Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “steam turbine”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Welding of Haynes 282 to Steels to Enable Modular Rotors for Advanced Ultra Super-Critical Steam Turbines

Steam turbines for an Advanced Ultra Super Critical (AUSC) fossil fired power plant will operate at temperatures well above those of current commercial steam cycles with inlet temperatures more than 760 C , which is beyond the capabilities of alloy steels presently used for steam turbine applications and requires advanced materials. Large components such as steam turbine rotors may be made of nickel based super alloys such as Haynes 282 (H282). However, monolithic forgings of superalloys in the sizes required for large steam turbines rotors can be prohibitively expensive besides many technical challenges. To minimize cost and alleviate the related technical challenges, superalloy use needs to be limited to locations on the steam turbine rotor where strength and temperature requirements cannot be met by conventional steels. This is possible if nickel-based superalloys can be successfully welded to steels and the related technical challenges - machining parts made of dissimilar welded materials, non-destructive examination of such welds for flaw detection; and, material properties of such hybrid components – are sufficiently addressed. In this technology development project, we successfully welded H282 to plates up to ~ 75 mm (~ 3 inches) to a 3.5NiCrMoV steel of similar thickness. Advanced ultrasonic inspection technique called Phased Array Ultrasonic Testing (PAUT) was employed to examine the dissimilar H282-Steel welds, into which flat bottomed side drilled holes (SDH) of various diameters were introduced, to determine the minimum detectable feature sizes; it was shown that with PAUT SDH of dia. down to 0.5 mm could be detected in the base alloys and SDH with dia. down to 2.4 mm could be detected in the weld metal under multiple orientations successfully. An autonomous machining process monitoring system was developed and demonstrated whereby the forces acting on the cutting tool could be actively monitored as the cutting tool transitioned from H282 to Steel across the weld using which the machining parameters can be potentially altered without interruption to extend tool life. This project successfully achieved its objectives of - i. Developing a welding methodology and viable welding geometries, to successfully join H282 to steel 3.5CrMoNiV steel to enable manufacture of modular steam turbine rotors for AUSC applications (conditions of at least 760 °Celsius and 3,100 psia (pounds per square inch absolute pressure) and evaluate the material properties of the welded specimen. ii. Employ the advanced ultrasonic inspection technique to the dissimilar weld metal joint and determine the minimum detectable feature sizes. iii. Develop effective machining techniques to machine such hybrid structures with online tool force monitoring and effect machine state metrics for optimal results.

20 FOSSIL-FUELED POWER PLANTS↗

Ensemble Manufacturing Techniques for Steam Turbine Components Across Length Scales

Faster design to manufacturing requirements were sought for steam turbine components to meet the changing demands of today’s power grid of improved efficiency through operating temperature increases and enhanced operational flexibility from baseload to cyclic operations. Advances in multiple advanced manufacturing (AM) process enabled redesign of turbine components for extreme environments with the potential to reduce cost. AM is of particular interest to improve component functionality, higher temperature capability, and superior durability in large scale steam turbine applications. AM methods have an immense potential to open-up the design space by working directly with the 3D model to produce near-net shapes, enable fast design-manufacturing iterations, thereby significantly reducing product cost and lead-time up to 25 % from current baseline. However, these benefits cannot be fully realized due to the potential for unknown AM processing defects and their resultant effect upon component performance in service. Siemens is partnering with Oak Ridge National Laboratory (ORNL), Electric Power Research Institute (EPRI), and Connecticut Center for Advanced Technology (CCAT) to advance the knowledge of complex process-material interactions for desired microstructures and properties that are closely interlinked to component geometries across different length scales. The proposed program utilized an ensemble of multidisciplinary technologies to accelerate the development of materials, high-throughput experiments for their qualification, and design flexibility/topology optimization for repair/redesign of components to address critical failure mechanisms for improved performance and increased reliability of existing power plant components. The proposed activities, if successfully demonstrated for identified components, will enable paradigm shift in customized manufacturing and accelerated qualification/certification towards increased steam turbine component durability, increased turbine efficiency, and reduced CO 2 emissions in load-following environments compared to today’s technology. Technology maturation is built into the project as successful research will include customized process-component down-selection enabling AM methodologies to be incorporated directly into the existing supply chain. The specific activities of the proposed effort are: 1. Topology optimization of down-selected steam turbine parts that are amenable to additive and hybrid manufacturing for cost/performance improvement. 2. Process-structure-property relationships for five AM processes for steam turbine materials of interest to compare with conventional materials. 3. Perform part/assembly build process using advanced additive/hybrid machine tools followed by quality inspection of the built components for insight into qualification for production scale-up. Steam turbine rig testing of printed components under targeted, well monitored and characterized environmental conditions of for performance comparison of baseline and redesigned components.

