Engineering PapersSearch

SEARCH · Engineering Papers

Results for “surface extremes”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Powering the Lunar Surface: Managing Dust, Extreme Environments, and Power Needs

Power availability remains one of the primary constraints for lunar surface science. This talk reviews power requirements from previously flown instruments to help prepare future payloads for upcoming CLPS opportunities and highlights the testing and environmental simulation capabilities at NASA JSC that enable reliable lunar payload development. It also outlines the power needs, environmental challenges, and emerging technologies required to support sustained human and robotic operations on the lunar surface as part of NASA’s Moon to Mars strategy. Key challenges include variable solar illumination at polar and equatorial regions, extreme thermal environments, and dust driven degradation that limit current surface power systems. The science data needed for resource identification and landing site planning will allow for the successful preparation of crewed Artemis activities and long-term presence. Building on recent missions, current test infrastructure, and emerging power technology pathways, this presentation equips industry, academia, and government teams with the information needed to design robust lunar payloads, reduce development risk, and fully leverage the increasing cadence of CLPS missions. These developments will form a critical technical foundation for long duration lunar presence and future Mars exploration.

Anastasia Ford

Powering the Lunar Surface: Managing Dust, Extreme Environments, and Power Needs

Power availability remains one of the primary constraints for lunar surface science. This talk reviews power requirements from previously flown instruments to help prepare future payloads for upcoming CLPS opportunities and highlights the testing and environmental simulation capabilities at NASA JSC that enable reliable lunar payload development. It also outlines the power needs, environmental challenges, and emerging technologies required to support sustained human and robotic operations on the lunar surface as part of NASA’s Moon to Mars strategy. Key challenges include variable solar illumination at polar and equatorial regions, extreme thermal environments, and dust driven degradation that limit current surface power systems. The science data needed for resource identification and landing site planning will allow for the successful preparation of crewed Artemis activities and long-term presence. Building on recent missions, current test infrastructure, and emerging power technology pathways, this presentation equips industry, academia, and government teams with the information needed to design robust lunar payloads, reduce development risk, and fully leverage the increasing cadence of CLPS missions. These developments will form a critical technical foundation for long duration lunar presence and future Mars exploration.

lunar power

Terrestrial Environment (Climatic) Criteria Guidelines for Use in Aerospace Vehicle Development, 1973 Revision

This document provides guidelines on probable climatic extremes and probabilities-of-occurrence of terrestrial environment data specifically applicable for NASA space vehicles and associated equipment development. The geographic areas encompassed are The Eastern Test Range (Cape Kennedy, Florida); Huntsville, Alabama; New Orleans, Louisiana; The Space and Missile Test Center (Vandenberg AFB California); Sacramento, California; Wallops Test Range (Wallops Island, Virginia); White Sands Missile Range, New Mexico; and intermediate transportation areas. In addition, sections have been included to provide information on the general distribution of natural environment extremes in the United States (excluding Alaska and Hawaii), cloud cover, and some worldwide climatic extremes. Although all these areas are covered, the major emphasis is given to the Kennedy Space Center launch area and Vandenburg Air Force Base due to importance in NASA's future large space vehicle programs. This document presents the latest available information on probable climatic extremes, and supersedes information presented in TM X-64589. The information in this document is recommended for employment in the development of space vehicles and associated equipment design and operational criteria, unless otherwise stated in contract work specifications.

cloud cover

Raising TRL of Your Lunar Payload

Preparing payloads for the lunar surface requires rigorous testing that accurately captures the extreme environmental and operational conditions. This presentation provides an overview of the lunar relevant test capabilities at NASA JSC’s Astromaterials Research and Exploration Science (ARES) laboratories as well as the Energy System Test Area (ESTA) Lunar Development and Test Facility. These facilities allow teams to assess hardware performance in dusty vacuum environments, characterize interactions with high fidelity lunar regolith simulants, evaluate mechanical and thermal durability, and understand the effects of micrometeoroid and orbital debris impacts—critical factors for certifying payloads that will operate on the lunar surface or in orbit. While Lunar power challenges such as variable illumination, extreme temperatures, and dust driven degradation will be briefly summarized, the focus of this talk is on how JSC’s test infrastructure enables developers to validate designs, reduce mission risk, and ensure compatibility with CLPS and Artemis objectives. NASA JSC’s expertise and experience help industry, academic, and government teams prepare robust hardware ready for successful delivery and operation on the surface of the Moon.

