Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “transport trailer”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Tractor Trailer, Transport

This process includes all inputs for the transportation for 1 kg of cargo. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=EF232BBB-5933-4286-BDC6-93E41C5E10DB

42 ENGINEERING↗

CH Packaging Operations Manual

This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing Shielded Container Payload Assembly; 1.7, Preparing SWB Payload Assembly; and 1.8, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence, except as noted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations Manual (Rev. 10)

This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing Shielded Container Payload Assembly; 1.7, Preparing SWB Payload Assembly; and 1.8, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence, except as noted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations Manual (Rev. 10.1)

This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing Shielded Container Payload Assembly; 1.7, Preparing SWB Payload Assembly; and 1.8, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence, except as noted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tractor Trailer Biomass Transport, Class 8B, Operation

Transport of an unspecified type of prepared biomass via tractor trailer to the energy conversion facility. Assumes backhaul and front haul have different energy intensities. Includes diesel consumption. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=B54B9DCD-B084-4889-885B-8101E3A5803E

09 BIOMASS FUELS↗

Pre-Conceptual Design of a Fluoride-Salt-Cooled Small Modular Advanced High Temperature Reactor (SmAHTR)

This document presents the results of a study conducted at Oak Ridge National Laboratory during 2010 to explore the feasibility of small modular fluoride salt-cooled high temperature reactors (FHRs). A preliminary reactor system concept, SmATHR (for Small modular Advanced High Temperature Reactor) is described, along with an integrated high-temperature thermal energy storage or salt vault system. The SmAHTR is a 125 MWt, integral primary, liquid salt cooled, coated particle-graphite fueled, low-pressure system operating at 700 C. The system employs passive decay heat removal and two-out-of-three , 50% capacity, subsystem redundancy for critical functions. The reactor vessel is sufficiently small to be transportable on standard commercial tractor-trailer transport vehicles. Initial transient analyses indicated the transition from normal reactor operations to passive decay heat removal is accomplished in a manner that preserves robust safety margins at all times during the transient. Numerous trade studies and trade-space considerations are discussed, along with the resultant initial system concept. The current concept is not optimized. Work remains to more completely define the overall system with particular emphasis on refining the final fuel/core configuration, salt vault configuration, and integrated system dynamics and safety behavior.

small modular fluoride salt high temperature react↗

Hanford Immobilized Low-Activity Waste Transportation System Testing Results - 20043

The immobilized low-activity waste (ILAW) transportation system is a first-of-a-kind system that is being designed and tested to transport ILAW glass-filled containers from Hanford's Waste Treatment and Immobilization Plant (WTP) Low-Activity Waste (LAW) Facility to the Integrated Disposal Facility (IDF) burial trench for permanent disposal. A prototype design and fabrication of one transport trailer and four engineered ILAW pallets was completed in mid-2018. Prototype qualification testing to verify adequacy of the design was completed in 2019 by Washington River Protection Solutions (WRPS) and affiliate ATKINS SNC-Lavalin Group. Prototype testing was completed to advance design maturation across all operational and facility interfaces, and under adverse environmental and operating conditions, including thermal assessment of the system at peak projected temperatures. Test design, observation, and feedback was well represented and supported by all ILAW Transportation System interfacing organizations: WTP constructor Bechtel National, Inc.; IDF operator CH2M (CHPRC); transportation contractor Mission Support Alliance (MSA); the U. S. Department of Energy Richland Operations Office (DOE/RL) and Office of River Protection (DOE/ORP); and Washington State Department of Ecology. This paper presents the results of prototype qualification testing and opportunities for design improvements based on testing. Changes to the final design as a result of prototype testing include improvements in safety, ergonomics, operational flexibility, and As-Low-As-Reasonably-Achievable (ALARA) applications. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Positive fast sealing union connections

Union connections are designed for connecting high pressure flexible hoses from gas storage manifolds to gas transport trailers. Connection uses O ring seals which can be quickly assembled and disassembled without use of wrenches, and which do not twist hose. Worn or damaged O rings are easily replaced.