36 MATERIALS SCIENCE↗

Improve Performance and Cost for Steam Turbine Maintenance, Repair, and Overhaul Using Additive Manufacturing

The overall objective was to develop additive-manufacturing-enabled repair solutions for last stage bucket (LSB) and additive-manufacturing-enabled packing rings (PRs) for coal-fired steam turbines with the goal of reducing routine maintenance, repair, and overhaul (MRO) cost and improving the operating efficiency of steam turbines. GE Steam Power (GESP) and GE Gas Power (GEGP) provided technical and commercial consulting to GER with insights on steam turbine MRO design requirements, MRO duration and costs, and an overall commercialization strategy for the additive manufacturing technologies developed in the proposed effort.

20 FOSSIL-FUELED POWER PLANTS↗

Two-phase operation of a Terry steam turbine using air and water mixtures as working fluids

Terry steam turbines are employed in the safety systems of many nuclear Boiling Water Reactors to drive pumps and provide cooling water to the nuclear reactor core. While the turbine efficiency is low, the more important feature is high reliability under off-normal conditions. An important aspect of reliability is the ability to function with two-phase steam-water injection into the turbine, as most likely occurred in the Fukushima Dai-ichi nuclear accidents. This study investigates the characteristics of a Terry turbine during air-water injection with gas mass fractions ranging from 1 (dry gas) to 0.05 (wet gas), to better understand the Terry turbine’s true operational capabilities and provide justification for extended Terry turbine use for reactor safety. Other parameters investigated are the inlet pressure, the exhaust backpressure and the turbine’s rotational speed. The turbine performance is presented in terms of dynamometer loading and pump performance change as functions of the gas mass fraction.

42 ENGINEERING↗

Embedded sensors integrated into critical components for in situ health monitoring of steam turbines

Operational flexibility is desired in today’s coal-fired power plants to balance power grids by compensating for the variable electricity supply from renewable energy sources and distributed gensets. This demanding requirement accelerates materials degradation and makes in-situ health monitoring essential. Life monitoring of components and subsystems is thus seen as essential in assessing material and mechanical behavior to estimate system reliability, move to a conditionbased maintenance strategy and determine time to failure of the units in their actual operating conditions. Vibration monitoring can be exploited for blade tip timing to measure blade vibration amplitude and tip clearance to detect any deterioration taking place in the condition of steam turbine blades. A failure of a rotating blade can lead to severe turbine damage followed by extensive repairs and loss of power production. A blade vibration monitoring system can help early detection of abnormal blade vibration behavior. In conjunction with a health monitoring system, the vibration characteristics can be analyzed to support a pro-active maintenance and inspection schedule. While the feasibility of this inspection technique has been amply demonstrated, there is a need to install induction probes to magnetize the blade for signal output. Siemens, in partnership with Raytheon Technologies Research Corporation (RTRC), proposes a holistic approach to develop embedded sensors to utilize radio frequency for not only coupling to sensors, but as the sensing modality. The goal of this project is to “embed” the novel sensing approach by using either additively manufactured or extruded waveguides on rotating blades for recording, evaluation and monitoring of blade vibrations in Low Pressure turbines, with applications extending to aero engines

01 COAL, LIGNITE, AND PEAT↗

Materials for Advanced Ultra-Supercritical (A-USC) Steam Turbines --- A-USC Component Demonstration

