Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “subtransmission”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Monte Carlo-based Transmission and Subtransmission Recovery Simulation of Hurricanes

High-impact low-probability (HILP) events can wreak havoc on electric power systems without appropriate preparedness. In this paper, the recent development of a tool, named Recovery Simulator and Analysis (RSA), is described and demonstrated. While there are many issues to consider when recovering electric power systems, the focus of RSA is on the coordination of transmission and subtransmission recovery with generation dispatch to minimize unserved energy. RSA focuses on recovery simulation to evaluate resilience as part of a planning process. RSA is demonstrated on an approximately 1400-bus Puerto Rican power system for 100 simulated instances of Hurricane Maria. Analysis of the recovery determines how many lines are critical to the recovery and which loads may experience delayed recovery. The results demonstrate the potential uses of RSA for identifying recovery decisions with low unserved energy and for identifying assets critical to recovery which can then be hardened prior to a HILP event.

Maloney, Patrick R.↗

PacWave Grid Integration Study: Transient and Dynamic Conditions (Final Report)

This report describes the results of PSCAD simulations that were performed in 2020 to assess the impacts of PacWave generation on CLPUD's 12.47-kV distribution and 69-kV subtransmission systems. PacWave South (PacWave) is a wave energy test facility planned by Oregon State University. PacWave shore facilities will be located south of Seal Rock on the Oregon coast. PacWave is expected to be operational in 2022 and will connect up to 10 MW of generation to CLPUD's Seal Rock distribution feeder.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hawaiian Electric Company (HECO) Grid Optimization with Solar (Cooperative Research and Development Final Report)

The purpose of this project is to provide a software platform that gives utility companies the capability to seamlessly dispatch legacy devices (at both the distribution and subtransmission levels) and distributed energy resources (DERs) to achieve system-wide performance and reliability targets–such as minimizing loss, reducing voltage violation, and corresponding imbalance–for extreme solar futures with well over 100% (capacity) penetrations.

14 SOLAR ENERGY↗

Review of Technical Requirements for Inverter-Based Resources in Chile

This document compares the technical requirements in the grid code of Chile (NTSyCS) against the EirGrid (Ireland transmission system operator) and National Grid Electricity System Operator (NESO) grid codes and the Institute of Electrical and Electronics Engineers (IEEE) 2800-2022 standard for conventional inverter technology at the transmission and subtransmission levels in the process of being adopted by system operators in the U.S. The document is intended to be a guide and reference for future updates of the NTSyCS, considering the local system requirements and present improvements in inverter-based resource (IBR) technology. In light of the findings of the aforementioned comparative review, this document proposes and describes the requirements for conventional IBRs that could be incorporated and updated into the Chilean grid code. The document is structured around the main grid challenges posed by the transition to an IBR-dominated grid and conventional IBRs capabilities to help address them. This document does not provide guidance on how this specification should be implemented (e.g., through a mandate or market solution).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Initial utility experience with cluster of three Mod-2 wind turbine systems

This paper describes the initial utility experiences of operating three MOD-2s during the Engineering Acceptance Testing. Electrical quantities of bus voltage, phase currents and power are initially being recorded to evaluate impacts to customers on the 69-kV subtransmission line during synchronization and operation of one or more WTSs. To date, effects on the system have been essentially undetectable. Measurements of television signal strengths were taken at an existing television remote pickup and relay station at the WTS site. Potential TV signal interference problems from the WTSs have been avoided by replacing the remote pickups with microwave repeater links for the four TV channels received from Portland, Oregon. Preliminary measurements of audible and sub-audible noise levels indicate that the upwind rotor, tubular tower design of the MOD-2 does not have the pulsing high intensity infrasound problems experienced by the MOD-1 machine at Boone, North Carolina.

Seely, D. B.↗