Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “technical evaluation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Upcycling of post-consumer mixed polyolefin feedstock: An economic and technical evaluation

Here, this study reports techno-economic and life cycle analyses to evaluate the economic and environmental impacts of mechanically recycled PE/PP blends in the presence of rheology modifiers. Additionally, fiber-reinforced composites derived from the compatibilized blends were prepared and evaluated for their performance compared with virgin plastics. Results suggest that compatibilized PE/PP blends exhibit a 70% lower selling price compared to virgin PE. Furthermore, these blends achieved a 74% reduction in greenhouse gas emissions or climate change impact compared to the virgin counterpart. Fiber-reinforced composites from compatibilized PE/PP blends demonstrated improved or comparable mechanical properties relative to composites made from virgin PE/PP blends. Based on their favorable cost and environmental impact, along with performance comparable to virgin composites, compatibilized PP/PE composites made from post-consumer plastics can find applications in large-scale composite manufacturing.

Fiber reinforced plastics (FRP)↗

Automating the Solar Interconnection Technical Evaluation Process: PREconfiguring and Controlling Inverter SEt-Points (PRECISE)

Utilities are receiving an increasing number of interconnection requests for distributed solar photovoltaic (PV) systems from their customers, requiring a solution to quickly and intelligently perform technical assessments of these requests and to manage these new renewable energy assets. In this paper, we present a stand-alone interconnection tool, PREconfiguring and Controlling Inverter SEt-points (PRECISETM), and how it overcomes the challenges of accelerating technical evaluations and leverages smart inverter functionality to provide local voltage support on an as-needed basis. The paper details the purpose and architecture of PRECISE, including tools, data source requirements, the model-based interconnection evaluation process, and technical results. PRECISE is an integrated software tool that customizes PV inverter settings for utilities by modeling and assessing impacts on local voltages and the need for advanced inverter functions (AIFs) (e.g., volt-VAR and volt-watt). PRECISE maximizes the use of readily available utility data sets to make fast online assessments of incoming PV interconnection requests and makes accept/reject recommendations along with custom settings for AIFs.

ENERGY PLANNING, POLICY, AND ECONOMY,SOLAR ENERGY↗

System Studies for Global Nuclear Assurance & Security: 3S Risk Analysis for Small Modular Reactors (Volume I)—Technical Evaluation of Safety Safeguards & Security

Coupling interests in small modular reactors (SMR) as efficient and effective method to meet increasing energy demands with a growing aversion to cost and schedule overruns traditionally associated with the current fleet of commercial nuclear power plants (NPP), SMRs are attractive because they offer a significant relative cost reduction to current-generation nuclear reactors—increasing their appeal around the globe. Sandia's Global Nuclear Assurance and Security (GNAS) research perspective reframes the discussion around the "complex risk" of SMRs to address interdependencies between safety, safeguards, and security. This systems study provides technically rigorous analysis of the safety, safeguards, and security risks of SMR technologies. The aim of this research is three-fold. The first aim is to provide analytical evidence to support safety, safeguards, and security claims related to SMRs (Study Report Volume I). Second, this study aims to introduce a systems-theoretic approach for exploring interdependencies between the technical evaluations (Study Report Volume II). The third aim is to demonstrate Sandia's capability for timely, rigorous, and technical analysis to support emerging complex GNAS mission objectives.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Technical Evaluation of Electrically Cooled Detectors for use with the LLNL Whole Body Scanning Bed System

Lawrence Livermore National Laboratory (LLNL) is replacing a liquid nitrogen cooled high purity germanium detection system with an electrically cooled high purity germanium system for its scanning bed whole body counting system. The new detectors offer a safer environment for workers while they are measured inside the shielded facility at LLNL and provide highly stable cooling of the detectors. The positioning of the electrically cooled detectors is slightly different from the liquid nitrogen cooled detectors due to the electrical cooling units attached to the detectors. The technical evaluations and results described in this document demonstrate that the new electrically cooled system provides results that comply with internal dosimetry requirements

61 RADIATION PROTECTION AND DOSIMETRY↗

Technical Evaluation of the Department of Energy Research and Development Activities in Underground Research Laboratories - 20287