The U.S. Advanced Ultra-Supercritical (A-USC) Consortium was formed in 2001 as a government/industry program, sponsored by the U.S. Department of Energy (DOE) and the Ohio Coal Development Office (OCDO) and cost shared by industrial and not-for-profit partners. The purpose of the consortium was to advance the state of the art for power generation by evaluating and developing materials that allow the use of advanced steam cycles in coal-based power plants. These advanced cycles, with steam temperatures up to 1400°F (760°C), can increase the efficiency of coal-fired boilers from an average of 35% (current U.S. fleet) to more than 45% higher heating value (HHV) (>49% lower heating value [LHV]). The increase in a plant’s efficiency is limited unless new materials able to withstand these higher operating temperatures and pressures are identified and approved for use. The A-USC Consortium identified these needed materials during earlier phases of the program. It developed the welding and joining techniques along with manufacturing processes for casting and wrought products made from these new high-nickel alloys. It subjected these materials to extensive laboratory and steam loop testing. It then obtained ASME code approval for their use in U.S. boiler systems. The program’s successes leave this last remaining activity (ComTest Phase 2) that the U.S. utility industry has recommended to be accomplished prior to commercialization. The focus of the activity is the evaluation and demonstration of commercial readiness for “full scale” components to be made from these nickel-based alloy materials and provided by a U.S. domestic supply chain that is new to working with these alloys. According to studies completed by the Electric Power Research Institute (EPRI), the cost of an A-USC plant is approximately 20% higher than a non-A-USC plant because of its use of nickel-based alloys needed for the high temperature operating conditions. However, CO 2 reductions of approximately 30% from the current fleet average provide a strong incentive for its consideration. The actual costs and perceived value for CO 2 abatement will determine whether new or retrofitted plants are undertaken, although decisions to build A-USC plants in India would indicate its economic feasibility while also being part of a global carbon emissions strategy. The work by the A-USC Consortium, prior to the start of the ComTest project, has included lab scale and pilot scale materials testing, both in air and oxy-combustion. This testing has included air-cooled and steam-cooled “loops” that were installed into existing operating utility boilers to gain exposure of these materials to realistic conditions of high temperature and corrosion caused by the constituents in the coal ash. The A-USC Consortium also gained ASME Code approval of the Inconel 740 material, has cast and extruded the largest high nickel precipitation hardened alloys, and developed unique welding techniques to avoid problems identified by the competing European program. However, as valuable as these material test loops and accomplishments have been for obtaining information, their scale is below that required to minimize the risk associated for a U.S. utility to build a multibillion-dollar A-USC power plant. To reduce the final identified risk barrier to full-scale commercialization of these advanced materials and systems, the A-USC Consortium (guided by a utility industry advisory committee) has identified the key areas of the technology they desire to see as being capable of full-scale manufacturing and/or fabrication from an identified, capable U.S. domestic supplier base. A significant amount of work was accomplished during Phase 1 to identity the components, as well as the component size, that would be manufactured from advanced alloys such as Inconel 740H or Haynes 282 alloys. Pathways to supply these components for ComTest have been identified, as well as any further development that would be required. The Phase 2 effort used Phase 1 findings for designing these key full-scale components for A-USC boilers and turbines to include large castings; extrusions, forgings, fabrication of water walls and steam loops with headers from advanced materials, raw material (such as pipe extrusion billets) are at the commercial readiness level to permit advancement to a demonstration project. The Phase 2 work scope was addressed by a diverse team, including government, industry, and not-for-profit partners. The work scope under Phase 2 addressed fabrication of components identified as being outside of the proven capabilities of the existing supply chain, including the following: Steam turbine rotor forging and Haynes 282 nozzle carrier casting Superheater and reheater header and tube assemblies Large-diameter pipe extrusions and forgings Test valve articles to support ASME Code approval. In addition, key fabrication steps were completed, including boiler weld overlays and simulated field repairs. Throughout, extensive inspection and quality assurance testing of the components were performed. The team worked to advance ASME Code approval for key components and processes. Although much of the focus of ComTest Phase 2 was the high-temperature nickel-based alloy materials, a broader range of materials were incorporated, which would be representative of the materials used in full-scale A-USC power plant applications and have cross-cutting applicability on other high-temperature power generation options, such as advanced nuclear, supercritical CO 2 cycles, and central solar receivers. This report that has been submitted is organized in the following manner: Section 1 contains an Executive Summary. Section 2 discusses the ComTest project background and organization. Section 3 discusses project management and reporting. Section 4 discusses the procurement of nickel-based alloy and other A-USC materials and components. Section 5 discusses the fabrication of procurement of nickel-based alloy and other A-USC materials and components. Section 6 discusses the fabrication of cast nickel-based A-USC steam turbine components. Section 7 discusses the fabrication of forged nickel-based A-USC steam turbine piping and steam pipe components. Section 8 discusses the qualification of pressure relieve valves (PRVs) for A-USC power plants. Section 9 discusses proposed plans for future evaluation of A-USC components. Section 10 contains the summary and conclusion.

