Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “test readiness review”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

VERA 3.6 Release

CASL has developed a formalized process to release the Virtual Environment for Reactor Applications (VERA) to non-CASL users through the Radiation Shielding Information Computational Center (RSICC). This milestone represents a major release of VERA with updates that significantly reduce computational resources required and introduce new capabilities related to fuel performance integration. This release will also be used by CASL Test Stands and training activities. VERA 3.6 represents an incremental release, with improvements to core component capabilities, significant performance improvements, and updated documentation. This release followed a significantly revised release process, with formal documentation, testing, readiness reviews, and release authorization. The major tasks that were completed as part of this milestone were: 1) Revision of the VERA RSICC Release Process and Procedures; 2) Identification of the VERA release components; 3) Creation of a Release Candidate; 4) Independent evaluation of the Release Candidate by the Advanced Modeling Applications (AMA) Focus Area; 5) A Release Candidate Readiness Review; 6) Development and execution of a System Test Plan; 7) Updates of manuals and other required documentation; 8) Export Control reviews; 9) A Release Readiness Review; and 10) Delivery of the release package to RSICC. Synopses of the work done to complete each of these major tasks are summarized in Section 2 below. Supporting details are provided in the PHI Kanban ticket #4424 Support VERA 3.6 Release Activities and its child tickets.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Chapter 8: Life-Cycle Testing and Analysis

Prior to a spacecraft launch, program mission assurance standards dictate that the flight battery power system should comply with mission requirements under the intended operating conditions. Ground life cycle testing (LCT) combined with an analysis on the electrical power system (EPS) battery is an empirical method used to demonstrate compliance to satellite service life requirements. The LCT compliance method adopted by the aerospace industry is based on demonstrating a space battery's life expectancy as a part of battery qualification. Real-time cell and lithium-ion battery (LIB) LCT data are commonly used for model inputs to EPS power and energy balance analyses, in LIB reliability analysis estimates, and to support on-orbit spacecraft mission life extension opportunities. This chapter describes the LCT planning steps, process approach, and analysis techniques commonly used to qualify space LIB power systems.

accelerated aging↗

Deactivation and Demolition (D and D) of the Toxic Substance Control Act (TSCA) Incinerator Oak Ridge, Tennessee - 19184

UCOR, an AECOM-led partnership with Jacobs, manages the cleanup of the 2,200-acre East Tennessee Technology Park for its client, the U.S. Department of Energy (DOE), in Oak Ridge, Tennessee. The site was contaminated with radioactive, hazardous and industrial wastes generated by more than 40 years of national defense and energy missions. In 1989, the U.S. Environmental Protection Agency (EPA) added the Oak Ridge Reservation to the National Priorities List of sites and facilities that pose a sufficient threat to human health or the environment to warrant cleanup. The U.S. Department of Energy is cleaning up the Oak Ridge Reservation under a Federal Facility Agreement with the EPA and the Tennessee Department of Environment and Conservation. Many types of waste have been managed and disposed as part of the multi-decade cleanup effort. One unique facility, the Toxic Substance Control Act (TSCA) Incinerator, was constructed at the Department of Energy's Est Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. The Incinerator was constructed in the mid-1980's and underwent a series of test burns and readiness reviews to obtain the necessary environmental permits and operating approvals from state and federal regulatory agencies. With these in place, the incinerator began routine operations in 1991. It was designed and permitted for receiving, sorting, storing, preparing, and thermally destroying low-level radioactive and RCRA mixed waste contaminated with PCBs. The incinerator was named after a law passed in 1976 that provides the U.S. Environmental Protection Agency with authority to require reporting, record-keeping, testing, and restrictions relating to chemical substances and/or mixtures. During its operating lifetime, the one-of-a-kind thermal treatment facility burned materials regulated under TSCA and the Resource Conservation and Recovery Act (RCRA), most notably radiologically-contaminated polychlorinated biphenyls (PCBs). The TSCA Incinerator met or exceeded environmental regulations and DOE requirements for the treatment of these types of wastes. After more than 18 years of operation and more than 35 million pounds of waste safely incinerated, the TSCA Incinerator shut down operations on December 2, 2009. The TSCA Incinerator has been called a national resource for DOE sites from coast to coast. As the only U.S. facility permitted to incinerate specialized types of wastes, it not only accepted material from the Oak Ridge Reservation but also other facilities across the nationwide DOE complex. Over the years, a dynamic team of hard working and talented people operated and maintained the facility under the most stringent environmental permits and site requirements. The facility has played a key role in the treatment of radioactive PCB and hazardous wastes (mixed wastes) from the Oak Ridge Reservation, as well as from other facilities across the DOE complex. Through its support to over 20 sites in the DOE complex, environmental waste from past and ongoing operations has been safely and permanently treated. In the years since it was shut down, deactivation workers have been preparing TSCA for demolition. This work scope included triple cleaning, rinsing of all production equipment and tanks to RCRA clean criteria, filling sumps, encapsulating PCB and radioactive contamination, removal of universal waste (asbestos. lead and mercury), draining and disposal of residual water in tanks and transfer piping, and removing and disposing of carbon vessels, which were part of the water management system. In 2018, the facility was successfully deactivated and demolished, permanently removing one of the most unique facilities in the DOE complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Final Report for the Contractor Readiness Assessment of the Transient Reactor Test Facility Resumption of Transient Testing Activity at the Idaho National Laboratory