Congress created the U.S. Nuclear Waste Technical Review Board (NWTRB) in the 1987 Nuclear Waste Policy Amendments Act (Public Law 100-203) to evaluate the technical and scientific validity of activities undertaken by the Secretary of Energy to implement the Nuclear Waste Policy Act. Since 2012, DOE has collaborated in research conducted in several underground research laboratories (URLs) located in Europe and Asia. According to DOE, these international collaborations have been beneficial to its spent nuclear fuel (SNF) and high-level waste radioactive (HLW) disposal research program, particularly after the termination of the Yucca Mountain repository program when DOE began generic research on alternative host rocks (crystalline, clay, and salt) and repository environments very different from those at Yucca Mountain. In accordance with its mandate, the NWTRB is reviewing the DOE research and development (R and D) activities related to URLs. The NWTRB's review is documented in a report to Congress and the Secretary of Energy that will be released in January 2020, and this paper summarizes the NWTRB review and findings. The NWTRB held a fact-finding meeting with DOE and subsequently held a workshop on international URL collaborations in April of 2019. Based on the presentations and discussions at the workshop and at the fact-finding meeting, as well as information from reports published by DOE and others, there are four principal findings related to DoE's URL-related R and D activities. First, DOE participation in URL-related international research greatly benefits the U.S. geologic disposal R and D program by furthering its understanding of generic and site-specific disposal issues relevant to alternative repository host rocks and environments. DOE-funded R and D activities also are benefiting the URL-related research of other countries, especially in the area of complex analytical and numerical model/software development. Second, the more developed repository programs in other countries have focused on creating and strengthening their safety cases and making them transparent to the public. Repository programs in other countries use URLs to explain the technical bases underlying their safety cases, periodically reassess knowledge gaps and define new activities to strengthen the technical bases, and demonstrate the technology that will allow implementation of the proposed safety concept. Third, countries with more developed geologic disposal programs have found domestic URLs essential to their repository programs. DOE needs domestic URLs to advance geologic disposal efforts over the next decades and further its ability to train the next generation of scientists, engineers, and skilled technical workers. Fourth, DoE's international URL collaborations have advanced its generic disposal R and D program, including development of modeling capabilities recognized internationally as state-of-the-art, but further work on its coupled thermal-hydrological-mechanical-chemical models and URL- and laboratory-based research can strengthen its program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technical Evaluation of Battery Electric Bus Potential in Mexico City and León, Mexico

The National Renewable Energy Laboratory (NREL) in partnership with USAID Mexico's Low Emissions Development (MLED) II program explored the technical feasibility of transit bus electrification in Mexico City (CDMX) and León. NREL and USAID engaged CDMX and León transit agencies to understand routes of interest and existing fleet fueling and bus specifications.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cumulative Impact Evaluation Technical Approach Document

This document presents the technical approach for developing a set of tools to perform a cumulative impact evaluation (CIE) on the effects of cleanup decisions regarding groundwater quality in the Hanford Site Central Plateau. Due to the complexity and large number of waste sites in noncontiguous source operable units (OUs), the computational tools used for the CIE must be capable of representing a range of site conditions and source terms in the vadose zone while also efficiently computing the impact that cleanup decisions have on the underlying aquifer. These tools will support remedial and closure decisions across the Central Plateau by providing cumulative information, but without replacing or displacing any part of those decision processes. The objective of this document is to describe the major components required for the CIE, the approach for developing these tools, and the plan for implementation. The Central Plateau has more than 1,300 waste sites, active and inactive burial grounds, and active and inactive waste processing facilities that are regulated under a combination of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA); the Resource Conservation and Recovery Act of 1976 (RCRA); and other waste disposal regulatory frameworks. Figure 1-1 shows the source OUs on the Central Plateau and illustrates the geographical intermixing of sites within different source OUs. Groundwater OUs have several overlying source OUs, and actions taken within source OUs may affect groundwater across the entire Central Plateau. Waste site proximity between and within source OUs has resulted in contaminants commingling in the vadose and saturated zones in complex ways (Figure 1-2). Plume commingling requires cleanup decisions to be evaluated considering the surrounding waste sites and existing groundwater contamination, therefore demonstrating the need to evaluate cumulative impacts from the vadose zone to groundwater. Soil (vadose zone) and groundwater (saturated zone) contamination across the Central Plateau is undergoing investigation and remediation, and decisions need to be made regarding how to most efficiently disposition and remediate sites. Because contaminants intermingle among the OUs, decisions should be evaluated considering the context of the surrounding sites and facilities and not in isolation. Thus, the CIE of Central Plateau groundwater contamination should consider the integrated effects of numerous contaminant sources and prospective remedies. For this CIE, cumulative impacts of an action (e.g., groundwater remediation or placement of an evapotranspiration barrier over a waste site) will be viewed as the total effects on groundwater from that action, considering all other activities or likely future activities for source or groundwater OUs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technical Evaluation of Accelerated Basin De-Inventory Material Addition to Sludge Batch 11 (Rev. 1)

