Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “thermal power”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

A Reduced-Order Model of a Nuclear Power Plant with Thermal Power Dispatch

This paper presents reduced-order modeling of thermal power dispatch (TPD) from a pressurized water reactor (PWR) for providing heat to nearby heat consuming industrial processes that seek to take advantage of nuclear heat to reduce carbon emissions. The reactor model includes the neutronics of the reactor core, thermal–hydraulics of the primary coolant cycle, and a three-lump model of the steam generator (SG). The secondary coolant cycle is represented with quasi-steady state mass and energy balance equations. The secondary cycle consists of a steam extraction system, high-pressure and low-pressure turbines, moisture separator and reheater, high-pressure and low-pressure feedwater heaters, deaerator, feedwater and condensate pumps, and a condenser. The steam produced by the SG is distributed between the turbines and the extraction steam line (XSL) that delivers steam to nearby industrial processes, such as production of clean hydrogen. The reduced-order simulator is verified by comparing predictions with results from separate validated steady-state and transient full-scope PWR simulators for TPD levels between 0% and 70% of the rated reactor power. All simulators indicate that the flow rate of steam in the main steam line and turbine systems decrease with increasing TPD, which causes a reduction in PWR electric power generation. The results are analyzed to assess the impact of TPD on system efficiency and feedwater flow control. Due to the simplicity of the proposed reduced-order model, it can be scaled to represent a PWR of any size with a few parametric changes. In the future, the proposed reduced-order model will be integrated into a power system model in a digital real-time simulator (DRTS) and physical hardware-in-the-loop simulations.

08 HYDROGEN↗

Experience in connecting the power generating units of thermal power plants to automatic secondary frequency regulation within the united power system of Russia

The principles of central control of the power generating units of thermal power plants by automatic secondary frequency and active power overcurrent regulation systems, and the algorithms for interactions between automatic power control systems for the power production units in thermal power plants and centralized systems for automatic frequency and power regulation, are discussed. The order of switching the power generating units of thermal power plants over to control by a centralized system for automatic frequency and power regulation and by the Central Coordinating System for automatic frequency and power regulation is presented. The results of full-scale system tests of the control of power generating units of the Kirishskaya, Stavropol, and Perm GRES (State Regional Electric Power Plants) by the Central Coordinating System for automatic frequency and power regulation at the United Power System of Russia on September 23-25, 2008, are reported.

42 ENGINEERING↗

Thermoelectric power generator for variable thermal power source

Traditional power generation systems using thermoelectric power generators are designed to operate most efficiently for a single operating condition. The present invention provides a power generation system in which the characteristics of the thermoelectrics, the flow of the thermal power, and the operational characteristics of the power generator are monitored and controlled such that higher operation efficiencies and/or higher output powers can be maintained with variably thermal power input. Such a system is particularly beneficial in variable thermal power source systems, such as recovering power from the waste heat generated in the exhaust of combustion engines.

30 DIRECT ENERGY CONVERSION↗

Cast Components for High Temperature Concentrated Solar Power Thermal Systems

Concentrating Solar-Thermal Power (CSP) components such as piping, valves fittings are required for use at temperatures up to 800°C. These are anticipated to be made using Nickel-based alloys such as Haynes ® 230 ® , Haynes ® 282 ® , or IN ® 740H ® and can contribute significantly to the cost of a CSP Gen 3 plant. Thus, there is a significant motivation to lower the cost of materials and components so that the capital costs can be minimized. In all these cases, the cost of the component has two contributions: 1. Materials cost, and 2. Manufacturing cost. Both materials cost and manufacturing costs must be kept low to attain the lowest possible cost. Materials cost can be lowered by using materials that have the ideal combination of properties at the lowest cost. Another avenue to lower cost is chose a manufacturing process that has the potential to lower the cost. Traditionally tubes are made from billets through a wrought process and can be expensive. An alternative process to consider is the centrifugal casting process where the tube is directly fabricated from molten metal. In this case, the molten metal is poured inside a cylindrical metallic mold with an insulating layer and is spun rapidly. A wide range of sizes (diameter, wall thickness, and length) can be cast using this process. The objective of this project was to develop the process for fabricating pipes and related components using a centrifugal casting process and to measure the properties of alloys fabricated using this process.