The purpose of this review was to verify readiness for the TREAT restart of transient testing activity at the INL and inform the startup authorization authority decision-making for startup authorization by providing a deliberate and managed determination of the state of readiness preparation and determination of whether operations can be performed safely. Verification of readiness included assuring that equipment operability, procedure viability, and personnel knowledge, skills, and performance are adequate for operations. Because the TREAT (including restart of transient testing activity) is a hazard category-2 nuclear facility and because reactor operation and transient testing activities were suspended for programmatic and funding reasons in excess of a year, DOE O 425.1D required that both a contractor and DOE RA be satisfactorily completed prior to startup of the TREAT and restart of transient testing activity. To this end, DOE directed that a CRA and federal RA be conducted. The CRA IP defined the depth of the CRA through the objectives and CRADs, delineated in Appendix A of the IP; established roles and responsibilities for CRA team activities; and established processes, practices, and protocols for preparation, conduct, documentation, and reporting of the CRA. The approaches and methodologies identified in the IP were used to verify that the BEA management team has established SSCs, developed personnel capabilities and competencies, and implemented safety features, programs, and procedures in a manner that provides reasonable assurance for adequate protection of workers, the public, and the environment in preparation for and execution of the TREAT restart of transient testing activity. This CRA was intended to confirm that (1) the facility is in a state of readiness to safely conduct operations in accordance with the safety basis; and (2) the management control programs are in place to ensure safe operations can be sustained. This equated to mature implementation of the integrated safety management (ISM) in conjunction with implementation of the individual facility authorization basis. This CRA was structured to verify the readiness to conduct restart of transient testing activity safely, and that facility programs were in place to support the restart of transient testing activity.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Design, Construction, and Commissioning of the RH LLW Disposal Facility at INL - 19445