Kleber, C. M.↗

Generic Propellants Transfer Unit (GPTU)

The Generic Propellants Transfer Unit (GPTU) is being designed to support spacecraft liquid propellant operations at the Kennedy Space Center (KSC) and Eastern Test Range (ETR). The GPTU will have a 500 gallon capacity and be Department Of Transportation (DOT) approved for over-the-road transportation of hypergolic propellants. The use of these containers will allow the users to increase efficiency and reduce the following costs: design/construction, transportation (to/from the launch site), propellant transfer operations, and decontamination operations. The user also acquires the flexibility of transporting to an offsite location for processing or storage without obtaining special exemptions or permits. These containers will incorporate their own quantity gaging and temperature sensing systems, and be integrated onto a transport trailer which contains work platforms and a fluid transfer system.

Cook, Christopher A.↗

Techno-economic analysis of conventional and advanced high-pressure tube trailer configurations for compressed hydrogen gas transportation and refueling

Transporting compressed gaseous hydrogen in tube trailers to hydrogen refueling stations (HRSs) is an attractive economic option in early fuel cell electric vehicle (FCEV) markets. This study examines conventional (Type I, steel) and advanced (Type IV, composite) high-pressure tube trailer configurations to identify those that offer maximum payload and lowest cost per unit of deliverable payload under United States Department of Transportation (DOT) size and weight constraints. The study also evaluates the impacts of various tube trailer configurations and payloads on the transportation and refueling cost of hydrogen under various transportation distance and HRS capacity scenarios. Composite tube trailers can transport large hydrogen payloads, up to 1100 kg at 7300 psi (500 bar) working pressure, while steel tube trailer configurations are limited by DOT weight regulations and may transport a maximum hydrogen payload of approximately 270 kg. Using steel pressure vessels to transport hydrogen at high pressure is counterproductive because of the rapid increase in vessel weight with wall thickness. The most economic composite tube trailer configuration includes 30-inch-diameter vessels packed in a 3 x 3 array. A linear relationship between the deliverable payload and the capital cost of a composite tube trailer has been developed for configurations with the lowest cost-per-unit payload. The capital cost is approximately $1100 per kg of deliverable hydrogen payload. Considering the entire delivery pathway (including refueling), tube trailer configurations with smaller vessels packed in greater numbers enable higher payload delivery and lower delivery cost in terms of $/kg H-2, when delivering hydrogen over longer distances to large stations. Selection of the appropriate tube trailer configuration and corresponding hydrogen payload can reduce hydrogen delivery cost by up to 16%. (C) 2018 Hydrogen Energy Publications LLC. Published by Elsevier Ltd. All rights reserved.

composite tubes↗

CNS 10-160B RH Cask Program Guidance (Rev. 2)

The purpose of this document is to provide guidelines and to define responsibilities for use, operation, inspection, and maintenance of the 10-160B cask and directly related components used for shipments of DOE controlled TRU waste. This document complies with the minimum requirements specified in the Safety Analysis Report (SAR) for Model 10-160B Type B Radwaste Shipping Cask and U.S. Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9204. In the event of a conflict between this document and the SAR or C of C, the C of C shall govern.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SLUDGE TREATMENT PROJECT COST COMPARISON BETWEEN HYDRAULIC LOADING AND SMALL CANISTER LOADING CONCEPTS

The Sludge Treatment Project (STP) is considering two different concepts for the retrieval, loading, transport and interim storage of the K Basin sludge. The two design concepts under consideration are: (1) Hydraulic Loading Concept - In the hydraulic loading concept, the sludge is retrieved from the Engineered Containers directly into the Sludge Transport and Storage Container (STSC) while located in the STS cask in the modified KW Basin Annex. The sludge is loaded via a series of transfer, settle, decant, and filtration return steps until the STSC sludge transportation limits are met. The STSC is then transported to T Plant and placed in storage arrays in the T Plant canyon cells for interim storage. (2) Small Canister Concept - In the small canister concept, the sludge is transferred from the Engineered Containers (ECs) into a settling vessel. After settling and decanting, the sludge is loaded underwater into small canisters. The small canisters are then transferred to the existing Fuel Transport System (FTS) where they are loaded underwater into the FTS Shielded Transfer Cask (STC). The STC is raised from the basin and placed into the Cask Transfer Overpack (CTO), loaded onto the trailer in the KW Basin Annex for transport to T Plant. At T Plant, the CTO is removed from the transport trailer and placed on the canyon deck. The CTO and STC are opened and the small canisters are removed using the canyon crane and placed into an STSC. The STSC is closed, and placed in storage arrays in the T Plant canyon cells for interim storage. The purpose of the cost estimate is to provide a comparison of the two concepts described.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Multicomputer communication system