The Accelerated Basin De-inventory (ABD) program involves discarding spent nuclear fuel that is currently stored in L-Basin to the Defense Waste Processing Facility (DWPF) for vitrification. The first ABD discards will occur during the preparation of Sludge Batch (SB) 11. Savannah River Mission Completion has requested that the Savannah River National Laboratory assess the technical gaps related to the increased gadolinium poisoning requirement and the impacts of performing the Low Temperature Aluminum Dissolution (LTAD) process in Tank 51 with H-Canyon discards present. The following summarizes the evaluation of the impacts of increasing the quantity of gadolinium (and related topics) from what was previously evaluated in the SRNL studies of gadolinium-poisoned ABD material solubility, the overall ABD flowsheet review, and increasing the fissile mass loading in glass: 1) Based on literature surveys, there is no indication that organic interactions with gadolinium will be significant at the high pH (typically >13) conditions of the Concentration, Storage, and Transfer Facilities. Any interactions of gadolinium with organics in DWPF are not expected to adversely impact DWPF or downstream facilities. Thus, there is little-to-no residual risk from organic interactions with gadolinium [Gap closed]; 2) Adding depleted uranium to ABD material, targeting 235 U enrichment of 4.90% within each transfer window, will mitigate potential impacts from an increase in soluble 235 U enrichment during sludge washing and LTAD. The plan to take advantage of previous transfers and allow 235 U enrichment of >5% during the final transfer window carries a risk that Tank 51 supernate will have a 235 U enrichment of >5%, which should be evaluated for acceptance; 3) Increasing the gadolinium mass ratio to 3.0:1 Gd: 235 U(eq SLU ) should lead to the same or higher partitioning of gadolinium into the solid phase within the DWPF Chemical Process Cell, resulting in both liquid and solid phases with expected partitioning of Gd consistent with the prior solubility study [Gap closed for SB11]; 4) There are no expected impacts on DWPF melt temperature and melter operations due to the minimal ~0.2 weight percent (wt%) increase in Gd concentration relative to previous sludge batches [Gap closed for SB11]; 5) As observed previously, Gd is expected to enter the off-gas system via physical entrainment, but at a slightly higher concentration than what was observed for SB9 melter off-gas pluggage deposits (0.07 wt%) [Gap closed for SB11] ; 6) There are no expected impacts on DWPF recycle or the Recycle Collection Tank glycolate destruction process. [Gap closed for SB11]; 7) Gd is projected to be a trace component in the SB11 glass (<0.5 wt%) and can be ignored for process control. Trace components do not significantly impact glass durability, thus the conclusions of the previous Product Consistency Test evaluation at a fissile mass loading of 2,500 g fissile/m3 glass still applies to SB11. The ~0.1 wt% increase in Gd2O3 concentration relative to the previous study will not impact the predictability of SB11 glass with the DWPF Product Composition Control System (PCCS) models for durability or the acceptability of glass according to the Waste Acceptance Product Specifications (WAPS) criterion for product consistency [Gap closed for SB11]; 8) No additional Toxicity Characteristic Leaching Procedure testing is necessary for SB11 and the hazardous waste specification of the SB11 DWPF waste form is unchanged after the addition of the ABD stream [Gap closed for SB11]. The following summarizes the evaluation of the impacts of adding two-thirds of the ABD material to Tank 51 prior to LTAD: 1) The addition of two-thirds of the ABD increases overall aluminum mass from 1.39×10 4 kg to 1.64×10 4 kg (15.5% ABD Al). The form of the insoluble portion of the Al resulting from ABD addition should be the more readily dissolved Al(OH) 3 and amorphous forms. The portion of the ABD aluminum that is processed by LTAD is expected to be completely soluble, thus requiring that less of the boehmite in the sludge be dissolved to reach the same Al target in the SB. [Gap closed for SB11]; The expected LTAD impact on other components, as related primarily to the components in ABD, are discussed. Gd is expected to remain insoluble during LTAD and not impact the solubility of other components. [Gap closed for SB11]; The addition of two-thirds of the ABD increases overall projected SB11 uranium mass from 4,740 kg to 13,100 kg (63% ABD U) and the projected plutonium mass from 86.0 kg to 89.5 kg (3.9% ABD Pu). The addition of all of the ABD increases overall projected SB11 uranium mass from 4,740 kg to 16,100 kg (70% ABD U) and the projected plutonium mass from 86.0 kg to 90.4 kg (5.3% ABD Pu). The 235 U enrichment will be ≤5%. The fissile uranium will be adequately poisoned by Gd and the fissile Pu will be adequately poisoned by Fe from the sludge. [Gap closed for SB11]; There is a low risk that ABD addition will impact the rheology or pumpability of the slurry. There is a low but higher risk of ABD addition prior to LTAD impacting the settling rate; Based on the evaluation of adding two-thirds of the ABD material and all of the ABD material prior to the LTAD process, there is no volume or mass limit that would need to be imposed on ABD additions prior to LTAD. [Gap closed for SB11]. Revision 1 of this report addresses a variation on the ABD additions and LTAD strategy where sodium hydroxide additions for LTAD may be performed intermittently or concurrently with an ABD addition window. The proposed change does not alter the conclusions of this evaluation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technical Evaluation of Accelerated Basin De-Inventory Material Addition to Sludge Batch 11