The newly-commissioned Remote-Handled Low-Level Waste (RH LLW) Disposal Facility at Idaho National Laboratory (INL) provides permanent disposal capability critical for continuing INL nuclear research and Naval Reactors missions at the Idaho site. The facility mission need [critical decision (CD)- 0] was approved in 2009. Alternative selection (CD-1) was finalized in 2011. The project performance baseline (CD-2/3) was approved and design was initiated in 2014 and construction began in 2015. Construction was completed and transitioned to Materials and Fuels Complex (MFC) Operations in 2017. The facility successfully achieved readiness with authorization to begin operations (CD-4) in 2018. The $77 M line-item capital-acquisition project was completed six months ahead of the congressional commitment date and significantly under budget. This paper presents highlights of the RH LLW Disposal Facility project delivery and a summary of facility features and critical characteristics. Highlights include: - As a hazard category II nuclear facility, the project complied with United States Department of Energy (DOE) requirements for incorporation of nuclear safety into facility design and construction as identified in DOE-STD-1189 as well as 10 CFR 835 Subpart K requirements for incorporation of ALARA principles in facility design. - From an environmental compliance perspective, the facility was subject to National Environmental Policy Act requirements resulting in a Finding of No Significant Impact as determined by an Environmental Assessment. An operating disposal authorization statement from the Low-Level Waste Disposal Facility Federal Review Group (LFRG) authorizing waste disposal operations in accordance with DOE Order 435.1 was obtained. - The project was delivered using a design-build delivery method with a firm-fixed price with incentive fee contracting mechanism. The project was executed as a line-item capital-acquisition project, in full compliance with DOE Order 413.3B under INL's certified Earned Value Management System (EVMS) program. - The facility supports twenty years of waste disposal operations with five disposal vault configurations in four vault arrays supporting six different cask/canister system configurations. Three of the six cask/canister systems currently exist and three will be developed to support future operations. There are a total of 446 waste disposal vaults that will accommodate disposal of a total of 939 stainless steel radioactive waste canisters. The facility is designed to accommodate canisters with contact radiation dose rates as high as 600 Sievert/hour (60,000 Rem/hour). - The facility underwent a rigorous readiness review process in accordance with DOE Order 425.1D. Readiness activities included rigorous facility testing and shakedown activities, a management-self assessment, a contractor operational readiness review, and a DOE operational readiness review. Readiness was demonstrated for an existing cask/canister system (the MFC HFEF-5 cask). Separate readiness activities will be conducted for each cask/canister system as they are brought online for facility operations. INL's successful delivery of the project has provided waste disposal capability to ensure long-term viability of planned and current facilities and missions associated with both INL and the Naval Reactors Facility. Successful execution of the project has proven to be strategically important to future capital investments in capabilities necessary to advance INL's mission. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

High Power FPC Progress for EIC ESR Cavities

Electron-Ion Collider (EIC) is a next generation particle accelerator to be built at Brookhaven National Laboratory, in partnership with Thomas Jefferson National Accelerator Facility. In Electron Storage Ring (ESR), 18 single-cell 591 MHz SRF cavities are required to compensate for up to 10 MW energy loss due to synchronic radiation. Two high power FPCs for each cavity are used to deliver up to 800 kW power to the beam. The high power FPC were designed and reviewed. The FPC prototypes will be ready for high power test around mid-2026. This paper presents the latest development of FPC prototyping and path forward for FPC conditioning.

43 PARTICLE ACCELERATORS↗

Lab-Scale Demonstration of Plutonium Purification by Anion Exchange, Plutonium(IV) Oxalate Precipitation, and Calcination to Plutonium Oxide to Support the MOX Feed Mission

H-Canyon and HB-Line are tasked with the production of PuO 2 from a feed of plutonium metal. The PuO 2 will provide feed material for the MOX Fuel Fabrication Facility. After dissolution of the Pu metal in H-Canyon, the solution will be transferred to HB-Line for purification by anion exchange. Subsequent unit operations include Pu(IV) oxalate precipitation, filtration and calcination to form PuO 2 . This report details the results from SRNL anion exchange, precipitation, filtration, calcination, and characterization tests, as requested by HB-Line1 and described in the task plan. This study involved an 80-g batch of Pu and employed test conditions prototypical of HB-Line conditions, wherever feasible. In addition, this study integrated lessons learned from earlier anion exchange and precipitation and calcination studies. H-Area Engineering selected direct strike Pu(IV) oxalate precipitation to produce a more dense PuO 2 product than expected from Pu(III) oxalate precipitation. One benefit of the Pu(IV) approach is that it eliminates the need for reduction by ascorbic acid. The proposed HB-Line precipitation process involves a digestion time of 5 minutes after the time (44 min) required for oxalic acid addition. These were the conditions during HB-line production of neptunium oxide (NpO 2 ). In addition, a series of small Pu(IV) oxalate precipitation tests with different digestion times were conducted to better understand the effect of digestion time on particle size, filtration efficiency and other factors. To test the recommended process conditions, researchers performed two nearly-identical larger-scale precipitation and calcination tests. The calcined batches of PuO 2 were characterized for density, specific surface area (SSA), particle size, moisture content, and impurities. Because the 3013 Standard requires that the calcination (or stabilization) process eliminate organics, characterization of PuO 2 batches monitored the presence of oxalate by thermogravimetric analysis-mass spectrometry (TGA-MS). To use the TGA-MS for carbon or oxalate content, some method development will be required. However, the TGA-MS is already used for moisture measurements. Therefore, SRNL initiated method development for the TGA-MS to allow quantification of oxalate or total carbon. That work continues at this time and is not yet ready for use in this study. However, the collected test data can be reviewed later as those analysis tools are available.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Florida Atlantic University-Southeast National Marine Renewable Energy Center: Cooperative Research and Development Final Report, CRADA Number CRD-10-377