01 COAL, LIGNITE, AND PEAT↗

Liquid Salt Combined-Cycle Pilot Plant Design

The work described in this report is responsive to the Office of Fossil Energy program ‘Energy Storage for Fossil Power Generation.’ This Phase I report has been prepared by Pintail Power LLC, with support from Nexant ECA, Electric Power Research Institute (EPRI) and Southern Company Services as a deliverable for the U.S. Department of Energy for NETL Award DE-FE-00320016. The Liquid Salt Combined Cycle™ (LSCC™) technology provides large-scale energy storage integrated with Fossil Electric Generating Units (FEGUs) to meet critical needs in the energy transition by providing: • the lowest cost large-scale storage for time-shifting of renewable energy, • superior fuel efficiency to reduce GHGs from dispatchable resources, • flexible capacity and ramping to balance variability of wind and solar resources, • essential grid stability services to assure reliability of a low-carbon grid. The LSCC approach: • employs equipment that has already been proven in utility service, • uses safe, non-toxic, non-degrading, perpetual-life storage medium, • leverages and repurposes existing FEGU assets, • expands the value stack of energy storage to reduce market, financing, and commodity risks. Pintail Power has developed the LSCC technology to meet the need for reliable, efficient, and cost-effective integration of Variable Renewable Energy (VRE) into a low-carbon electric grid by coupling proven thermal energy storage with proven gas turbines, steam turbines, and heat transfer equipment. This novel approach is intended to address the key issues facing the grid and operators of renewable and fossil generating units including: • Overgeneration and curtailment of renewables, • Need for fast ramping dispatchable resources, • Improved efficiency and flexibility of fossil units, • Additional peaking capacity to support electrification of transportation and heating, • Provision of reliability services to support high penetration of VRE, especially synchronous inertia and fast frequency response. A Technology Readiness assessment by EPRI confirmed that LSCC technology consists of commercially proven hardware used in industrial and utility applications. Although the novel LSCC approach has not yet been demonstrated as a complete system, interfaces between major components have been conservatively specified. A Phase III pilot is planned to demonstrate equipment integration and operation. The patented innovation is removal of the evaporator section from the exhaust heat recovery system, with the evaporation performed by stored energy in a separate steam generator. This arrangement couples renewable and fossil power generation via long-duration energy storage to deliver cost, performance, and operational synergies, including superior charging and discharging flexibility, reduced fuel consumption and lower CO 2 emissions compared to conventional Combined Cycle Power Plants, and low-cost, large-scale energy storage. The LSCC technology is composed of proven equipment integrated with gas turbine exhaust heat in a novel system. During charging, electric heaters raise the salt temperature as it flows from the Cold Salt Tank to the Hot Salt Tank. During discharging, hot salt produces steam from feedwater that is heated with gas turbine exhaust, which also superheats steam to drive a steam turbine. LSCC technology can be added to any combustion-turbine to integrate renewable energy, provide needed grid services, and increase the value of fossil electric generating units based on the technology’s following attributes: • Long-duration storage enables time-shifting of VRE to avoid curtailment and impairment of renewable assets. • Long storage duration combined with fast-charging capability increases arbitrage opportunities by storing more energy when the price is low and discharging more hours when the price is high. • Long storage duration allows resource adequacy to be supplied across multiple days to increase reliability and reduce risk. • The stored energy reduces fuel heat rate and GHG emissions, and increases merit, so the LSCC dispatches earlier and longer to increase the plant’s capacity factor and asset value. • The stored energy enables pre-heating and startup of the steam cycle, without operating the gas turbine, to enable fast startup and ramping when dispatched for discharge. • The steam turbine can operate without the gas turbine so it can provide valuable synchronous inertia during charging without consuming fuel. • Fast frequency response and regulation services can be provided during charging using solid-state heater and pump controls to vary the charge power input in response to grid signals. • The LSCC system can be configured for resilience including black start, islanded/micro-grid operation, and even self-recharging of storage using either gas turbine power or gas turbine exhaust heat. The commercialization plan is to add LSCC technology to existing simple cycle gas turbine power plants with the 50MW GE LM6000 aero-derivative gas turbine as the reference design basis. A Techno-economic assessment of the reference design evaluated the benefits (Levelized Avoided Cost of Energy) and costs (Levelized Cost of Energy). The plant definition included all major systems and budgetary vendor quotes. Pintail Power and NexantECA developed the overall cost estimate for the LSCC plant up to the total plant cost level, following the DOE-NETL cost estimate guidelines at AACE Class 3 (-20%/+30%). This includes the equipment cost, bulk material, direct and indirect labor costs to arrive at the bare erected cost. Engineering costs are factored from the BEC and added to it to arrive at the EPC cost. Process and project contingencies were then factored from the EPC cost and rolled-up to yield the total plant cost of $\$$184 million for 1746 MWh of discharge electricity. • At $\$$105/kWh, the reference plant costs less than any of the Energy Storage Systems evaluated by PNNL in 2020 for the Energy Storage Grand Challenge. Operations and Maintenance cost estimates were scaled from combined cycle practice, assuming that the LSCC unit was co-located with and sharing some labor expense with other units, to arrive at $\$$2.2 million per year. Plant economics were evaluated using prices from the ERCOT Day-Ahead Market for calendar year 2019 (excluding the market disruptions from the COVID pandemic and the February 2020 deep freeze event). Assuming economic dispatch in the ERCOT Day-Ahead market, the reference plant capacity factor would have discharged for 2777 hours at 91.9 MW, a 31.66% capacity factor, with a marginal cost of $\$$25.59/MWh, and a LACE of $\$$82.41/MWh. Fixed charges were calculated according to EIA guidelines to arrive at an LCOE of $\$$83.48. The benefit-to-cost ratio of 0.99 suggests that the reference plant would have been cost-effective and competitive in the market. EPRI interviewed selected utilities to gauge the need for, applicability of and interest in the LSCC system. Several utilities are currently managing increased load growth along with the inclusion of increasing levels of renewable generation, putting pressure on conventional generation by requiring increased turndown requirements and ultimately lower capacity factors. All of the utilities interviewed have CO 2 reduction targets in the 2030-2050 timeframe that will severely limit the participation of fossil generation and require better utilization of carbon free generation. While there is limited opportunity for storage in the current markets, the utilities interviewed stated that there will be a substantial need for long duration energy storage in the future given the expected trends. Utilizing an energy storage system will generally be preferred over new gas capacity in some cases, with the capabilities of the LSCC system being a potential option for retrofit to existing simple cycle gas turbine units, allowing them to deliver greater participation in the market with lower carbon intensity. A technology gap assessment and technology maturation plan identified a pilot-scale demonstration as the final step before commercialization. Key gaps to be addressed during the Phase II FEED (Front-End Engineering Design) are component selection and design, commissioning procedures, and operational procedures and the control system for LSCC charging and discharging. The project team has been expanded to include Wood Group PLC as EPC. The proposed Phase II work leads to a pilot-scale engineering demonstration (TRL 6) to be conducted at Southern Company’s Plant Rowan, where the prototype system will perform “all the functions that will be required of the operational system.” The proposed pilot will facilitate commercialization (TRL-9) by scale-up to utility-scale systems integrated with peaking GTs or directly to facility scale systems using industrial GTs. The conceptual design for the pilot plant focuses on the novel integration aspects of LSCC technology. A slipstream of gas turbine exhaust will feed a waste heat recovery unit coupled to a molten salt steam generator heated by stored energy. The pilot is intended to demonstrate all key operating modes of the LSCC technology during charging, discharging and standby. The pilot equipment will be approximately one-seventh scale of the LM6000 commercial target and is expected to have commercial off-ramp potential for facility-scale applications.