Savannah River Nuclear Solutions has a need to discard spent nuclear fuel (SNF), currently stored in L Basin, to the Defense Waste Processing Facility (DWPF) for vitrification. The Department of Energy (DOE) has approved the Accelerated Basin De-inventory (ABD) Program for discarding SNF via transfers from H-Canyon to the Savannah River Site (SRS) Liquid Waste (LW) system. The first ABD discards will occur during the preparation of Sludge Batch (SB) 11. An initial impact evaluation of the LW flowsheet was performed by the Savannah River National Laboratory (SRNL) prior to the approval of the ABD Program. This evaluation addressed the LW downstream facilities based on the current H-Canyon flowsheet sequence for the average ABD discard. The flowsheet evaluation only included aluminum-clad SNF, specifically Materials Test Reactor (MTR) fuel and High Flux Isotope Reactor (HFIR) fuel similar to the planned SB11 discard. Following this evaluation, the flowsheet has been slightly altered to address (i) new nuclear criticality safety controls for DWPF that credit a higher amount of gadolinium as a neutron poison for all of the enriched uranium contained in a SB and (ii) potential additions of the H-Canyon neutralized fuel stream prior to the Low Temperature Aluminum Dissolution (LTAD) process in Tank 51. The early introduction of ABD material into the SB assembly process is being investigated to provide flexibility regarding transfer opportunities for H-Canyon to Tank 51 for SB11 and future sludge batches.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Technical Evaluation of Self-Protection Dose Rates in U.S. Domestic Nuclear Security Policy

U.S. nuclear security policy uses radiation self-protection as a basis for reducing material attractiveness, but existing dose-rate criteria may not reflect the time scales of theft or sabotage. This report evaluates whether the commonly cited 1 Gy/h at 1 m criterion can plausibly cause adversary task failure during short-duration malicious acts.

Fritchie, Jacob Wesley [Sandia National Laboratori↗

ES4SE Technical Assistance Program Evaluation

Technical assistance (TA) programs can provide organizations and communities with the information, tools, and resources needed to support their development and resilience goals. The Energy Storage for Social Equity (ES4SE) TA program sought to empower undeserved communities through co-development of energy storage pathways and solutions to address community-defined challenges and needs. Evaluating the design, implementation, and outcomes of TA programs like ES4SE is critical to understanding whether program and participant goals were accomplished and how to adjust the TA approach to better meet participant needs. This evaluation explores the experiences and perceptions of community participants in the ES4SE TA program.

