Engineering PapersSearch

SEARCH · Engineering Papers

Results for “subsea system”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Evaluation of Underwater Adhesives and Friction Coatings for In Situ Attachment of Fiber Optic Sensor System for Subsea Applications

Integrity and performance monitoring of subsea pipelines and structures provides critical information for managing offshore oil and gas production operation and preventing environmentally damaging and costly catastrophic failure. Currently pipeline monitoring devices require ground assembly and installation prior to the underwater deployment of the pipeline. A monitoring device that could be installed in situ on the operating underwater structures could enhance the productivity and improve the safety of current offshore operation. Through a Space Act Agreement (SAA) between the National Aeronautics and Space Administration (NASA) Johnson Space Center (JSC) and Astro Technology, Inc. (ATI), JSC provides technical expertise and testing facilities to support the development of fiber optic sensor technologies by ATI. This paper details the first collaboration effort between NASA JSC and ATI in evaluating underwater applicable adhesives and friction coatings for attaching fiber optic sensor system to subsea pipeline. A market survey was conducted to examine different commercial ]off ]the ]shelf (COTS) underwater adhesive systems and to select adhesive candidates for testing and evaluation. Four COTS epoxy based underwater adhesives were selected and evaluated. The adhesives were applied and cured in simulated seawater conditions and then evaluated for application characteristics and adhesive strength. The adhesive that demonstrated the best underwater application characteristics and highest adhesive strength were identified for further evaluation in developing an attachment system that could be deployed in the harsh subsea environment. Various friction coatings were also tested in this study to measure their shear strengths for a mechanical clamping design concept for attaching fiber optic sensor system. A COTS carbide alloy coating was found to increase the shear strength of metal to metal clamping interface by up to 46 percent. This study provides valuable data for assessing the feasibility of developing the next generation fiber optic senor system that could be retrofitted onto existing subsea pipeline structures.

Tang, Henry H.

Development and Testing of a Friction-Based Post-Installable Fiber-Optic Monitoring System for Subsea Applications

This paper presents the design and development of a friction-based coupling device for a fiber-optic monitoring system capable of measuring pressure, strain, and temperature that can be deployed on existing subsea structures. A summary is provided of the design concept, prototype development, prototype performance testing, and subsequent design refinements of the device. The results of laboratory testing of the first prototype performed at the National Aeronautics and Space Administration (NASA) Johnson Space Center (JSC) are also included. Limitations of the initial concept were identified during testing and future design improvements were proposed and later implemented. These new features enhance the coupling of the sensor device and improve the monitoring system measurement capabilities. A major challenge of a post-installed instrumentation monitoring system is to ensure adequate coupling between the instruments and the structure of interest for reliable measurements. Friction-based devices have the potential to overcome coupling limitations caused by marine growth and soil contamination on flowlines, risers, and other subsea structures. The work described in this paper investigates the design and test of a friction-based coupling device (herein referred to as a friction clamp) which is suitable for pipelines and structures that are suspended in the water column as well as for those that are resting on the seabed. The monitoring elements consist of fiberoptic sensors that are bonded to a stainless steel clamshell assembly with a high-friction surface coating. The friction clamp incorporates a single hinge design to facilitate installation of the clamp and dual rows of opposing fasteners to distribute the clamping force along the structure. The friction clamp can be modified to be installed by commercial divers in shallow depths or by remotely operated vehicles in deep-water applications. NASA-JSC was involved in the selection and testing of the friction coating, and in the design and testing of the prototype clamp device. Four-inch diameter and eight-inch diameter sub-scale friction clamp prototypes were built and tested to evaluate the strain measuring capabilities of the design under different loading scenarios. The testing revealed some limitations of the initial design concept, and subsequent refinements were explored to improve the measurement performance of the system. This study was part of a collaboration between NASA-JSC and Astro Technology Inc. within a study called Clear Gulf. The primary objective of the Clear Gulf study is to develop advanced instrumentation technologies that will improve operational safety and reduce the risk of hydrocarbon spillage. NASA provided unique insights, expansive test facilities, and technical expertise to advance technologies that will benefit the environment, the public, and commercial industries.

Bentley, Nicole L.

