Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “tactical rescheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Integrated Demand Management: Minimizing Unanticipated Excessive Departure Delay while Ensuring Fairness from a Traffic Management Initiative

This paper introduces NASA's Integrated Demand Management (IDM) concept and presents the results from an early proof-of-concept evaluation and an exploratory experiment. An initial development of the concept was focused on integrating two systems - i.e. the FAA's newly deployed Traffic Flow Management System (TFMS) tool called the Collaborative Trajectory Options Program (CTOP) and the Time-Based Flow Management (TBFM) system with Extended Metering (XM) capabilities to manage projected heavy traffic demand into a capacity-constrained airport. A human-in-the-loop (HITL) simulation experiment was conducted to demonstrate the feasibility of the initial development of the concept by adapting it to an arrival traffic problem at Newark Liberty International Airport (EWR) during clear weather conditions. In this study, the CTOP was utilized to strategically plan the arrival traffic demand by controlling take-off times of both short- and long-haul flights (long-hauls specify aircraft outside TBFM regions and short-hauls specify aircraft within TBFM regions) in a way that results in equitable delays among the groups. Such strategic planning allows less airborne delay to occur within TBFM by feeding manageable long-haul traffic demand while reserving sufficient slots in the overhead streams for the short-haul departures. The manageable traffic demand indicates the TBFM scheduler assigns no more airborne delay than its assigned airspace is capable of absorbing. TBFM then uses its time-based metering capabilities to deliver the desirable throughput by tactically rescheduling the TBFM entered long-haul flights and short-haul departures. Additional research was also performed to explore use of Required Time of Arrival (RTA) capabilities as a potential control mechanism for the airborne flights to improve arrival traffic delivery accuracy of scheduled long-haul traffic demand. The study results show that both short- and long-haul flights received similar ground delays. In addition, there was a noticeable reduction in the total amount of excessive unanticipated last-minute ground delays, i.e. delays that are frequently imposed on the short-haul flight in current day operations due to saturation in the overhead stream, commonly referred to as 'double penalty'. Furthermore, the concept achieved the target throughput while minimizing the expected cost associated with overall delays in arrival traffic. Assessment of the RTA capabilities showed that there was indeed improvement of the scheduled entry times into TBFM regions by using RTA capabilities. However, with respect to reduction in delays incurred within TBFM, there was no observable benefit of improving the precision of long-haul flights entry times.

Collaborative Trajectory Options Program (CTOP)↗

Precision Arrival Scheduling for Tactical Reconfiguration

This research adapts the concept of precision arrival scheduling to accommodate reconfiguration operations between two sets of fixed arrival routes modeled for Chicago O'Hare International Airport (ORD). Integrated fixed path routing from en-route to runways was modeled for ORD's top two peak traffic configurations, as well as transition routing between the two configurations. A first-come-first-served multi-point scheduler was adapted to the reconfiguration problem by prioritizing the rescheduling of aircraft within the terminal airspace at the time of reconfiguration notification. Arrival rescheduling was then tested for a range of arrival rates and reconfiguration notification lead-times in fasttime simulation. Reconfigurations with lead-times as short as 10 minutes at a nominal static configuration arrival rate (~25 arrivals per quarter hour) could be accommodated with little impact to throughput. However, as lead-time shortened below 25 minutes, individual aircraft efficiency quickly degraded due to extra flight time at lower altitude and speed. In general, first-come-first-served arrival scheduling on fixed routing for this sample reconfiguration problem is promising if at least 10-15 minutes lead-time is given before the reconfiguration is in effect.

airport reconfiguration↗

Airspace Technology Demonstration 2 (ATD-2): Analysis of APREQ Flights at CLT

5/22/2019 National Aeronautics and Space Administration 1 Airspace Technology Demonstration 2 (ATD-2) Analysis of APREQ Flights at CLT May 22, 2019 5/22/2019 Objective 2 Quantify impact of IADS Phase 1 & 2 capabilities on APREQ flights at CLT with respect to: • Compliance to the Controlled Take Off Time (CTOT) • Benefits for APREQ flights that use IDAC to renegotiate for an earlier CTOT • Benefits of pre-scheduling APREQ flights using the Earliest Off Block Time (EOBT) • Relationship between EOBT compliance and rescheduling CTOT 5/22/2019 CLT APREQ Daily Compliance(Compliance Improvement Since ATD-2 Start) 3 Steady increase of APREQ compliance over the life of the project. Reduced variation in compliance leading to improved predictability. In addition to overall improved compliance into TBM systems, the predictability is increasing 5/22/2019 APREQ Compliance 10K Rolling Window 4 The most substantial APREQ compliance improvements started with Phase 2 capability (AEFS integration, ZTL IDAC, pre-scheduling and scheduler updates). 5/22/2019 IADS Phase 1 & 2 Benefit Mechanisms 5 1. Collaborative surface metering •Reduced engine run time •Reduced fuel consumption and emissions 2. Overhead stream operational integration a.Scheduling controlled flights at the gate •Reduced engine run time •Reduced fuel consumption and emissions b.APREQ renegotiating for an earlier slot •Reduced total delay •Passenger value of time and crew costs •Reduced engine run time •Reduced fuel consumption and emissions Benefits (1) and (2a) achieved through tactical gate holds Benefit (2b) achieved through APREQ renegotiation process described below Step 1: APREQ flight has a release time but is capable of taking off earlier Step 2: FAA TMC uses the IDAC green space / red space to identify and request an earlierslot in the overhead stream Step 3: Aircraft receives earlierrelease time and the difference between the release times is the reduction in delay 5/22/2019 Benefits for APREQ flights using IDAC to renegotiate for earlierCTOT 6 LBS Fuel 270.7 hours of delay saved by electronically renegotiating a better overhead stream time for 2,071 flights. • The benefits described here are associated with better use of existing capacity in the overhead stream, and technology to reduce surface delay. •These benefits are in addition to (distinct from) surface metering savings. 5/22/2019 APREQ Delay For Pre-Scheduled Flights into KATL Have Been Reduced and are More Predictable For the Last Five Months 7 Substantial Improvements in predictability of delay for the last 5 months 5/22/2019 EOBT Compliance / CTOT Reschedulefor Pre-Scheduled Flights into KATL 8 5/22/2019 Wrap-up 9 • Compliance to the CTOT has improved throughout the lifecycle of ATD-2 with biggest improvements following the introduction of Phase 2 capabilities • Rescheduling APREQ flights using IDAC has reduced 270.7 hours of delay at CLT • Predictability of local surface delay for APREQ flights is substantially improved via pre-scheduling with the IADS system • Pre-scheduled flights that reschedule for later times tend to call ready later with respect to EOBT

CLT↗