A local area network is provided for a plurality of autonomous computers which operate at different rates and under different protocols coupled by network bus adapters to a global bus. A host computer (HC) divides a message file to be transmitted into blocks, each with a header that includes a data type identifier and a trailer. The associated network bus adapter (NBA) then divides the data into packets, each with a header to which a transport header and trailer is added with frame type code which specifies one of three modes of addressing in the transmission of data, namely a physical address mode for computer to computer transmission using two bytes for source and destination addresses, a logical address mode and a data type mode. In the logical address mode, one of the two addressing bytes contains a logical channel number (LCN) established between the transmitting and one or more receiving computers. In the data type mode, one of the addressing bytes contains a code identifying the type of data.

Agrawal, A. K.↗

Modular Controllable Transformers (MCT)

Large Power Transformers (LPTs) are at the heart of the electricity infrastructure and are critical pieces in today’s grid. Aging assets, long turn-around times, transportation delays and dependence on foreign manufacturing for these components have created conditions for points of failure across the system. Moreover, there is no available dynamic control on these passive sections of the grid. For all the automation embedded on the low voltage side of the low voltage side of the system there is absolutely no flexibility on the high voltage side. Changes in power flow patterns are brought about by altering dispatch patterns for generators which requires a coordinated effort and is often time consuming. Traditional FACTS based approaches such as UPFC or HVDC light involve massive modifications to the existing infrastructure. Recent instances of physical attacks on LPTs and the slow recovery process associated with fixing or replacing these damaged units has created an increased awareness for this issue. LPT designs are highly customized owing to specific field requirements. Long lead times coupled with transportation delays make procuring and installing LPTs a lengthy process. In an attempt to minimize the recovery time following an LPT failure, transformer manufacturers have developed mobile transformer units. These units typically consist of either a single-phase or three-phase transformer mounted on a truck and characterized by compact form factors. By reducing the assembly time and transport time these units offer a fast and temporary solution to LPT failures. Several efforts led by DOE, Edison Electric Company (EEI) and North American Electric Reliability Corporation (NERC) have led to the RecX program. RecX transformers consist of single phase transformers transported on specialized assemblies to enable fast restoration and minimal installation time. NERC and EEI have instituted transformer sharing programs like Spare Equipment Database (SED) as well as Spare Transformer Equipment Database (STEP) which encourage utilities to maintain and share a fleet of LPTs. Mobile transformers are typically limited to less than 100 MVA to enable transportation on a trailer. Also, the efficiency of mobile transformer units and RecX transformers is lower since they are temporary solutions. The ideal replacement solution would be one that could utilize a set of standardized transformers while incorporating flexibility to influence metrics like power flow, apparent impedance and voltage profiles. In view of these issues the team at Georgia Tech proposed a concept called Modular Controllable Transformers (MCTs). This project was commissioned as a part of DOE’s Transformer Resiliency and Advance Component (TRAC) program. The approach consists of splitting one large unit rated upwards of 100 MVA with smaller modular, standardized units. Each of these smaller units are augmented with a converter to add power flow, voltage and impedance control. Splitting the power level into multiple units has two important implications. By making smaller units, the transportation times can be reduced drastically. Moreover, even though these units have very specific impedance and other parameters, the augmented converters can make it emulate the unit being replaced. Thus, faster replacement times and added controls are achieved making this an extremely resilient approach. In the event of one modular units failure, the other two controllable units can operate in the most resilient fashion keeping the net system overloads to a minimum. Moreover, for the same probability of failure only a fraction of the system capacity is lost. The converter is augmented on to the tertiary winding of the transformer making it retrofittable in the field without massive modifications to the system. The material proposed in this report highlights design considerations to minimize recovery time as well as results displaying overall improvement in resiliency. The cost analysis of this approach shows significant savings compared to UPFC and HVDC lite based approaches. Extensive analysis was conducted on numerous aspects of this project over the course of this project. Simulation studies were conducted to prove the 5MVA converter design. Challenging BIL constraints and transient issues were addressed over the course of this project. Simulations on EMTP platform presented in consequent sections were used to finely tune the control for the same. A final design for a back-to-back 5MVA neutral-point-clamped (NPC) converter was completed in this project. Furthermore, switching components like high power IGBTs from IXYS Westcode Press-Pack series and ABB Stackpack series were identified for this application. These devices exhibit a blocking voltage of 6.5 kV and a nominal collector current of 900 A. Potential housing options as well as existing commercial option were identified for this converter design. A 56 MVA modular transformer unit was designed with Delta Star Inc. with consultation and inputs from all project members. The transformer cooling systems were chosen to be Oil Natural Air Forced (ONAF) to optimize ease of transport. A full Product Requirement Document (PRD) for the converter and the transformer was generated. The team also investigated key aspects of resiliency and how to quantify the same. A metric was developed to analyze resiliency and numerous simulation cases were presented. Increased (N-1) resiliency and outage resistance was showcased through simulation on the Texas Large scale power system. Dynamic control capabilities were also showcased on numerous system level simulations. An IEEE 30 bus system was used to show the ability of the MCT approach to reduce line congestion. Power flow control; a part of the MCTs abilities, showcased a 29% reduction in transformer loading on the same system. Full control over tie line flows was demonstrated on a modified IEEE 13 bus system. Dynamic LTC capabilities were shown through simulation and were compared to traditional LTCs. Furthermore, the ability of the MCTs to alter apparent transformer impedance was simulated to promote standardization of modular transformer units while retaining the ability to emulate a varied range of impedance characteristics. Thus granular control over power flow, voltages, impedances and was presented. Regulatory analysis conducted by Oak Ridge National Laboratory (ORNL) further bolstered the efficacy of the MCT approach and verified the added resiliency achieved due to this approach. As a conclusion, it was proved that the resilience improvement obtained from using the MCT approach is justified by just one failure in a 30-year period. This means that the benefits obtained from using the MCT approach far outweigh the cost of setting this approach up. As a part of the future efforts, the team is proposing building a (12.47-24) kV/400 kVA scaled down unit to control 5MVA of power flows. Emphasis would be laid on using commercial components to speed up the build of these units. Further the actual transport of the modular transformer unit would be a part of this operation and would provide insight into transportation issues. The approach shows much promise and adds key dynamic control on passive sub transmission and transmission sectors.