Subsea approach to work systems development

Self-contained undersea working environments with applications to space station EVA environments are discussed. Physiological limitations include decompression, inert gas narcosis, high-pressure nervous system, gas toxicity, and thermal limitations. Work task requirements include drilling support, construction, inspection, and repair. Work systems include hyperbaric diving, atmospheric work systems, tele-operated work systems, and hybrid systems. Each type of work system is outlined in terms of work capabilities, special interface requirements, and limitations. Various operational philosophies are discussed. The evolution of work systems in the subsea industry has been the result of direct operational experience in a competitive market.

Gernhardt, M. L.

Electrifying Subsea Infrastructure Through Ocean-Powered Systems

This paper explores the potential for electrifying subsea oil and gas infrastructure using wave-powered ocean energy systems. It details how a type of system, an Autonomous Offshore Power System (AOPS), can provide a potential solution and outlines the work and findings to data of joint industry project that integrates and co-demonstrates an AOPS with an electrified subsea asset. In this Project (Project), an AOPS will provide power and data communications to an electrified subsea asset at the PacWave South test site off the U.S. Oregon coast. Here, this paper provides a description and analysis of the system configuration, subsea asset integration process, and pre-deployment testing plans, along with projected benefits for the industry.

16 TIDAL AND WAVE POWER

Development and Testing of a Friction-Based Post-Installable Sensor for Subsea Fiber-Optic Monitoring Systems

This paper presents the design and development of a friction-based coupling device for a fiber-optic monitoring system that can be deployed on existing subsea structures. This paper provides a summary of the design concept, prototype development, prototype performance testing, and design refinements of the device. The results of the laboratory testing of the first prototype performed at the National Aeronautics and Space Administration (NASA) Johnson Space Center (JSC) are included in this paper. Limitations of the initial design were identified and future design improvements were proposed. These new features will enhance the coupling of the device and improve the monitoring system measurement capabilities. A major challenge of a post-installed instrumentation monitoring system is to ensure adequate coupling between the instruments and the structure of interest for reliable measurements. Friction-based coupling devices have the potential to overcome coupling limitations caused by marine growth and soil contamination on subsea structures, flowlines or risers. The work described in this paper investigates the design of a friction-based coupling device (friction clamp), which is applicable for pipelines and structures that are suspended in the water column and those that are resting on the seabed. The monitoring elements consist of fiber-optic sensors that are bonded to a metal clamshell with a high-friction coating. The friction clamp has a single hinge design to facilitate the operation of the clamp and dual rows of opposing fasteners to distribute the clamping force on the structure. The friction clamp can be installed by divers in shallow depths or by remotely operated vehicles in deep-water applications. NASA-JSC was involved in the selection and testing of the friction coating, and in the design and testing of the prototype clamp device. Four-inch diameter and eight-inch diameter sub-scale friction clamp prototypes were built and tested to evaluate the strain measuring capabilities of the design under different loading scenarios. The testing revealed some limitations of the initial design concept, and subsequent refinements were explored to improve the measurement performance of the system. This study was part of a collaboration between NASA-JSC and Astro Technology, Inc. within a study called Clear Gulf. The primary objective of the Clear Gulf study is to develop advanced instrumentation technologies that will improve operational safety and reduce the risk of hydrocarbon spillage. NASA provided unique insights, expansive test facilities, and technical expertise to advance these technologies that would benefit the environment, the public, and commercial industries.

Bentley, Nicole

Development and Testing of a Friction-Based Post-Installable Sensor for Subsea Fiber-Optic Monitoring System

