Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “time service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Hybrid Imitation Learning for Real-Time Service Restoration in Resilient Distribution Systems

Self-healing capability is a critical factor for a resilient distribution system, which requires intelligent agents to automatically perform service restoration online, including network reconfiguration and reactive power dispatch. Here, the article proposes the imitation learning framework for training such an agent, where the agent will interact with an expert built based on the mixed-integer program to learn its optimal policy, and therefore significantly improve the training efficiency compared with exploration-dominant reinforcement learning (RL) methods. This significantly improved training efficiency makes the training problem under N-k scenarios tractable. A hybrid policy network is proposed to handle tie-line operations and reactive power dispatch simultaneously to further improve the restoration performance. The 33-bus and 119-bus systems with N-k disturbances are employed to conduct the training. The results indicate that the proposed method outperforms traditional RL algorithms such as the deep-Q network.

42 ENGINEERING↗

Time-Constrained Capacitated Vehicle Routing Problem in Urban E-Commerce Delivery

Electric vehicle routing problems can be particularly complex when recharging must be performed mid-route. In some applications, such as e-commerce parcel delivery truck routing, however, mid-route recharging may not be necessary because of constraints on vehicle capacities and the maximum allowed time for delivery. In this study, we develop a mixed-integer optimization model that exactly solves such a time-constrained capacitated vehicle routing problem, especially of interest for e-commerce parcel delivery vehicles. We compare our solution method with an existing metaheuristic and carry out exhaustive case studies considering four U.S. cities—Austin, TX; Bloomington, IL; Chicago, IL; and Detroit, MI—and two vehicle types: conventional vehicles and battery electric vehicles (BEVs). In these studies we examine the impact of vehicle capacity, maximum allowed travel time, service time (dwelling time to physically deliver the parcel), and BEV range on system-level performance metrics, including vehicle miles traveled (VMT). We find that the service time followed by the vehicle capacity plays a key role in the performance of our approach. We assume an 80-mi BEV range as a baseline without mid-route recharging. Our results show that the BEV range has a minimal impact on performance metrics because the VMT per vehicle averages around 72 mi. In a case study for shared-economy parcel deliveries, we observe that VMT could be reduced by 38.8% in Austin if service providers were to operate their distribution centers jointly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Endogeneity of pedestrian survival time and emergency medical service response time: Variations across disadvantaged and non-disadvantaged communities

The Vision Zero-Safe Systems Approach prioritizes fast access to Emergency Medical Services (EMS) to improve the survivability of road users in transportation crashes, especially concerning the recent increase in pedestrian-involved crashes. Pedestrian crashes resulting in immediate or early death are considerably more severe than those taking longer. The time gap between injury and fatality is known as survival time, and it heavily relies on EMS response time. The characteristics of the crash location may be associated with EMS response and survival time. A US Department of Transportation initiative identifies communities often facing challenges. Six disadvantaged community (DAC) indicators, including economy, environment, equity, health, resilience, and transportation access, enable an analysis of how survival and EMS response times vary across DACs and non-DACs. To this end, this study created a unique and comprehensive database by linking DACs data with 2017–2021 pedestrian-involved fatal crashes. This study utilizes two-stage residual inclusion models with segmentation for DACs and non-DACs accounting for the endogenous relationship between EMS response and pedestrian survival time. The results indicate that EMS response time is higher and pedestrian survival time is lower in DACs than in non-DACs. A delayed EMS response time is associated with a greater reduction in survival time in DACs compared to non-DACs. Factors, e.g., nighttime and interstate crashes, contribute to higher EMS response time, while pedestrian drugs, driver speeding, and hit-and-run behaviors are associated with a greater reduction in survival time in DACs than non-DACs. Finally, the implications of the findings are discussed in the paper.

60 APPLIED LIFE SCIENCES↗

Effect of service exposure on fatigue crack propagation of Inconel 718 turbine disc material at elevated temperatures

In this study, the fatigue crack propagation behavior of Inconel 718 turbine disc with different service times from 0 to 4229 h was investigated at 738 and 823 K. No notable change in microstructural features, other than the increase in grain size, was observed with increasing service time. With increasing service time from 0 to 4229 h, the fatigue crack propagation rates tended to increase, while the ΔK{sub th} value decreased, in low ΔK regime and lower Paris' regime at both testing temperatures. The fractographic observation using a scanning electron microscope suggested that the elevated temperature fatigue crack propagation mechanism of Inconel 718 changed from crystallographic cleavage mechanism to striation mechanism in the low ΔK regime, depending on the grain size. The fatigue crack propagation mechanism is proposed for the crack propagating through small and large grains in the low ΔK regime, and the fatigue crack propagation behavior of Inconel 718 with different service times at elevated temperatures is discussed. - Highlights: • The specimens were prepared from the Inconel 718 turbine disc used for 0 to 4229 h. • FCP rates were measured at 738 and 823 K. • The ΔK{sub th} values decreased with increasing service time. • The FCP behavior showed a strong correlation with the grain size of used turbine disc.

