and hydrodynamic effects. It describes open channel processes relevant to their HK site and perform pertinent analyses to guide siting and CEC layout design, with the goal of streamlining the evaluation process and reducing the risk of interfering with existing uses of the site. This document outlines key site parameters of interest and effective tools and methods for measurement and analysis with examples drawn from the Roza Main Canal, in Yakima, WA to illustrate a site application.

13 HYDRO ENERGY↗