This paper presents the design and development of a friction-based coupling device for a fiber-optic monitoring system that can be deployed on existing subsea structures. This paper provides a summary of the design concept, prototype development, prototype performance testing, and design refinements of the device. The results of the laboratory testing of the first prototype performed at the National Aeronautics and Space Administration (NASA) Johnson Space Center (JSC) are included in this paper. Limitations of the initial design were identified and future design improvements were proposed. These new features will enhance the coupling of the device and improve the monitoring system measurement capabilities. A major challenge of a post-installed instrumentation monitoring system is to ensure adequate coupling between the instruments and the structure of interest for reliable measurements. Friction-based coupling devices have the potential to overcome coupling limitations caused by marine growth and soil contamination on subsea structures, flowlines or risers. The work described in this paper investigates the design of a friction-based coupling device (friction clamp), which is applicable for pipelines and structures that are suspended in the water column and those that are resting on the seabed. The monitoring elements consist of fiber-optic sensors that are bonded to a metal clamshell with a high-friction coating. The friction clamp has a single hinge design to facilitate the operation of the clamp and dual rows of opposing fasteners to distribute the clamping force on the structure. The friction clamp can be installed by divers in shallow depths or by remotely operated vehicles in deep-water applications. NASA-JSC was involved in the selection and testing of the friction coating, and in the design and testing of the prototype clamp device. Four-inch diameter and eight-inch diameter sub-scale friction clamp prototypes were built and tested to evaluate the strain measuring capabilities of the design under different loading scenarios. The testing revealed some limitations of the initial design concept, and subsequent refinements were explored to improve the measurement performance of the system. This study was part of a collaboration between NASA-JSC and Astro Technology, Inc. within a study called Clear Gulf. The primary objective of the Clear Gulf study is to develop advanced instrumentation technologies that will improve operational safety and reduce the risk of hydrocarbon spillage. NASA provided unique insights, expansive test facilities, and technical expertise to advance these technologies that would benefit the environment, the public, and commercial industries.

Bentley, Nicole L.

Space Station Human Factors Research Review. Volume 1: EVA Research and Development

An overview is presented of extravehicular activity (EVA) research and development activities at Ames. The majority of the program was devoted to presentations by the three contractors working in parallel on the EVA System Phase A Study, focusing on Implications for Man-Systems Design. Overhead visuals are included for a mission results summary, space station EVA requirements and interface accommodations summary, human productivity study cross-task coordination, and advanced EVAS Phase A study implications for man-systems design. Articles are also included on subsea approach to work systems development and advanced EVA system design requirements.

Cohen, Marc M.

Defining Infrastructure Feasibility for Hub-Scale Offshore Atlantic Carbon Storage in the Northeastern United States

In the Northeast U.S., deep rock formations along the Atlantic outer continental shelf may have the potential to sequester 150–1136 million metric tons of CO2. However, the design and infrastructure necessary to develop offshore carbon storage in this region is not well defined because there has been little oil and gas exploration and no commercial production. Consequently, an infrastructure feasibility design was completed for a hub-scale offshore CO2 storage system along the Northeast U.S. Atlantic. The design included development of a detailed, site-specific geological model for a location near the Great Stone Dome geological structure in the Baltimore Canyon Trough off the coast of Delaware, Maryland, and New Jersey. A field injection system topology design was completed to portray a design with eight wells in two clusters connected by central manifolds. Reservoir simulations were completed for the injection system that showed the hub may be able to inject 17 million metric tons (MMT) of CO2 per year for thirty years, but injection rates varied substantially across the eight wells. A CO2 pipeline design determined feasible routes from the east coast shoreline to the injection field. Finally, the CO2 injection system design included subsea injection trees, manifolds, and power umbilicals. This is the first study to define large-scale carbon storage design and infrastructure options for the offshore Atlantic, which can help to progress this region towards field characterization and early-mover deployment for future decarbonization in the region.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Graphical programming: A systems approach for telerobotic servicing of space assets

Satellite servicing is in many ways analogous to subsea robotic servicing in the late 1970's. A cost effective, reliable, telerobotic capability had to be demonstrated before the oil companies invested money in deep water robot serviceable production facilities. In the same sense, aeronautic engineers will not design satellites for telerobotic servicing until such a quantifiable capability has been demonstrated. New space servicing systems will be markedly different than existing space robot systems. Past space manipulator systems, including the Space Shuttle's robot arm, have used master/slave technologies with poor fidelity, slow operating speeds and most importantly, in-orbit human operators. In contrast, new systems will be capable of precision operations, conducted at higher rates of speed, and be commanded via ground-control communication links. Challenge presented by this environment include achieving a mandated level of robustness and dependability, radiation hardening, minimum weight and power consumption, and a system which accommodates the inherent communication delay between the ground station and the satellite. There is also a need for a user interface which is easy to use, ensures collision free motions, and is capable of adjusting to an unknown workcell (for repair operations the condition of the satellite may not be known in advance). This paper describes the novel technologies required to deliver such a capability.

Pinkerton, James T.