Lunar Regolith Simulant

Raising TRL of Your Lunar Payload

Preparing payloads for the lunar surface requires rigorous testing that accurately captures the extreme environmental and operational conditions. This presentation provides an overview of the lunar relevant test capabilities at NASA JSC’s Astromaterials Research and Exploration Science (ARES) laboratories as well as the Energy System Test Area (ESTA) Lunar Development and Test Facility. These facilities allow teams to assess hardware performance in dusty vacuum environments, characterize interactions with high fidelity lunar regolith simulants, evaluate mechanical and thermal durability, and understand the effects of micrometeoroid and orbital debris impacts—critical factors for certifying payloads that will operate on the lunar surface or in orbit. While Lunar power challenges such as variable illumination, extreme temperatures, and dust driven degradation will be briefly summarized, the focus of this talk is on how JSC’s test infrastructure enables developers to validate designs, reduce mission risk, and ensure compatibility with CLPS and Artemis objectives. NASA JSC’s expertise and experience help industry, academic, and government teams prepare robust hardware ready for successful delivery and operation on the surface of the Moon.

Laboratories

Erosion Behavior of Ti-hBN Multifunctional Coatings in A Custom-Made Planetary Test Rig at Extreme Lunar Temperatures

Spacecraft landings and takeoffs on the lunar surface, along with extreme temperature variations between day and night (-196 to 150° C), cause high-velocity dust impacts and erosion, resulting in the premature failure of structures. Ti/2 vol% hBN coatings were deposited using atmospheric (APS) and vacuum plasma spray (VPS) using cryo-milled powder feedstock to protect the structural components. The erosion performance of coatings at extreme lunar temperature regimes (-150 to 150° C) was evaluated in a custom-made planetary erosion test rig (PETR) at low (50 mph) and high impact velocities (250 mph). The mass loss of VPS coatings was reduced by 50% compared to the APS coatings and 40% compared to the Ti6Al4V substrate. The cryogenic temperature induces brittleness in the material, rendering it susceptible to extreme conditions of material loss. The particle impact-deformation behavior was captured using a high-speed camera to study the erosion mechanism. This analysis revealed chipping in substrates and brittle APS coatings, while particles rebounding and embedding were observed in VPS coatings. Energy calculations, aided by particle trajectory tracking from the high-speed camera, have conclusively shown that VPS coatings absorb 5–10% more energy than APS coatings during erosion tests. A modified erosion index was developed incorporating the fracture toughness and temperatures. New erosion models for brittle and ductile target materials are proposed for developing erosion-resistant material systems.

Abhijith Kunneparambil Sukumaran

Expanding the Horizons of Polymer Aerogels

As the Space Community endeavors to reach new heights of human exploration, materials for extreme environments are at the forefront of research. One class of materials of particular focus are polymer aerogels; lightweight solids with nanoscale pore size, high internal surface area, and extremely high porosities. These interesting properties allow aerogels to act as superior thermal insulators, IR scattering filters, sensor platforms, and vibro-acoustic mitigating materials. Polymer aerogels also have the potential to combat issues found in lunar environments such as dust and radiation mitigation. Herein, past and present research, synthesis, and applications of polymer aerogels will be discussed.

Stephanie L Vivod

Simulating the Lunar Thermal Environment for the Surface-Deployed LEMS Artemis III TVAC Test

The Lunar Environment Monitoring Station (LEMS) is an autonomous, survive-the lunar-night seismic suite to be deployed on the Lunar surface by the Artemis III crew and designed to operate continuously for two years. It will see the extremes of the Lunar south pole thermal environment where surface temperatures range from -200°C to +20°C and where nighttime duration is at least 354 hours. Given power and mass constraints, the thermal system is limited to 2.5 Watts of heat during the lunar night. Presented is the system thermal vacuum test plan and configuration to validate the thermal control system performance in a flight-like environment. The test will measure the nighttime heat leaks for the bus and 18 seismometers to ensure lunar night survival and operability.

