Results for “solar PV permitting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Patience is a virtue: A data-driven analysis of rooftop solar PV permitting timelines in the United States

© 2020 The Authors Local permitting can ensure the safe installation and operation of rooftop solar photovoltaic (PV) systems. At the same time, burdensome local permitting processes and local variation in requirements may pose challenges to PV deployment. In this article, we explore new data on the durations between key steps in the PV permitting process in the United States. The data suggest that a typical customer can expect to wait around 25–100 days from permit application until an installed system passes inspection. Permit durations vary significantly across jurisdictions, due in part to differences in local permitting policies. However, permit durations vary as significantly within jurisdictions as across them, in part due to significant variation across installers, suggesting that installer strategies and practices play an important role in permitting timelines. Permit durations have declined over time, reflecting progress from permit streamlining policies and jurisdiction learning-by-doing, though durations have stabilized in recent years. The data suggest that typical PV customers still face long and uncertain permitting timelines in the United States.

O'Shaughnessy, E↗

Streamline, Organizational, Legislative and Administrative Response to Permitting, PV Market Share, and Solar Energy Costs (Broward Go SOLAR)

Broward County and its partners (the Go SOLAR Team), operating under a Department of Energy Rooftop Solar Challenge Agreement, designed, developed and implemented an online permitting system for rooftop solar PV systems. This is a single web based system with a single permit fee that will issue a permit, with a set of design plans preapproved by partner building officials, within one hour. The system is currently available at gosolar.broward.org for use within any of the partner Authorities Having [permitting] Jurisdiction (AHJ). Additionally, the Go SOLAR Team researched, developed and to the extent feasible, implemented three best management practices to make a fertile environment for the new online permit system. These included Net Metering and Interconnection Standards, Solar-Friendly Financing, and Planning and Zoning Ordinances. Finally, the team implemented a substantial outreach effort to advocate for the development of solar in Broward County, with an emphasis on Solar Rights, concluding with a Go SOLAR Fest day and a half conference with over 1,200 attendees and 50 exhibitors. The Go SOLAR project was completed on time, under DOE’s budgeted amount, and all project objectives were met or exceeded.

14 SOLAR ENERGY↗

Confirming the Strength of Residential Roof Structures for Solar Installations

The rooftop solar PV permitting process involves a number of steps and varies greatly, even between neighboring cities. Jurisdictions follow state or national codes, but each may interpret the codes in their own way and insert additional requirements. In some locations, a rooftop structural analysis conducted by a professional engineer is required before a rooftop solar permit is issued. The extra step is not universally applied across states or municipalities, and can alter scheduling logistics and add hundreds of dollars to the cost of the system.

14 SOLAR ENERGY↗

SolarAPP+ Pilot Analysis: Performance and Impact of Instant, Online Solar Permitting

The National Renewable Energy Laboratory (NREL) led a collaborative effort to develop the Solar Automated Permit Processing Plus (SolarAPP+), a no-cost solar permitting software solution to address residential solar photovoltaic (PV) permitting resource constraints and streamline solar adoption processes among authorities having jurisdiction (AHJs). The SolarAPP+ is an online portal that automates permit plan review, enabling an instant permit approval process for code-compliant residential PV systems. Based on national model building, electrical, and fire codes, the SolarAPP+ automatically performs a compliance check of permit inputs against code requirements and produces an inspection checklist that can be used to verify installation practices, workmanship, and adherence to the approved design. NREL conducted a two-phase pilot with five participating AHJs and 16 solar contractors, spanning from November 2020 through December 2021, evaluating the ability of SolarAPP+ to deliver instant permits and its impact on four critical areas within each AHJ: permit review timelines; solar adoption timelines; AHJ time saved; and inspection results. The pilot confirmed that SolarAPP+ reduced permit review times to less than one day, reduced solar adoption timelines by an average of 12 days, saved an estimated 2,067 staff hours, and had comparable inspection results to those found in traditional permitting. The pilot further identified key lessons for improving SolarAPP+, including ways to streamline SolarAPP+ adoption, development of training resources, and expansion of supported products.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Go Solar

Go SOLAR is a web based rooftop solar PV permitting system. The system is designed to be shared by multiple permitting jurisdictions, requires data entry by the applicant and selection of the desired, available design plan. Then, the system issues a permit. The system also allows scheduling of field inspections for installation of the PV system.

Bousquet, Andrea↗

Reducing Residential PV System PII Costs

SolarPro article outlining the residential pv solar permitting landscape as it exists today, outlining inefficiencies and bottlenecks. Description of resources and best practices to help reduce current cost and resource contraints.

14 SOLAR ENERGY↗

Confirming the Strength of Residential Roof Structures for Solar Installations

Researchers at the U.S. Department of Energy’s Sandia National Laboratories conducted a first-ofits- kind study to help dispel misperceptions that many existing rooftops cannot carry the actual load created by rooftop solar photovoltaic (PV) installations. Test data on rooftop structure load capacity wasn’t previously available to the industry, and research to collect such data was made costly by the need to test each scaled structure to the point of failure. The Energy Department funded this study to provide scientific data to the industry that can decrease uncertainty, help eliminate misperceptions, and ultimately alleviate extraneous solar PV permitting costs.