24 POWER TRANSMISSION AND DISTRIBUTION↗

American Recovery & Reinvestment Act: Fuel Cell Hybrid Power Packs and Hydrogen Refueling for Lift Trucks

HEB Grocery Company, Inc. (H-E-B) is a privately-held supermarket chain with 310 stores throughout Texas and northern Mexico. H-E-B converted 14 of its lift reach trucks to fuel cell power using Nuvera Fuel Cells’ PowerEdge™ units to verify the value proposition and environmental benefits associated with the technology. Issues associated with the increasing power requirements of the distribution center operation, along with high ambient temperature in the summer and other operating conditions (such as air quality and floor surface condition), surfaced opportunities for improving Nuvera’s PowerEdge fuel cell system design in high-throughput forklift environments. The project included on-site generation of hydrogen from a steam methane reformer, called PowerTap™ manufactured by Nuvera. The hydrogen was generated, compressed and stored in equipment located outside H-E-B’s facility, and provided to the forklifts by hydrogen dispensers located in high forklift traffic areas. The PowerEdge fuel cell units logged over 25,300 operating hours over the course of the two-year project period. The PowerTap hydrogen generator produced more than 11,100 kg of hydrogen over the same period. Hydrogen availability at the pump was 99.9%. H-E-B management has determined that fuel cell forklifts help alleviate several issues in its distribution centers, including truck operator downtime associated with battery changing, truck and battery maintenance costs, and reduction of grid electricity usage. Data collected from this initial installation demonstrated a 10% productivity improvement, which enabled H-E-B to make economic decisions on expanding the fleet of PowerEdge and PowerTap units in the fleet, which it plans to undertake upon successful demonstration of the new PowerEdge reach truck product. H-E-B has also expressed interest in other uses of hydrogen produced on site in the future, such as for APUs used in tractor trailers and refrigerated transport trucks in its fleet.