Thermal

Simulating the Lunar Thermal Environment for the Surface-Deployed LEMS Artemis III TVAC Test

The Lunar Environment Monitoring Station (LEMS) is an autonomous, survive-the lunar-night seismic suite to be deployed on the Lunar surface by the Artemis III crew and designed to operate continuously for two years. It will see the extremes of the Lunar south pole thermal environment where surface temperatures range from -200°C to +20°C and where nighttime duration is at least 354 hours. Given power and mass constraints, the thermal system is limited to 2.5 Watts of heat during the lunar night. Presented is the system thermal vacuum test plan and configuration to validate the thermal control system performance in a flight-like environment. The test will measure the nighttime heat leaks for the bus and 18 seismometers to ensure lunar night survival and operability.

Thermal

Simulating the Lunar Thermal Environment for the Surface-Deployed LEMS Artemis III TVAC Test

The Lunar Environment Monitoring Station (LEMS) is an autonomous, survive-the lunar-night seismic suite to be deployed on the Lunar surface by the Artemis III crew and designed to operate continuously for two years. It will see the extremes of the Lunar south pole thermal environment where surface temperatures range from -200°C to +20°C and where nighttime duration is at least 354 hours. Given power and mass constraints, the thermal system is limited to 2.5 Watts of heat during the lunar night. Presented is the system thermal vacuum test plan and configuration to validate the thermal control system performance in a flight-like environment. The test will measure the nighttime heat leaks for the bus and 18 seismometers to ensure lunar night survival and operability.

TVAC

Harness Thermal Heat Loss Measurement for a Lunar Surface-Deployed LEMS Artemis III Payload

The Lunar Environment Monitoring Station (LEMS) is an autonomous, survive-the-lunar-night seismic suite to be deployed on the Lunar surface by the Artemis III crew and designed to operate continuously for two years. It will see the extremes of the Lunar south pole thermal environment where surface temperatures range from -200°C to +20°C and where nighttime duration is at least 354 hours. Given power and mass constraints, the thermal system is limited to 2.5 Watts of heat during the lunar night. The electrical harnessing named the Signal and Power Passthrough (SAPP) was designed to minimize heat loss while meeting power and signal integrity requirements. To mitigate risk due to uncertainty associated with the harnessing materials, routing, and tie-downs, a flight-like thermal conductance test was performed to measure the heat loss. The test methodology, results, and model correlation are presented.

TVAC

Harness Thermal Heat Loss Measurement for A Lunar Surface-Deployed LEMS Artemis III Payload

The Lunar Environment Monitoring Station (LEMS) is an autonomous, survive-the-lunar-night seismic suite to be deployed on the Lunar surface by the Artemis III crew and designed to operate continuously for two years. It will see the extremes of the Lunar south pole thermal environment where surface temperatures range from -200°C to +20°C and where nighttime duration is at least 354 hours. Given power and mass constraints, the thermal system is limited to 2.5 Watts of heat during the lunar night. The electrical harnessing named the Signal and Power Passthrough (SAPP) was designed to minimize heat loss while meeting power and signal integrity requirements. To mitigate risk due to uncertainty associated with the harnessing materials, routing, and tie-downs, a flight-like thermal conductance test was performed to measure the heat loss. The test methodology, results, and model correlation are presented.

Thermal

Harness Thermal Heat Loss Measurement for A Lunar Surface-Deployed LEMS Artemis III Payload

The Lunar Environment Monitoring Station (LEMS) is an autonomous, survive-the-lunar-night seismic suite to be deployed on the Lunar surface by the Artemis III crew and designed to operate continuously for two years. It will see the extremes of the Lunar south pole thermal environment where surface temperatures range from -200°C to +20°C and where nighttime duration is at least 354 hours. Given power and mass constraints, the thermal system is limited to 2.5 Watts of heat during the lunar night. The electrical harnessing named the Signal and Power Passthrough (SAPP) was designed to minimize heat loss while meeting power and signal integrity requirements. To mitigate risk due to uncertainty associated with the harnessing materials, routing, and tie-downs, a flight-like thermal conductance test was performed to measure the heat loss. The test methodology, results, and model correlation are presented.