Florida Atlantic University's Southeast National Marine Renewable Energy Center (SNMREC) and the National Renewable Energy Laboratory's National Wind Technology Center (NWTC) will collaborate to advance research and development (R&D) of marine and hydrokinetic (MHK) renewable energy technology, specifically renewable energy captured from oceanic currents such as the Florida Current. SNMREC is endeavoring to establish infrastructure and capabilities that will form the base of a marine energy technology testing center focused on energy production from open-ocean currents and ocean thermal resources. As part of this effort, SNMREC is also aiming to create technology development tools and an experimental hydrokinetic device to operate in the Florida Current. NWTC has experience in developing testing infrastructure and modeling tools. SNMREC has expertise in ocean engineering and operations, a large inventory of ocean instrumentation, and ready access to the ocean. NWTC and SNMREC will therefore work together on numerical modeling, technology design review and testing, the development of standardized MHK instrumentation, field testing, establishing testing protocols, and moving the SNMREC testing capability through A2LA accreditation.

16 TIDAL AND WAVE POWER↗

COR-0011 Rev 6 MARVEL Project Code of Record

This Code of Record identifies the codes, standards, and procedures necessary to design, develop, construct, and startup the Microreactor Applications Research Validation and Evaluation (MARVEL) Project at the Materials and Fuel Complex (MFC) Transient Reactor Test (TREAT) Facility and the Idaho National Laboratory (INL). The MARVEL Project is an INL test microreactor funded by the United States Department of Energy (DOE) via the Microreactor Program (MRP). The goal of the project is to establish an operational nuclear applications test bed that can generate combined heat and power to enable integration and R&D with end-user technologies, as well as allow microreactor technologists to test next-generation control systems. The microreactor is a thermal reactor utilizing Uranium Zirconium Hydride (UZrH) fuel with review and authorization by the Department of Energy Idaho Operations Office (DOE-ID) for National Environmental Policy Act (NEPA) compliance, safety review, and supplemental readiness assessments for startup and operation. To enable rapid deployment, the MARVEL reactor will reside in the Transient Reactor Test (TREAT) Facility and utilize the existing operating Category B reactor facility, approved facility safety basis, operating crews, and recent re-start experience.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SU-E-P-01: An Informative Review On the Role of Diagnostic Medical Physicist in the Academic and Private Medical Centers

Purpose: The role of physicist in the academic and private hospital environment continues to evolve and expand. This becomes more obvious with the newly revised requirements of the Joint Commission (JC) on imaging modalities and the continued updated requirements of ACR accreditation for medical physics (i.e., starting in June 2014, a physicists test will be needed before US accreditation). We provide an informative review on the role of diagnostic medical physicist and hope that our experience will expedite junior physicists in understanding their role in medical centers, and be ready to more opportunities. Methods: Based on our experience, diagnostic medical physicists in both academic and private medical centers perform several clinical functions. These include providing clinical service and physics support, ensuring that all ionizing radiation devices are tested and operated in compliance with the State and Federal laws, regulations and guidelines. We also discuss the training and education required to ensure that the radiation exposure to patients and staff is as low as reasonably achievable. We review the overlapping roles of medical and health physicist in some institutions. Results: A detailed scheme on the new requirements (effective 7/1/2014) of the JC is provided. In 2015, new standards for fluoroscopy, cone beam CT and the qualifications of staff will be phased in. A summary of new ACR requirements for different modalities is presented. Medical physicist have other duties such as sitting on CT and fluoroscopy committees for protocols design, training of non-radiologists to meet the new fluoroscopy rules, as well as helping with special therapies such as Yittrium 90 cases. Conclusion: Medical physicists in both academic and private hospitals are positioned to be more involved and prominent. Diagnostic physicists need to be more proactive to involve themselves in the day to day activities of the radiology department.