36 MATERIALS SCIENCE↗

Multi-Time Step Service Restoration for Advanced Distribution Systems and Microgrids

Modern power systems are facing increased risk of disasters that can cause extended outages. The presence of remote control switches (RCSs), distributed generators (DGs), and energy storage systems (ESS) provides both challenges and opportunities for developing post-fault service restoration methodologies. Inter-temporal constraints of DGs, ESS, and loads under cold load pickup (CLPU) conditions impose extra complexity on problem formulation and solution. In this paper, a multi-time step service restoration methodology is proposed to optimally generate a sequence of control actions for controllable switches, ESSs, and dispatchable DGs to assist the system operator with decision making. The restoration sequence is determined to minimize the unserved customers by energizing the system step by step without violating operational constraints at each time step. The proposed methodology is formulated as a mixed-integer linear programming (MILP) model and can adapt to various operation conditions. Furthermore, the proposed method is validated through several case studies that are performed on modified IEEE 13-node and IEEE 123-node test feeders.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Methods for Service Life Time Estimation of Aluminum Reflectors

In order to reduce electricity generation costs of concentrating solar power (CSP) technologies, new low-cost reflector materials are being developed. These materials need to withstand difficult outdoor conditions without a significant loss in specular reflectance. In this work, samples of enhanced anodized aluminum reflectors protected by a sol-gel coating exposed at different weathering siteshave been analyzed with an innovative specular reflectometer and accelerated aging tests have been carried out in order to estimate the service lifetime. A new accelerated aging procedure is proposed, which consists in combining abrasion and corrosion testing.

14 SOLAR ENERGY↗

ESTIMATED SIL LEVELS AND RISK COMPARISONS FOR RELIEF VALVES AS A FUNCTION OF TIME-IN-SERVICE

Risk-based inspection methods enable estimation of the probability of spring-operated relief valves failing on demand at the United States Department of Energy's Savannah River Site (SRS) in Aiken, South Carolina. The paper illustrates an approach based on application of the Frechet and Weibull distributions to SRS and Center for Chemical Process Safety (CCPS) Process Equipment Reliability Database (PERD) proof test results. The methodology enables the estimation of ANSI/ISA-84.00.01 Safety Integrity Levels (SILs) as well as the potential change in SIL level due to modification of the maintenance schedule. Current SRS practices are reviewed and recommendations are made for extending inspection intervals. The paper compares risk-based inspection with specific SILs as maintenance intervals are adjusted. Groups of valves are identified in which maintenance times can be extended as well as different groups in which an increased safety margin may be needed.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Real-Time Discovery Services over Large, Heterogeneous and Complex Healthcare Datasets Using Schema-Less, Column-Oriented Methods

We present a service platform for schema-leess exploration of data and discovery of patient-related statistics from healthcare data sets. The architecture of this platform is motivated by the need for fast, schema-less, and flexible approaches to SQL-based exploration and discovery of information embedded in the common, heterogeneously structured healthcare data sets and supporting components (electronic health records, practice management systems, etc.) The motivating use cases described in the paper are clinical trials candidate discovery, and a treatment effectiveness analysis. Following the use cases, we discuss the key features and software architecture of the platform, the underlying core components (Apache Parquet, Drill, the web services server), and the runtime profiles and performance characteristics of the platform. We conclude by showing dramatic speedup with some approaches, and the performance tradeoffs and limitations of others.