14 SOLAR ENERGY↗

Identifying and bounding uncertainties in nuclear reactor thermal power calculations

Determination of the thermal power generated in the reactor core of a nuclear power plant is a critical element in the safe and economic operation of the plant. Direct measurement of the reactor core thermal power is made using neutron flux instrumentation; however, this instrumentation requires frequent calibration due to changes in the measured flux caused by fuel burn-up, flux pattern changes, and instrumentation drift. To calibrate the nuclear instruments, steam plant calorimetry, a process of performing a heat balance around the nuclear steam supply system, is used. There are four basic elements involved in the calculation of thermal power based on steam plant calorimetry: The mass flow of the feedwater from the power conversion system, the specific enthalpy of that feedwater, the specific enthalpy of the steam delivered to the power conversion system, and other cycle gains and losses. Of these elements, the accuracy of the feedwater mass flow and the feedwater enthalpy, as determined from its temperature and pressure, are typically the largest contributors to the calorimetric calculation uncertainty. Historically, plants have been required to include a margin of 2% in the calculation of the reactor thermal power for the licensed maximum plant output to account for instrumentation uncertainty. The margin is intended to ensure a cushion between operating power and the power for which safety analyses are performed. Use of approved chordal ultrasonic transit-time technology to make the feedwater flow and temperature measurements (in place of traditional differential-pressure- based instruments and resistance temperature detectors [RTDs]) allows for nuclear plant thermal power calculations accurate to 0.3%-0.4% of plant rated power. This improvement in measurement accuracy has allowed many plant operators in the U.S. and around the world to increase plant power output through Measurement Uncertainty Recapture (MUR) up-rates of up to 1.7% of rated power, while also decreasing the probability of significant over-power events. This paper will examine the basic elements involved in calculation of thermal power using ultrasonic transit-time technology and will discuss the criteria for bounding uncertainties associated with each element in order to achieve reactor thermal power calculations to within 0.3% to 0.4%. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Photovoltaic device for enhancing power output of concentrating solar thermal power plants

A photovoltaic retrofit device for a concentrating solar thermal power plant having a parabolic trough reflector, and a fluid receiver with working fluid therein spaced from the reflector and positioned at a focal point of the reflector. The photovoltaic device includes a plurality of adjustable angle dichroic mirrors positioned between the parabolic trough reflector and the fluid receiver. A photovoltaic receiver assembly has multiple photovoltaic panels in angular relationship to each other. A photovoltaic temperature regulating system includes a fluid medium to regulate temperature of the photovoltaic panels.

Otanicar, Todd↗

A Tale of Two Simulators—A Comparative Human-in-the-Loop Nuclear Power Plant Operations Study on Thermal Power Dispatch for Hydrogen Production

A study was designed for a reconfigurable, full-scale, full-scope nuclear power plant control room simulator to compare two different thermal power dispatch systems, on separate simulator platforms, demonstrating a TPD concept of operation. A TPD system can provide a desirable alternative revenue source for utilities but requires addressing new and unique operational issues. The selection of representative scenarios and the scenario-based experimental design are presented as key elements to capture evidence for validating the developed TPD concept of operations overcome these operational issues.

Ulrich, Thomas A.↗

Advancements in Development and Testing of Thermal Power Dispatch Simulators

Flexible plant operations and generation (FPOG) offer nuclear power plants (NPPs) the chance to leverage alternative, non-electric revenue streams while ensuring their continued role as reliable, clean, and constant sources of baseload electrical power. The excess thermal energy generated from NPPs during periods of low electricity demand can be channeled as raw materials to numerous industrial processes via a thermal power dispatch (TPD) system. Hydrogen production via high-temperature steam electrolysis (HTSE) is an optimal use case based on technical and economic feasibility. Researchers at Idaho National Laboratory (INL) have conducted previous works that developed and implemented TPD system models within the GSE Solutions Generic Pressurized Water Reactor (GPWR) simulator to support human-in-the-loop (HITL) scenario-based evaluations. The first part of this report documents modifications made to the GPWR TPD model and HMI from the previous iteration in line with a new Sargent and Lundy (S&L) TPD design with an automatic control system. The was done in collaboration with Westinghouse using their three-loop pressurizer water reactor (W3LPWR) simulator which contains an industrial grade automatic control system for the TPD. This was installed in the Human Systems Simulation Laboratory (HSSL) at INL. The second part of the report documents findings from an all-hands-on-deck integration and verification workshop that was conducted in the HSSL over several days. The research team comprised INL human factors and TPD experts, a nuclear engineer from GSE Solutions who implemented the revised TPD model for GPWR, the human-machine interface (HMI) prototyping and human factors team from the University of Idaho, and personnel with operations experience with pressurized water reactors. The workshop provided time and expertise to conduct the final activities to bring the operations, HMI, and simulator into a functional state. The goals of the integration and verification workshop were: 1. to install the revised GPWR TPD model into the HSSL 2. verify the TPD HMI prototype was functional 3. integrate the HTSE Simulink model to GPWR. 3. Issues were identified for resolution, but overall the workshop accomplished its goal to integrated and verify the majority of the intended functional. Future work will resolve the identified issues and use the integrated simulation to support an evaluation and demonstration in the next fiscal year.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Solar thermal power system