01 COAL, LIGNITE, AND PEAT↗

NiCrMoNb age hardenable alloy for creep-resistant high temperature applications, and methods of making

Nickel alloys, methods of making nickel alloys, articles including the nickel alloys, uses of the alloys, and methods of treating nickel alloys are described. The inventive heat resistant structural materials are suitable for applications requiring high yield stress at room temperature and good creep strength at high temperatures, such as in gas turbines, steam turbines, fossil energy boilers, aero engines, power generation systems using fluids such as supercritical carbon dioxide (e.g., advanced ultra-supercritical power plants), concentrated solar power plants, nuclear power plants, molten salt reactors: turbine blades, casings, valves, heat exchangers and recuperators.

Detrois, Martin↗

NiCrMoNb age hardenable alloy for creep-resistant high temperature applications, and methods of making

Nickel alloys, methods of making nickel alloys, articles including the nickel alloys, uses of the alloys, and methods of treating nickel alloys are described. The inventive heat resistant structural materials are suitable for applications requiring high yield stress at room temperature and good creep strength at high temperatures, such as in gas turbines, steam turbines, fossil energy boilers, aero engines, power generation systems using fluids such as supercritical carbon dioxide (e.g., advanced ultra-supercritical power plants), concentrated solar power plants, nuclear power plants, molten salt reactors: turbine blades, casings, valves, heat exchangers and recuperators.

Detrois, Martin↗

Performance evaluation of a Terry GS-2 steam impulse turbine with air-water mixtures

Terry steam turbines are widely used in various industries because of their robust design. Within the nuclear power generation industry, they are used in the Reactor Core Isolation Cooling System to remove decay heat during reactor isolation events. During the Fukushima Daiichi nuclear power station disaster in Japan in 2011, the Reactor Core Isolation Cooling System and associated Terry turbine operated for over 70 hours in Unit 2; this runtime is well beyond the expected operating duration. Theories suggest the turbine was subjected to a two-phase inlet flow, which could degrade the turbine performance. In this work, an experimental test rig was constructed to test a full-scale Terry model GS-2 steam turbine under two-phase air/water flows. Steady-state efficiency and torque performance maps of the turbine were developed over a range of turbine inlet pressures (1.38–4.83 bar or 20–70 psia), air mass fractions (0.05–1.0) and rotational speeds up to 4000 RPM. Furthermore, turbine performance followed expected trends with torque varying linearly and efficiency varying quadratically with rotational speed. In addition, high-speed images of the two-phase flow entering the turbine were also analyzed to understand how changes in inlet pressure and air mass fraction affect the flow regime and homogenization. The present tests with air–water two-phase mixtures are an important step towards providing an understanding of the full-scale Terry turbine’s behavior and performance curves under two-phase conditions. The results of this work will be combined with air/water and steam/water data gathered using a small-scale Terry ZS-1 steam turbine in order to understand the scaling relationship between large and small size Terry turbines and fluid pairs. The combined data set will enable further development of analytical models over a wide range of conditions and may be used to provide technical justification for expanded use of the Terry turbines in nuclear power plant safety systems and other systems.