Apache Drill Apache Parquet Column Oriented Stores↗

Energy Sector Position, Navigation, and Time Cybersecurity Profile

The Pacific Northwest National Laboratory has developed this positioning, navigation, and timing (PNT) profile for the Energy Sector at the request of the U.S. Department of Energy. The Department of Energy is the sector-specific agency for the Energy Sector and is responsible for providing guidance in the form of this PNT Profile, per Executive Order 13905, Strengthening National Resilience Through Responsible Use of Positioning, Navigation, and Timing Services (Executive Office of the President 2020) issued February 18, 2020. Executive Order 13905 directed the National Institute of Standards & Technology to develop a PNT Profile that is broadly applicable to all sectors and to serve as a foundation for sector-neutral guidance, NISTIR 8323 Foundational PNT Profile: Applying the Cybersecurity Framework for the Responsible Use of Positioning, Navigation, and Timing (PNT) Services. This document builds on NISTIR 8323 to identify and serve as the required Energy Sector specific guidance. For purposes of this PNT Profile, Energy Sector precise time is 0.5 µs (microseconds) to 1 µs accuracy. Currently, the electricity subsector has systems that use this level of precision time, but the oil and natural gas subsector currently does not. While the electricity subsector uses precision timing, it does not use positioning and/or navigation at this level of accuracy. For this reason, this PNT Profile will focus on only precise time for the electricity subsector.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multiphysics Simulation of Moisture-Graphite Oxidation in MHTGR

A small amount of moisture on the ppm level could present in the primary helium coolant under normal operations of High-Temperature Gas-cooled Reactors (HTGRs). One potential safety issue related to HTGRs is the chronic moisture-graphite oxidation, which could affect the integrity of the fuel blocks and reflectors in the reactor core, and the support columns in the hot plenum. However, it is infeasible to perform chronic moisture-graphite oxidation tests under the prototypic high-pressure, high-temperature conditions over a long period of time that is comparable to the full service time, i.e., 36 months for Modular High Temperature Gas-cooled Reactor (MHTGR). As an alternate, accelerated moisture-graphite oxidation tests at the atmospheric pressure and high moisture concentrations have been performed in the literature. Through these accelerated tests, global reaction rate equations have been proposed, which makes it possible to study the moisture-graphite oxidation numerically. This paper is aimed to establish a multiphysics model that can evaluate the moisture-graphite oxidation under MHTGR normal operation conditions. COMSOL Multiphysics was applied to couple the fluid flow, heat and mass transfer, chemical reaction and material structural changes. To reduce the calculation time, the prototypic three-dimensional (3-D) structures were simplified into a two-dimensional (2-D) simulation domain. The performance of four nuclear grades of graphite (IG-110, 2114, PCEA, and NBG-17) over a 36-month service period was then investigated under the most likely prototypic conditions of MHTGR. The simulation results indicate that most oxidation occurs in the three or four bottom fuel blocks due to their higher temperatures. In general, however, only a thin layer of 1 mm into the graphite will be considerably oxidized even for those three or four bottom fuel blocks.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

An Exact Algorithm for the Linear Tape Scheduling Problem

Magnetic tapes are often considered as an outdated storage technology, yet they are still used to store huge amounts of data. Their main interests are a large capacity and a low price per gigabyte, which come at the cost of a much larger file access time than on disks. With tapes, finding the right ordering of multiple file accesses is thus key to performance. Moving the reading head back and forth along a kilometer long tape has a non-negligible cost and unnecessary movements thus have to be avoided. However, the optimization of tape request ordering has rarely been studied in the scheduling literature, much less than I/O scheduling on disks. For instance, minimizing the average service time for several read requests on a linear tape remains an open question. Therefore, in this paper, we aim at improving the quality of service experienced by users of tape storage systems, and not only the peak performance of such systems. To this end, we propose a reasonable polynomial-time exact algorithm while this problem and simpler variants have been conjectured NP-hard. We also refine the proposed model by considering U-turn penalty costs accounting for inherent mechanical accelerations. Then, we propose a low-cost variant of our optimal algorithm by restricting the solution space, yet still yielding an accurate suboptimal solution. Finally, we compare our algorithms to existing solutions from the literature on logs of the mass storage management system of a major datacenter. This allows us to assess the quality of previous solutions and the improvement achieved by our low-cost algorithm. Aiming for reproducibility, we make available the complete implementation of the algorithms used in our evaluation, alongside the dataset of tape requests that is, to the best of our knowledge, the first of its kind to be publicly released.