A solar thermal power generator includes an inclined elongated boiler tube positioned in the focus of a solar concentrator for generating steam from water. The boiler tube is connected at one end to receive water from a pressure vessel as well as connected at an opposite end to return steam back to the vessel in a fluidic circuit arrangement that stores energy in the form of heated water in the pressure vessel. An expander, condenser, and reservoir are also connected in series to respectively produce work using the steam passed either directly (above a water line in the vessel) or indirectly (below a water line in the vessel) through the pressure vessel, condense the expanded steam, and collect the condensed water. The reservoir also supplies the collected water back to the pressure vessel at the end of a diurnal cycle when the vessel is sufficiently depressurized, so that the system is reset to repeat the cycle the following day. The circuital arrangement of the boiler tube and the pressure vessel operates to dampen flow instabilities in the boiler tube, damp out the effects of solar transients, and provide thermal energy storage which enables time shifting of power generation to better align with the higher demand for energy during peak energy usage periods.

14 SOLAR ENERGY↗

Incorporation of Thermal Hydraulic Models for Thermal Power Dispatch into a PWR Power Plant Simulator

This report describes the development, modeling, and results of a generic pressurized water reactor power plant simulator that incorporates coupled electrical and thermal power dispatch to an industrial process located approximately one kilometer from the nuclear power plant. The simulator is a commercial PWR simulator that has been modified to include thermal power dispatch as described in past milestone reports [ , ]. The commercial PWR simulator is a generic simulator available from GSE SYSTEMS® (Sykesville, MD, USA) that is built using RELAP5-HDTM Real-Time Solution and in-house software developed by GSE Systems. This generic PWR (GPWR) simulator performs real-time simulation of the complete power plant from the reactor neutronics to the electricity generation and distribution. All primary, secondary, and auxiliary systems are modeled including all control logic in order to provide the most accurate representation of actual nuclear power plant (NPP) operation, and the simulator results have been rigorously verified by an actual NPP operating at approximately 1 GWe. This report is a continuation of worked performed in previous years, and supplemental information from previous reports is included in the appendix for reference.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Roadmap to Advance Heliostat Technologies for Concentrating Solar-Thermal Power

Heliostat-based concentrating solar-thermal power (CSP) systems can offer immense potential to provide low-cost, dispatchable renewable thermal and electrical energy to help achieve 100% decarbonized energy infrastructure in the United States. Heliostats are a major capital cost technology and a performance-dominating component of state-of-the-art commercial molten salt towers and Generation 3 CSP systems. In 2021, the U.S. Department of Energy (DOE) Solar Energy Technologies Office (SETO) launched the Heliostat Consortium (HelioCon), a five-year initiative to advance heliostat technologies. The HelioCon mission is threefold: (1) establish strategic core testing and modeling capabilities and infrastructure at national labs; (2) support heliostat technology development in relevant industries; and (3) serve as a central repository to integrate industry, academia, and other stakeholders for heliostat technology research, development, validation, and deployment. In this report, HelioCon presents a roadmapping study on advancing heliostat technologies, intended as a central reference for the whole CSP community.

14 SOLAR ENERGY↗

Investigation of coal stockpiles of Tuncbilek thermal power plant with respect to time under atmospheric conditions

Thermal power plants have delayed the coal that they will use at stockpiles mandatorily. If these coal stockpiles remain at the stockyards over a certain period of time, a spontaneous combustion can be started itself. Coal stocks under combustion threat can cost too much economically to coal companies. Therefore, it is important to take some precautions for saving the stockpiles from the spontaneous combustion. In this research a coal stockpile at Tuncbilek Thermal Power Plant which was formed in 5 m wide, 10 m long, and 3 m height with a weight of 120 tons to observe internal temperature changes with respect to time under normal atmospheric conditions. Later, internal temperature measurements were obtained at 20 points distributed all over two layers in the stockpile. The parameters, such as air temperature, humidity, atmosphere pressure, wind speed and direction, which are effective on the stockpiles, were measured and used to obtain the graphs of stockpiles' internal temperature.