25 ENERGY STORAGE↗

Draft Technical Impracticability Evaluation for Iodine-129 in Groundwater at Hanford: 200-UP-1 Operable Unit

Target restoration cleanup levels for contaminated groundwater are established by applicable or relevant and appropriate requirements (ARARs) determined by federal and state drinking water quality standards. When these standards cannot be met within a reasonable timeframe due to limitations of available remediation technologies or other factors, the U.S. Environmental Protection Agency (EPA) may evaluate the technical impracticability (TI) of attaining the required groundwater cleanup levels, and establish alternative, protective remedial strategies. This report provides information relevant to consideration of a TI waiver on the current federal 1 pCi/L drinking water standard (DWS) for iodine-129 in the 200-UP-1 Groundwater Operable Unit (OU) of the Hanford Site if ongoing evaluations of treatment options do not identify a feasible treatment technology.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technical Equivalency Evaluation of Lynx Electronics and Apex-InVivo software for the LLNL Whole Body Scanning Bed System

Lawrence Livermore National Laboratory (LLNL) Whole Body Counter (WBC) is replacing the following components for its scanning bed counting system: NIM electronics with modern Lynx electronics, The Alpha Workstation running VMS with a PC running Windows , and Abacos-Plus in-vivo counting software with the new Apex-InVivo software. These new components provide a compact design, extend the lifecycle of the system as a whole, reduce maintenance and user time, an improve overall ease of use. The technical evaluations and results described in this document demonstrate that the total system, incorporating these new components, provides results that comply with Internal Dosimetry requirements.

61 RADIATION PROTECTION AND DOSIMETRY↗

LAMP Technical Readiness Evaluation Report (Rev. 1)

An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed. Corresponding Technical Readiness Levels (TRLs) were also determined for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. The scope of the evaluation was limited to the project Work Breakdown Structure (WBS) elements as defined for the RFQ Injector and Drift Tube Linac (DTL) systems only. Integration of Instrumentation and Controls (I&C) and Safety Systems was not considered, although specific technologies as related to the RFQ and DTL systems were included. Other elements of the project such as Shielding, System Design, Technical Management, and additional facility integration needed to enable off-line testing and pre-installation commissioning were also not evaluated. Each technical subsystem element was evaluated for technical readiness, however, not all were found to meet the criteria for a CTE. Only two subsystem elements were determined to meet the CTE criteria. Their associated TRLs are summarized in the table below. These subsystem elements of the project have the lowest technical readiness due to either being new, novel or modified, requiring additional R&D before being capable of meeting the project Key Performance Parameters (KPPs) and subsystem requirements, or present technology exists but has not yet been demonstrated in a relevant environment. All other subsystems were determined to have a TRL of 8, indicating that actual operating systems exist having similar performance requirements as needed for LAMP. Details of the technical readiness evaluation for each subsystem is given in the following sections of this report.

43 PARTICLE ACCELERATORS↗

LAMP Technical Readiness Evaluation Report

An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed in 2023. This included determining corresponding Technical Readiness Levels (TRLs) for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. This revised report includes a summary of the recent design modifications required to meet the project Key Performance Requirements (KPPs), some of which may reduce technical risk to the project. These recent design modifications include: • Further optimization of the low-energy and medium-energy beam transport regions (LEBT and MEBT, respectively), including relocation of various functional elements (ie choppers, kickers, and bunchers). • An additional H - ion source to separate ion-source function based on beam delivery requirements. • A high-repetition-rate pulsed kicker magnet to select/merge the two H ion beams into a common low-energy beam transport. • Modification and further optimization to a more conventional RFQ design. Performance of the RFQ has been optimized to deliver the required three types of beams while meeting the project KPPs. • The addition of a second chopper in the medium-energy beam transport (MEBT) line to reduce the required pulser voltages. The scope of the evaluation was limited to the project Work Breakdown Structure (WBS) elements as defined for the RFQ Injector and Drift Tube Linac (DTL) systems only. Integration of Instrumentation and Controls (I&C) and Safety Systems was not considered, although specific technologies as related to the RFQ and DTL systems were included. Other elements of the project such as Shielding, System Design, Technical Management, and additional facility integration needed to enable off-line testing and pre-installation commissioning were also not evaluated. Each technical subsystem element was evaluated for technical readiness, however, not all were found to meet the criteria for a CTE. Three subsystem elements were determined to meet the CTE criteria. Their associated TRLs are summarized in the table below. These subsystem elements of the project have the lowest technical readiness due to either being new, novel or modified, requiring additional R&D before being capable of meeting the project Key Performance Parameters (KPPs) and subsystem requirements, or present technology exists but has not yet been demonstrated in a relevant environment. All other subsystems were determined to have a TRL of 8, indicating that actual operating systems exist having similar performance requirements as needed for LAMP. Details of the technical readiness evaluation for each subsystem is given in the following sections of this report.