TVAC

Mechanical Design and Operation of a Novel Lunar Environment Structural Test Rig (LESTR)

The Lunar Environment Structural Test Rig (LESTR) was developed to address a critical gap in mechanical property data for metal alloy wire materials under lunar-relevant conditions down to 40 K. Conventional aerospace material databases provide thermophysical properties for bulk metals over a wide temperature range, but validated mechanical and physical property data below 77 K, particularly for small-diameter wires, remain limited and are generally the exception rather than the rule. These conditions are essential for Artemis mission hardware such as shape memory alloy (SMA) rover tires. LESTR’s design requirements were to combine a high-stiffness electrodynamic load frame with closed- cycle cryogenic cooling, high-vacuum capability (10–6 torr), and noncontact optical strain measurement to enable tensile, four-point bend, and fatigue testing of wires or other materials and geometries at temperatures from 40 to 125 K. These considerable requirements were merged with the need to lower the barrier of testing for the end user as measured in terms of cost-per-test cycle, safety improvement, and reduction in upkeep costs associated with state-of-the-art solutions associated with cryomechanical material characterization. The system incorporates modular gripping and alignment fixtures; precision thermal management using cryocoolers and embedded heaters; and integrated instrumentation for displacement, load, temperature, and vacuum control. Calibration procedures establish correlations between tooling and specimen temperature, ensuring accurate thermal conditions across the design envelope unbound by cryofluid conditions in heritage immersion-based test systems. Initial validation tests using Inconel (Special Metals Corp.) wire demonstrated accurate ultimate strength and post-yield behavior. The load frame operation was also verified under representative service conditions, including thermal cycling and prolonged fatigue loading. By generating mechanical property data at ultralow temperatures, LESTR fills a critical gap in existing materials databases and provides a scalable platform for iterative alloy development and durability assessment for planetary hardware. This capability supports NASA’s long-term objectives for surface exploration by enabling design confidence for components operating in extreme cryogenic environments.

LESTR

Advanced Materials for the Lunar Surface: Multiscale Computational Design of Refractory Alloys and Carbides

Emerging operational environments, such as the lunar surface, present novel challenges for NASA and drive the need for advanced materials in applications like fission surface power systems. To address these demands, computational materials science is rapidly evolving to augment or replace costly and hazardous empirical testing. Although materials selection at NASA remains predominantly experimentally driven, advanced simulation methodologies are being steadily integrated into the engineering lifecycle. This work details the application of multiscale simulation techniques—including first-principles calculations, CALPHAD, dislocation dynamics, and molecular dynamics—at NASA's Ames Research Center to evaluate advanced materials for extreme environments. First, we present contributions to the Space Nuclear Propulsion Project. Be-cause propellant channel coatings in nuclear thermal rockets must withstand high-pressure, high-temperature hydro-gen, optimizing these materials is critical. First-principles calculations were employed to establish a rigorous quantitative and qualitative understanding of the behavior of the refractory carbides ZrC, NbC, and their mixtures in high-enthalpy hydrogen environments. This necessitated the generation of high-fidelity thermodynamic models for both stoichiometric and carbon-depleted carbides, both with and without the presence of hydrogen. Furthermore, we highlight efforts under the Refractory Alloy Additive Manufacturing Build Optimization (RAAMBO) project, where existing and novel alloy compositions were assessed for additive manufacturing printability and subsequent performance in applications such as heat pipes and rocket nozzle extensions. This was accomplished through a comprehensive multiscale simulation framework that bridged the gap from the nanometer to the millimeter scale. Across both initiatives, rigorous validation against empirical data was prioritized. By systematically employing a verified and validated computational frame-work, we demonstrate how simulation effectively supports multidisciplinary engineering efforts, builds project-wide confidence, and drives critical materials development.

computational materials