60 APPLIED LIFE SCIENCES↗

ATDM ASD report for ECP October 2018

In October the team merged in updated ATDM/Trilinos configuration to include SPARC requirements. Assisted and worked on issues identified by the EMPIRE switchover to the ATDM/Trilinos configuration. Progress was made on automating dashboard triaging. Discovered and began addressing issues with mixed language calling with gcc-7.2 on Power8. Worked on new Python tool to filter CDASH reports to only show new issues. Completed ECP ST review. In October the team put an algorithm in place to prevent inverted elements in SPARC during refinement and worked on tests to morph mesher and should be ready for SGM integration soon. The team worked on solver rebalance and corrected issues. Complete SIMD work. Worked out next steps for solver improvements for EMPIRE. Adjusted some solver settings and to improve performance; strong scaling curves are flat instead of ascending etc. Worked on optimizing kernels for SPARC. Completed ECP ST reviews. The team worked on cleaning up branch for merge into SPARC master dev branch. Progress was made building scripts for catalyst builds on all HPC platforms of interest. Worked on adding TuckerMPl reader as plugin for catalyst. Completed ECP project review. Work has continued on NimbleSM, which now runs in a container and can be used modularly with an MPI code. The team also made progress on a qthreads version of NibleSM. Worked on build system issues within NimbleSM and Sierra for GPUs. Progressed on getting kookfied material models in NimbleSM. The team incorporated panel feedback form ECP project reviews into FY19 plans.

97 MATHEMATICS AND COMPUTING↗

ASC L2 Milestone Review CTS-2 Production Readiness [Slides]

Open and secure CTS-2 are ready for production capability to include accessibility for users and integration with existing storage and network environment. Hardware testing, early user testing is accomplished, and the systems are generally available for ASC production users.

97 MATHEMATICS AND COMPUTING↗

Stereo-Optic High Definition Imaging: A New Technology to Understand Bird and Bat Avoidance of Wind Turbines

There is a critical need to develop monitoring tools to track aerofauna (birds and bats) in three dimensions around wind turbines. New monitoring systems will reduce permitting uncertainty by increasing the understanding of how birds and bats are interacting with wind turbines, which will improve the accuracy of impact predictions. Biodiversity Research Institute (BRI), The University of Maine Orono School of Computing and Information Science (UMaine SCIS), HiDef Aerial Surveying Limited (HiDef), and SunEdison, Inc. (formerly First Wind) responded to this need by using stereo-optic cameras with near-infrared (nIR) technology to investigate new methods for documenting aerofauna behavior around wind turbines. The stereo-optic camera system used two synchronized high-definition video cameras with fisheye lenses and processing software that detected moving objects, which could be identified in post-processing. The stereo- optic imaging system offered the ability to extract 3-D position information from pairs of images captured from different viewpoints. Fisheye lenses allowed for a greater field of view, but required more complex image rectification to contend with fisheye distortion. The ability to obtain 3-D positions provided crucial data on the trajectory (speed and direction) of a target, which, when the technology is fully developed, will provide data on how animals are responding to and interacting with wind turbines. This project was focused on testing the performance of the camera system, improving video review processing time, advancing the 3-D tracking technology, and moving the system from Technology Readiness Level 4 to 5. To achieve these objectives, we determined the size and distance at which aerofauna (particularly eagles) could be detected and identified, created efficient data management systems, improved the video post-processing viewer, and attempted refinement of 3-D modeling with respect to fisheye lenses. The 29-megapixel camera system successfully captured 16,173 five-minute video segments in the field. During nighttime field trials using nIR, we found that bat-sized objects could not be detected more than 60 m from the camera system. This led to a decision to focus research efforts exclusively on daytime monitoring and to redirect resources towards improving the video post- processing viewer. We redesigned the bird event post-processing viewer, which substantially decreased the review time necessary to detect and identify flying objects. During daytime field trials, we determine that eagles could be detected up to 500 m away using the fisheye wide-angle lenses, and eagle-sized targets could be identified to species within 350 m of the camera system. We used distance sampling survey methods to describe the probability of detecting and identifying eagles and other aerofauna as a function of distance from the system. The previously developed 3-D algorithm for object isolation and tracking was tested, but the image rectification (flattening) required to obtain accurate distance measurements with fish-eye lenses was determined to be insufficient for distant eagles. We used MATLAB and OpenCV to improve fisheye lens rectification towards the center of the image, but accurate measurements towards the image corners could not be achieved. We believe that changing the fisheye lens to rectilinear lens would greatly improve position estimation, but doing so would result in a decrease in viewing angle and depth of field. Finally, we generated simplified shape profiles of birds to look for similarities between unknown animals and known species. With further development, this method could provide a mechanism for filtering large numbers of shapes to reduce data storage and processing. These advancements further refined the camera system and brought this new technology closer to market. Once commercialized, the stereo-optic camera system technology could be used to: a) research how different species interact with wind turbines in order to refine collision risk models and inform mitigation solutions; and b) monitor aerofauna interactions with terrestrial and offshore wind farms replacing costly human observers and allowing for long-term monitoring in the offshore environment. The camera system will provide developers and regulators with data on the risk that wind turbines present to aerofauna, which will reduce uncertainty in the environmental permitting process.