43 PARTICLE ACCELERATORS↗

Technical Equivalency Evaluation of Electrically Cooled Detectors for the In Vivo Measurement of Low Energy Photon Emitters in Human Lungs

LLNL maintains equipment, capability, and operations to measure low energy photon emitting radionuclides potentially deposited inside of workers. Ongoing quality improvement includes the maintenance of detection systems capable of measuring radionuclides o f interest to the LLNL Health and Safety program. This document describes the technical equivalency evaluation of upgraded detectors for LLNL’s routine lung measurement program.

61 RADIATION PROTECTION AND DOSIMETRY↗

Advanced Vehicle Testing and Evaluation Final Technical Report Encompassing Project Activities From October 1, 2011 to April 30, 2018

The Advanced Vehicle Testing and Evaluation (AVTE) project incorporated the conduct of advanced technology vehicle and infrastructure testing in the U.S. Department of Energy (DOE) Advanced Vehicle Testing Activity (AVTA). It was the only activity tasked by DOE to conduct independent field evaluations of vehicle technologies that use advanced technology systems and subsystems in vehicles that reduce petroleum consumption. The results are available through reports published on the AVTA website at http://avt.inl.gov/. The AVTE project provided insight into advanced vehicle technology's long-term performance, durability, maintenance, and lifecycle costs that cannot be found elsewhere. The site is a resource for DOE stakeholders and the public to gain knowledge on advanced technology vehicle progress and innovation. Vehicles tested included light and heavy-duty vehicles with conventional, hybrid, plug-in hybrid, and all-electric propulsion systems. Vehicles were tested on closed tracks and chassis dynamometers, as well as operated on public roads, in fleet operations, and over prescribed routes. All testing was controlled by procedures developed specifically to support such testing. Testing and evaluations were conducted in the following phases: Development and refinement of test procedures, which established testing procedures; Baseline performance testing, which established a performance baseline; Accelerated reliability testing, which determined vehicle reliability; Fleet testing, used to evaluate vehicle economics in fleet operation, and End of test performance evaluation. Test results from all aspects of testing were posted by Idaho National Laboratory (INL) to their website. This final report documents work conducted for the entirety of contract DE-EE0005501 by Intertek Testing Services NA, Inc. (Intertek). The contract was performed from October 1, 2011 through April 30, 2018, and includes 18 amendments to the original award with the most recent Amendment 18 dated March 28, 2018. The final budget for the AVTE project totaled 20,220,873 dollars. As a cooperative agreement, Intertek was obligated to provide cost share of 4,044,175 dollars, leaving 16,176,698 dollars as the Federal share of the agreement. Actual total expenditure for the AVTE project was 20,286,850 dollars. The full 16,176,698 dollars Federal share was expended and 4,110,152 dollars of cost share was provided by Intertek. This resulted in an over-share of 65,977 dollars. There were 106 light-duty on-road vehicles vehicles tested in both fleet and accelerated reliability testing. One additional vehicle was rented to obtain performance testing only. Three heavy-duty truck and trailer combinations were tested as part of the semi-autonomous driving with heavy-duty vehicles in a platoon. Overall project scope and direction was determined between Intertek, DOE, and technical teams from Idaho National Laboratory (INL), Argonne National Laboratory (ANL), and National Renewable Energy Laboratory (NREL). The project was administered by the DOE’s National Energy Technology Laboratory (NETL).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

LAMP Technical Readiness Evaluation Report: LAMP-ENG-RPT-003 (Revision 2)

An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed in 2023. This included determining corresponding Technical Readiness Levels (TRLs) for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. This revised report includes a summary of the recent design modifications required to meet the project Key Performance Requirements (KPPs), some of which may reduce technical risks to the project. These recent design modifications are based on the LAMP Conceptual Design which is the design evaluated in this document and include: • Further optimization of the low-energy and medium-energy beam transport regions (LEBT and MEBT, respectively), including relocation of various functional elements (i.e. choppers, kickers, and bunchers). • An additional 100-keV H - ion source to separate ion-source function based on beam delivery requirements. • A high-repetition-rate pulsed kicker magnet to select/merge the two H - ion beams into a common low-energy beam transport. • Modification and further optimization to a more conventional 3-MeV Radio Frequency Quadrupole (RFQ) design. Performance of the RFQ has been optimized to deliver the required three types of beams while meeting the project Key Performance Parameters (KPPs). • The addition of a second chopper in the medium-energy beam transport (MEBT) line to reduce the required pulser voltages.

43 PARTICLE ACCELERATORS↗