01 COAL, LIGNITE, AND PEAT↗

Thermal power plant upgrade via a rotating detonation combustor and retrofitted turbine with optimized endwalls

Over the past decade, pressure gain combustion research has promised over 10 percentage-points of increase in power plant thermal efficiency. Alas, to realize such potential gain, one must effectively couple the turbine with the detonation combustor, whose exhaust conditions differ substantially from current state of the art gas turbines. This paper presents a modeling approach that enables a superior thermodynamic cycle with a rotating detonation combustor and a retrofitted gas turbine by including a diffuser downstream of the combustor and by contouring the turbine endwall, while preserving the airfoil geometry. We propose a multi-step optimization strategy, parametrizing the endwall geometry with a few control points, without altering the airfoil geometry, and with the stage turbine efficiency as objective function. In a first step the turbine performance is assessed with steady inlet conditions by solving the steady three-dimensional Reynolds-Averaged Navier-Stokes equations. In a second step, the inlet conditions are unsteady, as predicted from a detonation combustor and a diffuser, and three-dimensional full unsteady simulations are performed with an unsteady Reynolds-Averaged Navier-Stokes solver. By altering the vane endwall, the steady optimization yielded an efficiency increase of 12% relative to the baseline, while the unsteady optimization resulted in 21% increase compared to the datum turbine. Finally, a full engine analysis demonstrated the superiority of pressure gain combustion which included a realistic thermodynamic cycle of the combustor, the diffuser and the optimized turbine components.

42 ENGINEERING↗

Improved Electrical Load Match In California By Combining Solar Thermal Power Plants with Wind Farms

California with its hydro, geothermal, wind, and solar energy is the second largest producer of renewable electricity in the United States (Washington state is the largest producer of renewable energy electricity due to high level of hydro power). Replacing fossil fuel electrical generation with renewable energy electrical generation will decrease the release of carbon dioxide into the atmosphere which will slow down the rapid increase in global warming (a goal of the California state government). However, in order for a much larger percentage of the total electrical generation in California to be from renewable energies like wind and solar, a better match between renewable energy generation and utility electrical load is required. Using wind farm production data and predicted production from a solar thermal power plant (with and without six hours of storage), a comparison was made between the renewable energy generation and the current utility load in California. On a monthly basis, wind farm generated electricity at the three major wind farm areas in California (Altamont Pass, east of San Francisco Bay area; Tehachapi Pass in the high desert between Tehachapi and Mojave; and San Gorgonio Pass in the low desert near Palm Springs) matches the utility load well during the highest electrical load months (May through September). Prediction of solar thermal power plant output also indicates a good match with utility load during these same high load months. Unfortunately, the hourly wind farm output during the day is not a very good match to the utility electrical load (i.e. in spring and summer the lowest wind speed generally occurs during mid-day when utility load is highest). If parabolic trough solar thermal power plants are installed in the Mojave Desert (similar to the 354 MW of plants that have been operating in Mojave Desert since 1990) then the solar electrical generation will help balance out the wind farm generation since highest solar generated electricity will be during mid-day. Adding six hours of solar thermal storage improved the utility load match significantly in the evening and reliability was also improved. Storage improves reliability because electrical production can remain at a high level even when there are lulls in the wind or clouds decrease the solar energy striking the parabolic trough mirrors. The solar energy from Mojave Desert and wind energy in the major wind farm areas are not a good match to utility load during the winter in California, but if the number of wind farms were increased east of San Diego, then the utility renewable energy match would be improved (this is because the wind energy is highest during the winter in this area). Currently in California, wind electrical generation only contributes 1.8% of total electricity and solar electrical generation only contributes 0.2%. Combining wind farms and solar thermal power plants with storage would allow a large percentage of the electrical load in California to be met by wind and solar energy due to a better match with utility load than by either renewable resource separately.

14 SOLAR ENERGY↗

Simulation of 15% and 50% Thermal Power Dispatch to an Industrial Facility Using a Flexible Generic Full-Scope Pressurized Water Reactor Plant Simulator

Nuclear power plants in the United States are increasingly challenged to compete in wholesale electricity markets due to the low electricity costs and increasingly dynamic grid conditions from competing generation sources. An alternative market for nuclear power is industrial facilities that can use the thermal and/or electrical power generated by a nuclear power plant to offset the economic losses incurred by electricity market challenges. A generic pressurized water reactor (PWR) simulator was used to show the results of a basic design for a generic thermal power extraction system and tests were run using a set of procedures to show what happens when a nuclear power plant transitions from full electrical power dispatch to 15% and 50% thermal power dispatch. This type of operation leads to losses in turbine performance efficiency due to the deviation from the design operating point, but because the thermal power is also used by the industry load without conversion losses, the combined thermal efficiency of the PWR increases. For the 15% case, the thermal efficiency increased from 32% to 41.9%, while for the 50% case, the efficiency increased up to 60.1%. In addition, for 50% thermal power dispatch, the power dissipated by the condenser decreased from approximately 2000 to approximately 1300 MW (thermal), indicating a substantially diminished impact on the environment in terms of releasing heat into the cooling water reservoir.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