42 ENGINEERING↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Cyber-Attack Detection and Accommodation for the Energy Delivery System

The goals of this project were to create a software system with a suite of key algorithms for cyber-attack detection and accommodation providing domain layer protection for critical power generation assets. Example assets included gas and steam turbines, heat recovery steam generators, and electrical generators. The aggressive algorithm goals were aimed at reducing the false positive rates in threat detection to <1% using learnings from many evolving disciplines (power turbine and generator physics, power system modeling, modern control theory, system identification, machine learning, deep learning, mathematics and data science). Additional goals for the algorithms involved localizing threats on-the-fly to know in which monitoring node the effects of attacks are present, and then providing accommodation to keep the system running uninterrupted much of the time in the presence of the attack. Accommodation had a performance goal of providing resiliency when up to 50% of monitoring nodes are in an attack state.

cybersecurity, cyber-physical↗

Component level modeling of materials degradation for insights into operational flexibility of Existing Coal Power Plants

Increasingly, coal-fired power plants are required to balance power grids by compensating for the variable electricity supply from renewable energy sources. Fossil-fueled power plants, originally designed to be base loaded, will increasingly need to operate on a load following or cyclic basis. This demanding requirement for operational flexibility needs insights into accelerated material degradation arising due to the harsh operating conditions (e.g., fatigue, early oxide exfoliation due to stresses) along with current damage mechanisms (fireside corrosion, creep and erosion) observed in service. Our research objective is to develop component level modeling toolkit for materials-based degradation for two key mechanisms that can accelerate with cyclic operations. In more detail, this includes the fireside corrosion/steam oxidation/erosion/creep/fatigue of superheaters/reheaters and steam pipework and also the water droplet erosion/ fatigue of last stage steam turbine blades degradation mechanisms, that demand routine and sometimes unplanned maintenance and repair. The innovation is in developing a computational fluid dynamics/finite element (CFD/FE) modeling toolkit for the component level models of the boilers and low-pressure steam turbines in coal power plants that can tackle multidisciplinary failure mechanisms occurring concurrently for extreme environment materials. Lifetime assessment in such environments also needs to account for the unit-specific analyses, operational history and fuel feedstock; this can only be obtained by destructive analysis of components. This, in turn, enables validation of the model toolkits utilizing service feedback data, improving the probability of time/temperature dependent life prediction.

20 FOSSIL-FUELED POWER PLANTS↗

Flexible Operation of Natural Gas Power Plants in Texas: Startup and Shutdown Durations and Nitrogen Dioxide Emissions

This dataset provides insights into historical flexible operation of natural gas power plants in Texas, with a focus on startup and shutdown events. The dataset includes tables summarizing startup and shutdown durations as well as nitrogen oxide (NOx) emission factors during these events, and compares these emission factors with those observed during all other operating phases (referred to here as “steady-state operation”). The dataset is derived using the U.S. Environmental Protection Agency (EPA)’s Clean Air Markets Program Data (CAMPD). Historical hourly data from 2015–2024, including electricity generation, heat input, and NOx emission factors, are used for natural gas combined cycle units, combustion turbine units, and steam turbine units in Texas. This work was authored by the National Laboratory of the Rockies, operated by the Alliance for Energy Innovation, LLC, for the U.S Department of Energy (DOE) under contract no. DE-AC36-08GO28308. Funding was provided by the U.S. Department of Energy as part of its Grid Modernization Laboratory Consortium, a strategic partnership between DOE and the national laboratories to bring together leading experts, technologies, and resources to collaborate on the goal of modernizing the nation’s grid. The views expressed in the dataset do not necessarily represent the views of the DOE or the U.S. Government.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Chapter 2: Global Value Chain and Manufacturing Analysis on Geothermal Power Plant Turbines