Adams, Evan↗

Gas-cooled Fast Reactor Research and Development Roadmap

The United States Department of Energy (DOE) commissioned the development of technology roadmaps for advanced (non-light water reactor) reactor concepts to help focus research and development funding over the next five years. The roadmaps show the research and development needed to support demonstration of an advanced (non-LWR) concept by 2030, consistent with DOE’s Vision and Strategy for the Development and Deployment of Advanced Reactors. The starting point for the roadmaps is the Technical Readiness Assessment performed as part of an Advanced Test and Demonstration Reactor study released in 2016. The roadmaps were developed based upon a review of technical reports and vendor literature summarizing the technical maturity of each concept and the outstanding research and development needs. Critical path tasks for specific systems were highlighted on the basis of time and resources needed to complete the tasks and the importance of the system to the performance of the reactor concept. The roadmaps are intended to be generic, i.e. not specific to a particular vendor’s design, but features of the General Atomics EM2 were included to provide specific examples to illuminate needed R&D tasks to be conducted in support of demonstration in the 2030-2035 window. This report provides the roadmaps to engineering demonstration for of a Gas-Cooled Fast Reactor with an outlet temperature around 850 C. The selection of tasks and associated timelines rely heavily upon the Generation IV International Forum Technology Roadmaps and more recent information provided by a GFR developer, General Atomics.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Gas-cooled Fast Reactor Research and Development Roadmap

The United States Department of Energy (DOE) commissioned the development of technology roadmaps for advanced (non-light water reactor) reactor concepts to help focus research and development funding over the next five years. The roadmaps show the research and development needed to support demonstration of an advanced (non-LWR) concept by 2030, consistent with DOE’s Vision and Strategy for the Development and Deployment of Advanced Reactors. The starting point for the roadmaps is the Technical Readiness Assessment performed as part of an Advanced Test and Demonstration Reactor study released in 2016. The roadmaps were developed based upon a review of technical reports and vendor literature summarizing the technical maturity of each concept and the outstanding research and development needs. Critical path tasks for specific systems were highlighted on the basis of time and resources needed to complete the tasks and the importance of the system to the performance of the reactor concept. The roadmaps are intended to be generic, i.e. not specific to a particular vendor’s design, but features of the General Atomics EM2 were included to provide specific examples to illuminate needed R&D tasks to be conducted in support of demonstration in the 2030-2035 window. This report provides the roadmaps to engineering demonstration for of a Gas-Cooled Fast Reactor with an outlet temperature around 850 C. The selection of tasks and associated timelines rely heavily upon the Generation IV International Forum Technology Roadmaps and more recent information provided by a GFR developer, General Atomics.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

High Temperature Reactor Research and Development Roadmap, Draft for Public Comment

