Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “software cost estimation practices”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

A Multi-Scale Computational Platform for Predictive Modeling of Corrosion in Al-Steel Joints (Final Report)

The research team proposed to develop innovative multi-scale models to predict corrosion and the resulting mechanical performances in aluminum-steel joints. The methods of joining considered are resistance spot welding, self-piercing riveting, and rivet-welding, all suitable for mass production applications. The multi-scale models integrate high throughput first-principle calculations based on density functional theory (DFT), high throughput calculation of phase diagrams (CALPHAD) modeling, and finite element method (FEM) simulations. These models are to be validated through laboratory experiments. Furthermore, the models are available as open source so as to enable scientists and engineers in the community to adapt and contribute to the development and application. The approaches rely on the research team’s extensive experience on the prediction of properties of individual phases at finite temperatures and variable compositions through DFT calculations, and our broad expertise on dissimilar material joining and their corrosion. The proposed computational framework enables high throughput computations for improved predictions of corrosion and the associated mechanical performance in dissimilar material joints, resulting in significant reduction in computational time needed by the current state-of-the-art methods. With the participation of researchers from three universities, an auto manufacturer, two manufacturing technology/equipment suppliers, and a software developer/vendor, the interdisciplinary research team applies the technical development on both phase-based modeling and laboratory experiments into the automobile body joining processes for validation and technology demonstration. The global cost of corrosion was estimated at about 3.4% of the global GDP in 2013. By using available corrosion control practices, it is estimated a saving between 15-35% of the cost of corrosion. In the U.S., more than $276 billion is spent repairing corrosion damage. Prediction of the corrosion and its impact on performance of the dissimilar material joints is critical for reducing the massive number of the current corrosion-based recalls for automobiles. Thus, the project goal is to develop models to enable predictive maintenance and end-of-life planning of multi-metal joints with risk of corrosion under different conditions such as exposure to high temperatures in summer and salt solutions in winter, quantified through its pH. An academia-industry consortium led by the University of Michigan and including Pennsylvania State University, University of Illinois Urbana-Champaign, University of Georgia, General Motors Company, Livermore Software Technology Corporation, and Optimal Process Technologies, LLC. created multi-scale models for prediction of corrosion in aluminum-steel joint structures such of them used in vehicle subassemblies – chassis and transmission systems. Starting from the first principle calculations, the team developed mathematical and data-driven models to predict the metallic components, which are formed during joining of two metals, for example aluminum and steel - a lightweight multilateral system which is currently used in more than 60% car bodies. These models were used for simulating chemical reactions that are happening when the joining metallic components are exposed to high temperatures and different pH values. The team was able to predict how the corrosion installs on the metallic components and how they lead to a sudden failure of components in cars. Newly developed machine learning algorithms combining Science, Technology, Engineering and Math disciplines, advanced finite element simulation and experimental validations have been integrated in a platform for prediction of the corrosion evolution and prediction the failure of joints under mechanical loadings and fatigue. Moreover, based on machine learning and inverse analysis, the team proposed solutions for designing new metallic alloys less susceptible to corrosion when joining multi-material assembles. An average of 4% error compared with experiments was achieved for the most common joints that are used in vehicle subassemblies.

36 MATERIALS SCIENCE↗

Time-stepping DPG formulations for the heat equation

For a wide range of PDEs, the discontinuous Petrov–Galerkin (DPG) methodology of Demkowicz and Gopalakrishnan provides discrete stability starting from a coarse mesh and minimization of the residual in a user-controlled norm, among other appealing features. Research on DPG for transient problems has mainly focused on spacetime discretizations, which has theoretical advantages, but practical costs for computations and software implementations. The sole examination of time-stepping DPG formulations was performed by Führer, Heuer, and Gupta, who applied Rothe’s method to an ultraweak formulation of the heat equation to develop an implicit time-stepping scheme; their work emphasized theoretical results, including error estimates in time and space. Here, we follow Führer, Heuer, and Gupta in examining the heat equation; our focus is on numerical experiments, examining the stability and accuracy of several formulations, including primal as well as ultraweak, and explicit as well as implicit and Crank–Nicolson time-stepping schemes. We are additionally interested in communication-avoiding algorithms, and we therefore include a highly experimental formulation that places all the trace terms on the right-hand side of the equation.

97 MATHEMATICS AND COMPUTING↗

The National Solar Permitting Database

"The soft costs of solar — costs not associated with hardware — remain stubbornly high. Among the biggest soft costs are those associated with inefficiencies in local permitting and inspection. A study by the National Renewable Energy Laboratory and Lawrence Berkeley National Laboratory estimates that these costs add an average of $0.22/W per residential installation. This project helps reduce non-hardware/balance of system (BOS) costs by creating and maintaining a free and available site of permitting requirements and solar system verification software that installers can use to reduce time, capital, and resource investments in tracking permitting requirements. Software tools to identify best permitting practices can enable government stakeholders to optimize their permitting process and remove superfluous costs and requirements. Like ""a Wikipedia for solar permitting"", users can add, edit, delete, and update information for a given jurisdiction. We incentivize this crowdsourcing approach by recognizing users for their contributions in the form of SEO benefits to their company or organization by linking back to users' websites."