08 HYDROGEN↗

Eligibility Assessment of Items in the TA-60 Rack Assembly and Alignment Complex Legacy Storage Yard

The U.S. Department of Energy, National Nuclear Security Administration, Los Alamos Field Office (NA-LA), documented and evaluated seven structures in the Technical Area 60 (TA-60) Rack Assembly and Alignment Complex (RAAC) legacy storage yard at Los Alamos National Laboratory (LANL or Laboratory) for listing in the National Register of Historic Places (National Register). This documentation and evaluation was conducted in compliance with Section 106 of the National Historic Preservation Act of 1966, as amended; the Code of Federal Regulations (36 CFR 800); the Programmatic Agreement among the U.S. Department of Energy, National Nuclear Security Administration, Los Alamos Field Office, the New Mexico State Historic Preservation Office and the Advisory Council on Historic Preservation Concerning Management of the Historic Properties at Los Alamos National Laboratory, Los Alamos New Mexico (PA)1; and A Plan for the Management of the Cultural Heritage at Los Alamos National Laboratory, New Mexico (LANL’s Cultural Resources Management Plan (2017). NA-LA makes the following National Register eligibility determinations: la cuna; the rack transporter (jeep, rack trailer, and steering dolly); the Mexia diagnostic rack; the Mexia device canister; the Mexia device mounting stand; and the Mexia target stand are eligible for listing in the National Register, and the second steering dolly is not eligible for listing in the National Register. This National Register evaluation was completed because LANL proposes to develop a consolidated waste facility in TA-60 next to the former RAAC. Across 3.56 acres, LANL proposes to construct an 8,000-square-foot, pre-engineered waste storage building; a 1,500-square-foot office/warehouse building; and 28,500 square feet of covered storage. The development will also include access control features and fencing, parking spaces, and utilities. Additionally, the Laboratory will continue to use the southern part of TA-60-0017 and reuse TA-60-0086 and TA-60-0324 in the development. The consolidated waste facility will operate as a central accumulation area—storing universal waste, mixed low-level (radioactive) waste, hazardous chemicals, and New Mexico special waste—until the waste can be shipped off site.

99 GENERAL AND MISCELLANEOUS↗

Torque Tube Stiffens Trailer Frame

Trailer frame incorporates longitudinal torque tube absorbing torsional loads and stiffening trailer. Used to transport large cylindrical objects like pressure vessels, tanks, and rocket engines without subjecting them to damage or excessive loads.

Macmartin, Malcolm J.↗

New Advanced Source Identification Algorithm (ASIA-NEW) for radiation monitors with plastic detectors

Radiation Portal Monitors (RPM) with plastic detectors represent the main instruments used for primary border (customs) radiation control. RPM are widely used because they are simple, reliable, relatively inexpensive and have a high sensitivity. However, experience using the RPM in various countries has revealed the systems have some grave shortcomings. There is a dramatic decrease of the probability of detection of radioactive sources under high suppression of the natural gamma background (radiation control of heavy cargoes, containers and, especially, trains). NORM (Naturally Occurring Radioactive Material) existing in objects under control trigger the so-called 'nuisance alarms', requiring a secondary inspection for source verification. At a number of sites, the rate of such alarms is so high it significantly complicates the work of customs and border officers. This paper presents a brief description of new variant of algorithm ASIA-New (New Advanced Source Identification Algorithm), which was developed by the authors and based on some experimental test results. It also demonstrates results of different tests and the capability of a new system to overcome the shortcomings stated above. New electronics and ASIA-New enables RPM to detect radioactive sources under a high background suppression (tested at 15-30%) and to verify the detected NORM (KCl) and the artificial isotopes (Co-57, Ba-133 and other). New variant of ASIA is based on physical principles and does not require a lot of special tests to attain statistical data for its parameters. That is why this system can be easily installed into any RPM with plastic detectors. This algorithm was tested for 1,395 passages of different transports (cars, trucks and trailers) without radioactive sources. It also was tested for 4,015 passages of these transports with radioactive sources of different activity (Co-57, Ba-133, Cs-137, Co-60, Ra-226, Th-232) and these sources masked by NORM (K-40) as well. (authors)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