Nuclear power provides clean, reliable energy, contributing about 20 percent of the electricity generated in the United States. It supplies approximately 60 percent of our non-greenhouse-gas emitting power, making it our nation’s single largest contributor of carbon-free electricity. This vital component of the U.S. energy portfolio avoids hundreds of millions of tons of carbon dioxide emissions each year and supports hundreds of thousands of U.S. jobs, and yet is facing unprecedented challenges. Complex market factors, falling alternative generation costs and lower electricity demand forecasts have made operating nuclear power plants uneconomical in some parts of the country. The industry is confronting premature shut downs, a lack of new plants in the pipeline, profound market challenges and intense financing requirements. However, none of these challenges reflect a reduced need for this reliable and clean source of baseload power. Our nation’s nuclear sector urgently needs to adjust to these challenges to ensure continued availability of this vital national energy resource. The Department of Energy and its national laboratories are aggressively working to revive, revitalize, and expand U.S. nuclear energy capacity. We are advancing nuclear energy technologies through targeted early-stage investments to ensure a strong domestic industry now and into the future. By leveraging public-private partnerships and the national laboratory system, we are developing an advanced nuclear infrastructure, encouraging a resilient supply chain, and promoting a strong nuclear pipeline. A key element of this effort is to support the recent and rapid expansion in innovative advanced reactor development already being led by the U.S. nuclear industry. Advanced reactors, particularly non-light water reactor concepts, offer the potential for significant improvements to safety, economics and environmental performance, to help sustain and expand the availability of nuclear power as a clean, reliable and secure power source for our nation. As part of this strategy, the Department of Energy commissioned the development of technology roadmaps for advanced non-light-water reactor concepts. The starting point for the roadmaps is the technical readiness assessment performed as part of an advanced test and demonstration reactor study released in 2016 [ ]. The roadmaps show the Research and Development (R&D) needed to support demonstration of advanced reactor concepts, for either engineering demonstration or commercial demonstration depending on concept maturity, by 2035. The starting point for the roadmaps is the technical readiness assessment performed as part of an advanced test and demonstration reactor study released in 2016. The roadmaps were developed based on a review of technical reports and vendor literature summarizing the technical maturity of each concept and the outstanding R&D needs. Tasks for specific systems were highlighted on the basis of time and resources needed to complete the tasks and the importance of the system to the performance of the reactor concept. The roadmaps are intended to be generic (i.e., not specific to a particular vendor’s design); however, features of the General Atomics Energy Multiplier Module were included to provide specific examples for illuminating needed R&D tasks to be conducted in support of demonstration in the near future.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Staubli TX-90XL robot qualification at the LLIHE.

The Light Initiated High Explosive (LIHE) Facility uses a robotic arm to spray explosive material onto test items for impulse tests. In 2007, the decision was made to replace the existing PUMA 760 robot with the Staubli TX-90XL. A qualification plan was developed and implemented to verify the safe operating conditions and failure modes of the new system. The robot satisfied the safety requirements established in the qualification plan. A performance issue described in this report remains unresolved at the time of this publication. The final readiness review concluded the qualification of this robot at the LIHE facility.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

A review of separation processes proposed for advanced fuel cycles based on technology readiness level assessments

The results of an international review of separation processes for spent nuclear fuel (SNF) recycling in future closed fuel cycles are reported. This study was made by the Expert Group on Fuel Recycling Chemistry (EGFRC) organised by the Nuclear Energy Agency (NEA) of the Organisation for Economic Co-operation and Development (OECD). A unique feature of this study was that processes were classified according to a hierarchy of separations aimed at different elements within spent fuel (uranium; uranium-plutonium co-recovery; minor actinides; high heat generating radionuclides) and also the Head-end processes, used to prepare the SNF for chemical separation, were included. Separation processes covered both wet (hydrometallurgical) and dry (pyro-chemical) processes. A bespoke methodology suitable for assessing the technological maturities of separation processes for SNF recycling was then designed based on the well-established Technology Readiness Level (TRL) scale but adapted for spent nuclear fuel separations. The innovative feature of this was the use of a matrix approach that enabled information on both the scale of testing and materials used in testing to be combined in the evaluation of the TRL. TRLs for the Head-end, hydrometallurgical and pyrochemical processes that had been reviewed by the study have been evaluated. It is clear that, whilst more R&D is needed in most cases to raise TRLs, suitable options exist to enable the recovery of all actinide elements plus the HHRs by wet or dry processes, even up to the extraordinarily difficult isolation of americium alone. The technology readiness levels (TRL) for most processes fall in the ‘proof of principle’ range with TRLs between 4 and 6, although this is an evaluation at the system level and some gaps in the individual process steps may still exist that strictly would reduce the overall TRL. That is, flowsheets have been proposed for processes and tested with active materials under increasingly relevant conditions, through to initial hot tests with small quantities of SNF. The results of this work were shown to be comparable to a parallel European study that evaluated TRLs for minor actinide partitioning processes.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