Hydrogen-Battery Hybrid Energy System on Repurposed Offshore Platforms for Efficient Clean-Energy Transition

Due to the rising global energy demand and enhanced awareness of the environmental impact of fossil fuels, the Gulf of Mexico, traditionally known for oil extraction, offers a distinct chance to repurpose the existing offshore infrastructure. With the depletion of oil reserves, it is feasible to adapt previously utilized floating platforms for extraction to generate renewable energy, specifically through wind-generated power and hydrogen production. This adaptation seeks to promote a transport system that is more ecologically friendly in the future. Offshore wind turbines serve as the main energy source, with help from battery storage and hydrogen production to enhance the overall system performance, hydrogen creation, fuel, and electricity delivery for sustainable energy production. The system is divided into two distinct cases, each evaluated for cost, performance, and feasibility, with a focus on minimizing both the Levelized Cost of Energy (LCOE) and the Levelized Cost of Hydrogen (LCOH). The first case examines the integration of offshore wind turbines with hydrogen production. Excess electricity generated by wind turbines is directed toward hydrogen production via electrolysis. The hydrogen produced can be used as fuel for vehicles or transported to the shore via pipelines. The second case investigates a technology that combines wind turbines with battery storage. The batteries possess an ability to supply electricity for a continuous duration of 4 hours maximum each day. The main objective is to reduce the LCOE by considering the battery's charging and discharging cycles, together with the uncertain attributes of wind power and battery deterioration. The produced energy can be distributed for onshore applications or utilized for the purpose of offsetting offshore loads such as subsea oil and gas production, transportation, etc. The offshore hydrogen-battery hybrid system is improved via three advanced algorithms, Particle Swarm Optimization (PSO), and Grey Wolf Optimizer (GWO). In Case 1, PSO improves hydrogen production by efficiently managing the electrolyzer’s power consumption, decreasing production costs significantly. Particle Swarm Optimization (PSO) is applied to improve the efficiency of the electrolyzer, reducing production costs and achieving an optimized CAPEX of $240.00 million (from an initial $300.00 million) and OPEX of $9.60 million per year. This system produces 4,720,000 kg of hydrogen annually, with a Levelized Cost of Hydrogen (LCOH) of $6.40/kg and an annual profit of $9.27 million. In Case 2, GWO effectively reduces the overall energy cost by improving the charge-discharge management of batteries, which extends battery life and optimizes their use. The second case focuses on integrating battery storage, optimized using the Grey Wolf Optimizer (GWO), which enhances battery charge-discharge cycles, extending battery life and lowering costs. This system achieves an optimized CAPEX of $204.80 million (from an initial $256.00 million) and OPEX of $9.29 million per year, producing 310883.39 MWh of electricity annually at a Levelized Cost of Energy (LCOE) of $86.13/MWh, with an annual profit of $6.25 million. The implementation of a comprehensive strategy results in a substantial reduction in costs, improved energy efficiency, and a dependable supply of both electric power and hydrogen, emphasizing the benefits of converting offshore oil platforms for clean energy transition. This study explores a clean strategy to enable cost-effective repurposing of offshore O&G platforms. Both cases highlight the economic and technical feasibility of transitioning offshore oil platforms to clean energy systems, demonstrating substantial cost reductions and reliable energy and hydrogen supplies for sustainable energy production.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Hypoxic ventilatory sensitivity in men is not reduced by prolonged hyperoxia (Predictive Studies V and VI)

Potential adverse effects on the O2-sensing function of the carotid body when its cells are exposed to toxic O2 pressures were assessed during investigations of human organ tolerance to prolonged continuous and intermittent hyperoxia (Predictive Studies V and VI). Isocapnic hypoxic ventilatory responses (HVR) were determined at 1.0 ATA before and after severe hyperoxic exposures: 1) continuous O2 breathing at 1.5, 2.0, and 2.5 ATA for 17.7, 9.0, and 5.7 h and 2) intermittent O2 breathing at 2.0 ATA (30 min O2-30 min normoxia) for 14.3 O2 h within 30-h total time. Postexposure curvature of HVR hyperbolas was not reduced compared with preexposure controls. The hyperbolas were temporarily elevated to higher ventilations than controls due to increments in respiratory frequency that were proportional to O2 exposure time, not O2 pressure. In humans, prolonged hyperoxia does not attenuate the hypoxia-sensing function of the peripheral chemoreceptors, even after exposures that approach limits of human pulmonary and central nervous system O2 tolerance. Current applications of hyperoxia in hyperbaric O2 therapy and in subsea- and aerospace-related operations are guided by and are well within these exposure limits.