The global geothermal power market has shown significant growth since the last decade and is expected to reach a total installed capacity of 18.4 gigawatts electric (GWe) by the end of 2021 (GEA, 2016). The global geothermal power plant turbine market is dominated by a small number of manufacturers. Between 2005 and 2015, 82% of the geothermal steam turbines were manufactured in Japan, and 74% of the geothermal binary cycle turboexpanders were manufactured in Israel. During this period, the United States played an important role in the global trade flow of fully assembled turbine units and turbine parts, with a high volume of imports and exports. Another significant growth area was in Italian turbine/turboexpander manufacturers, who have increased their market share in the last couple of years. One other important change in the manufacturing market was in Turkey, where the bonus on feed-in-tariff (FIT) for domestic hardware components boosted the national manufacturing sector between 2010 and 2020. When planning geothermal power projects, developers customize their power plant size to fit the available geothermal resource capacity. The turbine is designed and sized to optimize the efficiency and utilization of resource and revenue production. The rest of the power plant components such as heat exchangers (HX), water-cooled cooling towers (WCCT), or air-cooled condensers (ACC) are then chosen to complement the turbine size and design. These one-off manufacturing custom design turbines have relatively higher manufacturing set-up costs, longer lead times, and higher capital costs than the standard design turbines manufactured in larger volumes. However, turbines produced in standard increments and in larger manufacturing volumes could result in lower costs per turbine, but potentially lower efficiency. Based on pipeline projects and resource assessments, there is significant potential value in creating standard turbine sizes that could offer an economic advantage, as is done for modular microturbines.

40 EE - Geothermal Technologies Office (EE-4G)↗

Optimization of energy requirements for CO 2 post-combustion capture process through advanced thermal integration

The energy optimization modeling work described here was performed to determine efficiency improvements that could be achieved for existing coal-fired power plants to retrofit a partial CO 2 capture from the post-combustion flue gas for carbon sequestration through thermal integration. The work presented includes optimization of the mono-ethanol amine (MEA)-based post-combustion CO 2 capture to reduce energy requirements that could be achieved at existing power plants by thermal integration of the steam turbine cycle, boiler, CO 2 compression train and post-combustion CO 2 capture process to offset efficiency and capacity losses that would be incurred by retrofit or implementation of post-combustion CO 2 capture. Furthermore, partial CO 2 capture, involving treatment of less than 100% of the flue gas leaving the plant and modular design of the CO 2 scrubbing system, was also investigated. Thermal integration of the steam turbine cycle with boiler and CO 2 compression train improved cycle and plant performance and offset, in part, the negative effects of post-combustion CO 2 capture. The best-analyzed integration options improved gross power output by 5% and net unit efficiency by 1.57%, relative to the conventional MEA process. Operating with 40% CO 2 capture increased gross power output by 11.6–14% (depending on the MEA thermal integration option), relative to the conventional MEA integration and 90% CO 2 capture. The improvement in net unit performance is larger compared to the improvement in turbine cycle performance because of the CO 2 compression work, which is also reduced by partial CO 2 capture.

42 ENGINEERING↗

Development of Corrosion- and Erosion-Resistant Coatings for Advanced Ultra-Supercritical Materials