Honoré, Valentin↗

Extreme-scale EV charging infrastructure planning for last-mile delivery using high-performance parallel computing

Here, this paper addresses stochastic charger location and allocation problems under queue congestion for last-mile delivery using electric vehicles (EVs). The objective is to decide where to open charging stations and how many chargers of each type to install, subject to budgetary and waiting-time constraints. We formulate the problem as a mixed-integer non-linear program, where each station-charger pair is modeled as a multiserver queue with stochastic arrivals and service times to capture the notion of waiting in fleet operations. The model is extremely large, with billions of variables and constraints for a typical metropolitan area; even loading the model in solver memory is difficult, let alone solving it. To address this challenge, we develop a Lagrangian-based dual decomposition framework that decomposes the problem by station and leverages parallelization on high-performance computing systems, where the subproblems are solved by using a cutting plane method and their solutions are collected at the master level. We also develop a three-step rounding heuristic to transform the fractional subproblem solutions into feasible integral solutions. Computational experiments on data from the Chicago metropolitan area with hundreds of thousands of households and thousands of candidate stations show that our approach produces high-quality solutions in cases where existing exact methods cannot even load the model in memory. We also analyze various policy scenarios, demonstrating that combining existing depots with newly built stations under multiagency collaboration substantially reduces costs and congestion. These findings offer a scalable and efficient framework for developing sustainable large-scale EV charging networks.

Capacity allocation↗

High-Level Waste Mechanical Sludge Removal at the Savannah River Site - F Tank Farm Closure Project

The Savannah River Site F-Tank Farm Closure project has successfully performed Mechanical Sludge Removal (MSR) using the Waste on Wheels (WOW) system for the first time within one of its storage tanks. The WOW system is designed to be relatively mobile with the ability for many components to be redeployed to multiple waste tanks. It is primarily comprised of Submersible Mixer Pumps (SMPs), Submersible Transfer Pumps (STPs), and a mobile control room with a control panel and variable speed drives. In addition, the project is currently preparing another waste tank for MSR utilizing lessons learned from this previous operational activity. These tanks, designated as Tank 6 and Tank 5 respectively, are Type I waste tanks located in F-Tank Farm (FTF) with a capacity of 2,840 cubic meters (750,000 gallons) each. The construction of these tanks was completed in 1953, and they were placed into waste storage service in 1959. The tank's primary shell is 23 meters (75 feet) in diameter, and 7.5 meters (24.5 feet) in height. Type I tanks have 34 vertically oriented cooling coils and two horizontal cooling coil circuits along the tank floor. Both Tank 5 and Tank 6 received and stored F-PUREX waste during their operating service time before sludge removal was performed. DOE intends to remove from service and operationally close (fill with grout) Tank 5 and Tank 6 and other HLW tanks that do not meet current containment standards. Mechanical Sludge Removal, the first step in the tank closure process, will be followed by chemical cleaning. After obtaining regulatory approval, the tanks will be isolated and filled with grout for long-term stabilization. Mechanical Sludge Removal operations within Tank 6 removed approximately 75% of the original 95,000 liters (25,000 gallons). This sludge material was transferred in batches to an interim storage tank to prepare for vitrification. This operation consisted of eleven (11) Submersible Mixer Pump(s) mixing campaigns and multiple intra-area transfers utilizing STPs from July 2006 to August 2007. This operation and successful removal of sludge material meets requirement of approximately 19,000 to 28,000 liters (5,000 to 7,500 gallons) remaining prior to the Chemical Cleaning process. Removal of the last 35% of sludge was exponentially more difficult, as less and less sludge was available to mobilize and the lighter sludge particles were likely removed during the early mixing campaigns. The removal of the 72,000 liters (19,000 gallons) of sludge was challenging due to a number factors. One primary factor was the complex internal cooling coil array within Tank 6 that obstructed mixer discharge jets and impacted the Effective Cleaning Radius (ECR) of the Submersible Mixer Pumps. Minimal access locations into the tank through tank openings (risers) presented a challenge because the available options for equipment locations were very limited. Mechanical Sludge Removal activities using SMPs caused the sludge to migrate to areas of the tank that were outside of the SMP ECR. Various SMP operational strategies were used to address the challenge of moving sludge from remote areas of the tank to the transfer pump. This paper describes in detail the Mechanical Sludge Removal activities and mitigative solutions to cooling coil obstructions and other challenges. The performance of the WOW system and SMP operational strategies were evaluated and the resulting lessons learned are described for application to future Mechanical Sludge Removal operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