Dwyer, Stephen F.↗

SolarAPP+ Performance Review (2022 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have those specifications automatically reviewed for code compliance, and receive instant approval for code-compliant systems. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. SolarAPP+ is available to authorities having jurisdiction (AHJs) at no cost. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through conventional AHJ permitting processes. As of the end of 2022, the National Renewable Energy Laboratory (NREL) had contacted over 1,500 AHJs with significant solar permitting volume regarding SolarAPP+. Of those, 607 AHJs had at least expressed interest in the platform. 16 AHJs had begun piloting the platform and 15 of these had publicly launched the platform by the end of 2022. In 2022, 206 installers submitted 11,092 permits through the SolarAPP+ platform, including 708 permits for solar+storage systems. SolarAPP+ permits accounted for around 37% of all permits issued in participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 8 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved between 3,500 and 13,900 hours of AHJ staff time in 2022. Finally, we find evidence that SolarAPP+ may improve inspection outcomes, with SolarAPP+ projects failing inspections about 28% less frequently than traditional projects.

14 SOLAR ENERGY↗

Photovoltaic (PV) Quick Reference Guide

This Photovoltaic (PV) and Energy Storage System (EES) Quick Reference Guide is for inspectors inspecting projects permitted with SolarAPP+.

ENERGY PLANNING, POLICY, AND ECONOMY,SOLAR ENERGY↗

Solar Automated Permit Processing Software for Distributed PV (Cooperative Research and Development Final Report, CRADA Number CRD-19-00825)

NREL and its project partners built and commercialized the novel Solar Automated Permitting Processing Plus (SolarAPP+) software platform that delivers instant residential rooftop solar permits. The tool provides installers with a standard portal for entering permit information for residential solar systems across all Authorities Having Jurisdiction (AHJs) using SolarAPP+, thereby providing a streamlined plan review form, transparency into permitting timelines, and required specifications. The project has proven to reduce permitting timelines from as many as 20 business days to zero, delivering solar projects faster in the four participating AHJs using the platform. Streamlining permitting timelines, all else equal, results in consumers installing their systems and reducing their electricity bills faster. The continued expansion of SolarAPP+ features and adoption nationwide will expand the benefits of the SolarAPP+ beyond the current user base.

14 SOLAR ENERGY↗

County Land-Use Regulations for Solar Energy Development in Colorado

We present a survey of county-level policies on ground-mounted solar development across Colorado, including both solar-specific ordinances as well as general land-use code that might be applicable in counties without solar-specific policies. This report provides an accessible reference for stakeholders interested in identifying counties with particular regulations or in analyzing the diversity of regulations across Colorado. We defined a set of search criteria to find information on solar definitions and classifications, permitting processes, and use-specific requirements in each of Colorado's 64 counties. With those criteria, we reviewed relevant ordinances, land-use code, and comprehensive and master plans. If any uncertainties were identified, we contacted county officials for clarification. The findings are categorized and mapped to illustrate the distribution of key policies adopted across Colorado's counties on the following topics: solar definitions, solar siting policy documentation, categorization of PV systems for permitting, 1041 permitting, solar on agricultural land, panel height restrictions, fencing requirements, vegetation management, visual impacts, decommissioning plans, and financial assurance for decommissioning. Additionally, we identify and discuss policies that might impact the deployment of agrivoltaics, a dual land use combining both agriculture and solar on the same land, which might not fit neatly in existing zoning definitions and solar-specific regulations.

14 SOLAR ENERGY↗

Understanding Adoption of a Key Soft Cost Reduction Strategy: Modeling Administrative Choices Regarding Streamlined Solar Permitting (Final Technical Report)

In the U.S., the process by which residential rooftop solar photovoltaic (PV) system installations are permitted and inspected by an “authority having jurisdiction” (AHJ) and interconnected to the grid varies across the country. As the U.S. has roughly 23,000 AHJs and 3,000 utilities with varying degrees of local autonomy, permitting, inspection, and interconnection (PI&I) heterogeneity represents a significant “soft cost” barrier to the growth of the residential solar PV market. Burkhardt et al. (2015), for example, finds that variations in local permitting procedures alone can lead to differences in average residential PV prices of approximately ${$}$0.14-${$}$0.18/W. When the authors considered jurisdictional variation in permitting plus regulatory procedures, that price differential grew to ${$}$0.64-${$}$0.93/W between the least-favorable and most-favorable jurisdictions. The objective of this project was to determine suites of PI&I reforms that fit the preferences of AHJs and utilities nationwide, as mediated through the preferences of PV installers, with the hoped-for impact of significantly improving the consistency of PI&I for solar PV across the U.S. To accomplish this objective, the project team set out to design and implement survey instruments with embedded discrete choice experiments (DCEs) that used individual PI&I reforms as attributes, with levels informed by a detailed understanding of the PI&I reforms. The analysis of the surveys was to include both defined and latent class analysis of the survey results, in order to identify different sets of AHJs and utilities that would prefer different “mass customized” SSP practice combinations. Note that this project would also have advanced the social science by applying well-established choice analysis techniques to the novel setting of public administration.

14 SOLAR ENERGY↗

Simulation of Distributed PV Power Output in Oahu Hawaii

Distributed solar photovoltaic (PV) power generation in Oahu has grown rapidly since 2008. For applications such as determining the value of energy storage, it is important to have PV power output timeseries. Since these timeseries of not typically measured, here we produce simulated distributed PV power output for Oahu. Simulated power output is based on (a) satellite-derived solar irradiance, (b) PV permit data by neighborhood, and (c) population data by census block. Permit and population data was used to model locations of distributed PV, and irradiance data was then used to simulate power output. PV power output simulations are presented by sub-neighborhood polygons, neighborhoods, and for the whole island of Oahu. Summary plots of annual PV energy and a sample week timeseries of power output are shown, and a the files containing the entire timeseries are described.

14 SOLAR ENERGY↗

Benefits of the SolarAPP+ Online Permitting Software

The Solar Automated Permit Processing Plus (SolarAPP+) software is an online platform that provides plan review and instantly issues permits for code-compliant residential photovoltaic (PV) systems.

automated permitting↗