This final report summarized the research efforts and major findings of the Phase I Project “Development of Corrosion- and Erosion-Resistant Coatings for Advanced Ultra-Supercritical Materials”, for the period of October 1, 2019 – Sept. 30, 2021. This project is a collaborative endeavor between Tennessee Tech University, Purdue University, Oak Ridge National Laboratory, Siemens Corporation, and Eastern Plating, LLC, aiming at improving the durability and lifetime of high-pressure (HP) steam turbine blades in advanced ultra-supercritical (A-USC) coal-fired power plants through the development of corrosion/erosion-resistant coatings manufactured via a low-cost electrolytic codeposition process. While Tribaloy alloy T-400C was identified by the U.S. A-USC Materials Consortium as a promising coating composition, further composition optimization is needed to enhance its corrosion and erosion resistance for protecting the A-USC Ni-base turbine components. An integrated computational and experimental approach was employed to optimize coating composition/microstructure and processing parameters. In order to identify candidate coating compositions that could offer balanced properties, thermodynamic calculations were performed to explore the γ+Laves composition space in the Co-Ni-Cr-Mo-Si system with different alloying additions at 600-800 °C. Guided by the calculation results, experimental assessment of selected alloys led to the development of a new generation of Tribaloy compositions with the optimal levels of Cr, Mo and Si, reactive element (e.g., 0.4-0.6 wt.% Y) and other alloying additions. The low-cost and non-line-of-sight electro-codeposition process was employed to deposit a Ni(Co)-CrMoSiY composite coating on commercial Haynes 282 (H282) Ni-base alloy. A diffusion treatment was subsequently applied to convert the composite to the Tribaloy-type coating. Both the codeposition parameters and heat treatment conditions were varied to achieve the desired coating composition, microstructure and phase constituents. In addition, since additive manufacturing (AM) may be an alternative cost-saving option for potential A-USC turbine repair, laser direct deposition was explored to fabricate the H282 alloy with minimal defects. The electro-codeposited Tribaloy coating was also applied to the AM H282 substrate to demonstrate the viability of the coating process in improving the surface finish of AM alloys. Both high-temperature oxidation performance and solid particle erosion (SPE) resistance of model alloys and electro-codeposited coatings were evaluated. About 25 model alloys with various Cr/Mo ratios and reactive element levels, as well as partial substitution of Mo with Nb were evaluated with regard to their oxidation resistance in both air and pure steam at 760-800°C. Compositions based on Ni(Co)-20Cr-18Mo-2.6Si-0.6Y (wt.%) showed significantly improved oxidation resistance over the baseline T400-C. Based on the alloy development results, three generations of new Tribaloy coatings (Gen-1, Gen-2, and Gen-3) with various Mo/Cr contents and Y levels were prepared via electro-codeposition and their microstructure/performance were evaluated. Outstanding air and steam oxidation resistance was achieved for the Gen-2 and Gen-3 coatings. Furthermore, while the SPE resistance of the coatings depended on many factors such as temperature, environment, erodent, velocity and impact angle, the coated samples exhibited similar or better SPE resistance compared to the H282 substrate when magnetite was used as erodent (which is a realistic erodent in A-USC steam turbines). The new Tribaloy coatings also had good long-term compatibility with the H282 alloy substrate. The two large-sized rotating barrels were designed, constructed, and employed to coat dummy HP blades. Uniform coating thickness and microstructure were achieved at various blade locations. Also, a preliminary techno-economic analysis of the proposed coating process was conducted to quantify the cost-effectiveness and to assess the commercial viability of the corrosion- and erosion-resistant coatings. It is estimated that a cost reduction of ~30% could be achieved with the electro-codeposition coating process over the state-of-the-art high velocity oxygen fuel (HVOF) thermal spray. Compared to the leading Tribaloy coating technologies such as HVOF and plasma transfer alloying, electro-codeposition based process has advantages such as low-cost process equipment, uniform deposition even for complex shapes, low levels of contaminants/porosities, reduction of powder waste, and potentially better surface finish and longer turbine service life. The Phase 1 study has demonstrated that it is feasible to develop an electro-codeposited Tribaloy coating with balanced corrosion and erosion properties, even though additional research efforts such as further coating process scale-up and longer-term performance evaluation under realistic A-USC conditions are clearly needed.

20 FOSSIL-FUELED POWER PLANTS↗

Development of Novel Ferritic-Martensitic Steels with Superior Creep Properties for Power Plant Applications

A creep resistant martensitic steel, CPJ-7, was developed with an operating temperature approaching 650°C. Subsequently, another creep resistant martensitic steel, JMP, was designed with the potential to operate at, or slightly above, 650°C. This report describes the development of these alloys from early iterations of CPJ steels to the final CPJ-7 formulation as well as the more heat resistant JMP steel formulation. The design originated from computational modeling for phase stability and precipitate strengthening using fifteen constituent elements. Approximately forty heats of CPJ and ten of JMP, each weighing ~7 kg, were vacuum induction melted. A computationally optimized heat treatment schedule was developed to homogenize the ingots prior to hot forging and rolling prior to final normalization and tempering. Overall, wrought and cast versions of CPJ-7 present superior creep properties when compared to wrought and cast versions of COST alloys for steam turbine and wrought and cast versions of P91/92 for boiler applications. For instance, the Larson Miller Parameter curve for CPJ-7 at 650°C almost coincides with that of COST E at 620°C. The prolonged creep life was attributed to slowing down the process of the destabilization of the MX and M 23 C 6 precipitates at 650°C. On the other hand, the cast version of CPJ-7 also revealed superior mechanical performance, well above commercially available cast 9% Cr martensitic steel or derivatives, especially for creep life at 650°C. The casting process employed slow cooling to simulate the conditions of a thick wall full-size steam turbine casing but utilized a separate homogenization step prior to final normalization and tempering. To advance the development of CPJ-7 for commercial applications, a process was used to scale up the production of the alloy using vacuum induction melting (VIM) and electroslag remelting (ESR), which underlined the importance of melt processing control of intentionally designed minor and trace elements in these advanced alloys. Following the work on CPJ-7, the JMP steels were designed with higher Co for increased solid solution strengthening, Si for oxidation resistance and increased W (with low Mo content) for matrix strength and stability as well as solid solution strengthening. The JMP steels showed increases in creep life compared to CPJ-7 between 118 to 150% at 650°C for testing at various stresses between 138 MPa and 207 MPa. On a Larson-Miller plot, the performance of the JMP steels surpasses that of state-of-the-art MARBN and other MARBN-type steels. The influence of various elements within the composition of the alloys on the microstructure and mechanical properties are discussed. This report presents approximately 420,000 h of in-house creep testing, the equivalent of almost 50 years of cumulative creep tests.

36 MATERIALS SCIENCE↗