HIGH LEVEL WASTE MECHANCIAL SLUDGE REMOVAL AT THE SAVANNAH RIVER SITE F TANK FARM CLOSURE PROJECT

The Savannah River Site F-Tank Farm Closure project has successfully performed Mechanical Sludge Removal (MSR) using the Waste on Wheels (WOW) system for the first time within one of its storage tanks. The WOW system is designed to be relatively mobile with the ability for many components to be redeployed to multiple waste tanks. It is primarily comprised of Submersible Mixer Pumps (SMPs), Submersible Transfer Pumps (STPs), and a mobile control room with a control panel and variable speed drives. In addition, the project is currently preparing another waste tank for MSR utilizing lessons learned from this previous operational activity. These tanks, designated as Tank 6 and Tank 5 respectively, are Type I waste tanks located in F-Tank Farm (FTF) with a capacity of 2,840 cubic meters (750,000 gallons) each. The construction of these tanks was completed in 1953, and they were placed into waste storage service in 1959. The tank's primary shell is 23 meters (75 feet) in diameter, and 7.5 meters (24.5 feet) in height. Type I tanks have 34 vertically oriented cooling coils and two horizontal cooling coil circuits along the tank floor. Both Tank 5 and Tank 6 received and stored F-PUREX waste during their operating service time before sludge removal was performed. DOE intends to remove from service and operationally close (fill with grout) Tank 5 and Tank 6 and other HLW tanks that do not meet current containment standards. Mechanical Sludge Removal, the first step in the tank closure process, will be followed by chemical cleaning. After obtaining regulatory approval, the tanks will be isolated and filled with grout for long-term stabilization. Mechanical Sludge Removal operations within Tank 6 removed approximately 75% of the original 95,000 liters (25,000 gallons). This sludge material was transferred in batches to an interim storage tank to prepare for vitrification. This operation consisted of eleven (11) Submersible Mixer Pump(s) mixing campaigns and multiple intraarea transfers utilizing STPs from July 2006 to August 2007. This operation and successful removal of sludge material meets requirement of approximately 19,000 to 28,000 liters (5,000 to 7,500 gallons) remaining prior to the Chemical Cleaning process. Removal of the last 35% of sludge was exponentially more difficult, as less and less sludge was available to mobilize and the lighter sludge particles were likely removed during the early mixing campaigns. The removal of the 72,000 liters (19,000 gallons) of sludge was challenging due to a number factors. One primary factor was the complex internal cooling coil array within Tank 6 that obstructed mixer discharge jets and impacted the Effective Cleaning Radius (ECR) of the Submersible Mixer Pumps. Minimal access locations into the tank through tank openings (risers) presented a challenge because the available options for equipment locations were very limited. Mechanical Sludge Removal activities using SMPs caused the sludge to migrate to areas of the tank that were outside of the SMP ECR. Various SMP operational strategies were used to address the challenge of moving sludge from remote areas of the tank to the transfer pump. This paper describes in detail the Mechanical Sludge Removal activities and mitigative solutions to cooling coil obstructions and other challenges. The performance of the WOW system and SMP operational strategies were evaluated and the resulting lessons learned are described for application to future Mechanical Sludge Removal operations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Atom Probe characterization of neutron irradiated commercial ZIRLO® and AXIOM X2® alloys

As part of the Mechanistic Understanding of ZIrconium Corrosion (MUZIC) program, this team has been instrumental to obtain EPRI and Westinghouse sponsorships to prepare the neutron irradiated ZIRLO® and X2® from Vogtle nuclear power plant and ship them from Studsvik’s (Sweden) hot cells to Idaho National Laboratory (INL) to be part of the NSUF library. The uniqueness of these sets of neutron irradiated alloys is that they are at the same two extremes of the fuel cycles, allowing us to study the microchemistry evolution as a function of irradiation doses, exposure time and solute content. Advanced commercial Zirconium-Niobium (Zr-Nb) alloys, such as ZIRLO® and AXIOM®, have been developed by Westinghouse to enhance the corrosion resistance of fuel cladding material for longer service time. This study specifically aims at investigating the neutron irradiation induced Nb redistribution in AXIOM® X2® to understand the effect of neutron irradiation induced microchemistry changes and the irradiation enhanced corrosion resistance observed in ZrNb alloys. The detailed sample information on chemical composition and irradiation is given in shown in Table 1a and 1b respectively. To study the neutron IIP/nanoclusters and Nb concentration in the solid solution, atom probe tomography (APT) is the primary tool to obtain reliable chemical information. APT specimens were prepared in shielded focused ion beam (FIB) at the Irradiated Materials Characterization Laboratory (IMCL) at INL followed by APT analysis at CAES facility using LEAP 4000XR

36 MATERIALS SCIENCE↗