Clinical Trial

New Support for Hypotheses of an Ancient Ocean on Mars

A new analog for the giant polygons in the Chryse-Acidalia area suggests that those features may have formed in a major body of water - likely a Late Hesperian to Early Amazonian ocean. This analog -terrestrial polygons in subsea, passive margin basins derives from 3D seismic data that show similar-scale, polygonal fault systems in the subsurface of more than 50 terrestrial offshore basins. The terrestrial and martian polygons share similar sizes, basin-wide distributions, tectonic settings, and association with expected fine-grained sediments. Late Hesperian deposition from outflow floods may have triggered formation of these polygons, by providing thick, rapidly-deposited, fine-grained sediments necessary for polygonal fracturing. The restriction of densely occurring polygons to elevations below approx. -4000 m to -4100 m supports inferences that a body of water controlled their formation. Those same elevations appear to restrict occurrence of polygons in Utopia Planitia, suggesting that this analog may apply also to Utopia and that similar processes may have occurred across the martian lowlands.

Oehler, Dorothy Z.

Probabilistic Risk Analysis (PRA) of a Mobile Offshore Drilling Unit (MODU) Dynamic Positioning System (DPS)

Probabilistic Risk Assessment (PRA) has been utilized by NASA in a variety of space oriented projects. It has served as one of the primary risk identification and ranking tools. Recent developments in the oil and gas industry have presented opportunities for NASA to lend their PRA expertise to both ongoing and developmental projects within the industry. As a result, NASA has entered into an agreement with Anadarko Petroleum Company (APC) to collaboratively develop PRAs for different aspects of the subsea drilling and completion process of well development. This paper documents how PRA was applied to estimate the probability that a Mobile Offshore Drilling Unit (MODU) equipped with a generically configured Dynamic Positioning System (DPS) loses location and needs to initiate an emergency disconnect. Since this project was in essence a pilot project, the PRA described in this paper is intended to be generic such that the vessel meets the general requirements of an International Maritime Organization (IMO) Maritime Safety Committee (MSC)/Circ. 645 Class 3 dynamically positioned vessel. The results of this analysis are not intended to be applied to any specific drilling vessel, although provisions were made to allow the analysis to be configured to a specific vessel if required.

Thigpen, Eric B.

ATI SAA Annex 3 Button Tensile Test Report I

This report documents the results of a study carried out under Splace Act Agreement SAA-EA-10-004 between the National Aeronautics and Space Administration (NASA) and Astro Technology Incorpporated (ATI). NASA and ATI have entered into this agreement to collaborate on the development of technologies that can benefit both the US government space programs and the oil and gas industry. The report documents the results of a test done on an adnesive system for attaching new monitoring sensor devices to pipelines under Annex III of SAA-EA-10-004: "Proof-of-Concept Design and Testing of a Post Installed Sensing Device on Subsea Risers and Pipelines". The tasks of Annex III are to design and test a proof-of-concept sensing device for in-situ installation on pipelines, risers, or other structures deployed in deep water. The function of the sensor device is to measure various signals such as strain, stress and temperature. This study complements the work done, in Annex I of the SAA, on attaching a fiber optic sensing device to pipe via adhesive bonding. Both Annex I and Annex III studies were conducted in the Crew and Thermal System Division (CTSD) at the Johnson Space Center (JSC) in collaboration with ATI.

Tang, Henry H.

TEAMER – Harvesting Subsea Water Motion to Provide Clean Electrical Power (Abstract)

Power generation from vortex induced vibration (VIV) is an emerging field with new technologies that are just beginning to be field tested. In this TEAMER project, WITT Energy will be field testing the power production of its pendulum system in two different configurations to evaluate its performance. The amount of power produced by a VIV instrument depend on the frequency at which it vibrates. The vibrational frequency is controlled by the device shape and its interaction with the flow velocity. Computer models are used to predict vibration frequencies as a function of flow velocity but they may be inaccurate due to complicated bathymetry and bottom roughness that is not captures by the models. This project will test the WITT VIV device in the Sequim Bay channel over a range of tidal velocities. Two tests will be completed with different pipe lengths that are expected to vary the vibrational frequency and therefore the power produced. PNNL will use an acoustic doppler current profiler (ADCP) to monitor the flow conditions during the tests. These tests will help WITT Energy evaluate how closely field operations follow computer model predictions and how best to configure their device for electricity production.

16 TIDAL AND WAVE POWER

Development and Testing of a Post-Installable Deepwater Monitoring System Using Fiber-Optic Sensors

This paper addresses the design and development of a fiber-optic monitoring system that can be deployed on existing deepwater risers and flowlines; and provides a summary of test article fabrication and the subsequent laboratory testing performed at the National Aeronautics and Space Administration-Johnson Space Center (NASA-JSC). A major challenge of a post-installed instrumentation system is to ensure adequate coupling between the instruments and the riser or flowline of interest. This work investigates the sensor coupling for pipelines that are suspended in a water column (from topside platform to seabed) using a fiber-optic sensor clamp and subsea bonding adhesive. The study involved the design, fabrication, and test of several prototype clamps that contained fiber-optic sensors. A mold was produced by NASA using 3-D printing methods that allowed the casting of polyurethane clamp test articles to accommodate 4-inch and 8-inch diameter pipes. The prototype clamps were installed with a subsea adhesive in a "wet" environment and then tested in the NASA Structures Test Laboratory (STL). The tension, compression, and bending test data showed that the prototype sensor clamps achieved good structural coupling, and could provide high quality strain measurement for active monitoring.

Seaman, Calvin H.

Power systems for ocean regional cabled observatories

Development of power systems is the most challenging technical issue in the design of ocean regional cabled observatories. ARENA and NEPTUNE are two ocean regional cabled observatory networks with aims that are at least broadly similar. Yet the two designs are quite different in detail. This paper outlines the both systems and explores the reasons for the divergence of design, and shows that it arose because of differences in the priority of requirements.

cabled subsea observatory

Using Science Operations Tools and Methods from NASA for Remote Presence Ocean Exploration on Earth: E/V Nautilus Cruise NA108

NASA Ames' Exploration Ground Data Systems (xGDS) supports rapid scientific decision making by synchronizing information in time and space, including video and still images, scientific instrument data, and science and operations notes in geographic and temporal context. We have deployed xGDS at multiple NASA field analog missions over the past decade.In the last two years, we have participated in SUBSEA, a multi-institution collaborative project. SUBSEA used the research ship E/V Nautilus along with its two remotely operated vehicles (ROVs), Hercules and Argus, to explore deep ocean volcanic vents as an analog for ocean worlds (e.g. Enceladus). This work allowed us to compare the existing oceanographic operations methods and technologies used for ocean exploration with corresponding tools and approaches developed and used at NASA. In the first year of SUBSEA we observed existing remote science operations from the Inner Space Center (ISC). In the second year, we deployed xGDS at ISC to complement existing capabilities with xGDS tools designed to support remote Nautilus science operations from the ISC. During operations, video, ROV position and instrument telemetry were streamed from the ship to the ISC. As the science team watched dive operations, they could annotate the data with observations that were relevant to their work domain. Later, the team members could review the data at their own pace to collaboratively develop a dive plan for the next day, which had to be delivered on a fixed daily schedule.The opportunity to compare operations under different conditions enabled us to make several key observations about conducting remote science and planning operations efficiently: (i) Reviewing data collaboratively and interactively with temporal and spatial context was critical for the remote science team's ability to plan dive operations on the Nautilus. (ii) Science team members were actively engaged with the remote dive operations because they could interact with the collected data and visualize it as they desired. (iii) Being able to replay past events at accelerated speeds, and jump to points in time and spaced based on search results, provided efficient access to critical points of interest in a massive volume of data, so the remote science team could deliver plans on time. SUBSEA (Systematic Underwater Biogeochemical Science and Exploration Analog) is a multi-institution collaboration supported by NASA, NOAA's Office of Exploration Research (OER), the Ocean Exploration Trust (OET) and the University of Rhode Island's Graduate School of Oceanography (GSO). ISC is GSO's telepresence operations facility.

Lees, David S.