Gunderson, Renic↗

The National Solar Permitting Database

"The soft costs of solar — costs not associated with hardware — remain stubbornly high. Among the biggest soft costs are those associated with inefficiencies in local permitting and inspection. A study by the National Renewable Energy Laboratory and Lawrence Berkeley National Laboratory estimates that these costs add an average of $0.22/W per residential installation. This project helps reduce non-hardware/balance of system (BOS) costs by creating and maintaining a free and available site of permitting requirements and solar system verification software that installers can use to reduce time, capital, and resource investments in tracking permitting requirements. Software tools to identify best permitting practices can enable government stakeholders to optimize their permitting process and remove superfluous costs and requirements. Like ""a Wikipedia for solar permitting"", users can add, edit, delete, and update information for a given jurisdiction. We incentivize this crowdsourcing approach by recognizing users for their contributions in the form of SEO benefits to their company or organization by linking back to users' websites."

Gunderson, Renic↗

Building analytics and monitoring-based commissioning: industry practice, costs, and savings

As building energy and system-level monitoring becomes more common, facility teams are faced with an overwhelming amount of data. This data does not typically lead to insights, corrective actions, and energy savings unless it is stored, organized, analyzed, and prioritized in automated ways. The Smart Energy Analytics Campaign is a public-private sector partnership program focused on supporting commercially available energy management and information systems (EMIS) technology use and monitoring-based commissioning (MBCx) practices. MBCx is an ongoing commissioning process with focus on analyzing large amounts of data on a continuous basis. EMIS tools are used in the MBCx process to organize, present, visualize, and analyze the data. With campaign data from over 400 million square feet (sq. ft.) of installed space, this paper presents the results achieved by owners that are implementing EMIS, along with associated technology costs. The study’s EMIS users that reported savings achieved the median cost savings of $0.19/sq. ft. and 7% annually, with savings shown to increase over time. For 35 portfolio owners, the median base cost to install an EMIS was $0.03/sq. ft., with an annual recurring software cost of $0.02/sq. ft. and an estimated annual labor cost of $0.03/sq. ft. Two types of EMIS systems -- energy information systems and fault detection and diagnostic systems -- are defined in the body of the paper. Of the two, we find that fault detection and diagnostic systems have both higher savings and higher costs. The paper offers a characterization of EMIS products, MBCx services, and trends in the industry.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Hydropower Biological Evaluation Toolset (HBET) for Characterizing Hydraulic Conditions and Impacts of Hydro-Structures on Fish

Currently, approximately 16% of the world’s electricity and over 80% of the world’s renewable electricity is generated from hydropower resources, and there is potential for development of a significant amount of new hydropower capacity. However, in practice, realizing all the potential hydropower resource is limited by various factors, including environmental effects and related mitigation requirements. That is why hydropower regulatory requirements frequently call for targets to be met regarding fish injury and mortality rates. Hydropower Biological Evaluation Toolset (HBET), an integrated suite of software tools, is designed to characterize hydraulic conditions of hydropower structures and provide quantitative estimates of fish injury and mortality rates due to various physical stressors including strike, pressure, and shear. HBET enables users to design new studies, analyze data, perform statistical analyses, and evaluate biological responses. In this paper, we discuss the features of the HBET software and describe a case study that illustrates its functionalities. Here, HBET can be used by turbine manufacturers, hydropower operators, and regulators to design and operate hydropower systems that minimize ecological impacts in a cost-effective manner.

13 HYDRO ENERGY↗

Field testing and validation of a low-cost MPC for demand flexibility for grid-interactive K-12 schools

K-12 school buildings account for the highest energy consumption within the public sector. Implementing advanced HVAC controls in grid-interactive K-12 schools could bring substantial economic advantages and grid flexibility. Our previous study demonstrated that a low-cost model predictive control (MPC) solution, which coordinates multiple packaged units, can enable demand flexibility without major hardware upgrades. However, a significant gap remains between academic pilots and market-ready scalable solutions. This paper extends the previous single-site pilot to a multi-site demonstration involving three school campuses (95 total units) through a commercial technology transfer process. Addressing the challenge of verifying performance with sparse field data, we present a new statistical approach using Bayesian methods to estimate the MPC’s effect on peak demand. Unlike traditional methods, this approach robustly quantifies uncertainty in non-normal, limited datasets. The results confirm the solution’s replicability, achieving a 21.6–38.9% reduction in HVAC peak demand (10.8–22.1% at the site-level) with > 98% probability across diverse locations. Finally, we document critical barriers to scaling software-as-a-service (SaaS) solutions–such as API instability and diverse legacy systems–and offer practical strategies to accelerate the commercial adoption of grid-interactive efficient buildings.

Ham, Sang Woo↗

Practical factors of envelope model setup and their effects on the performance of model predictive control for building heating, ventilating, and air conditioning systems

Model predictive control (MPC) for buildings is attracting significant attention in research and industry due to its potential to address a number of challenges facing the building industry, including energy cost reduction, grid integration, and occupant connectivity. However, the strategy has not yet been implemented at any scale, largely due to the significant effort required to configure and calibrate the model used in the MPC controller. While many studies have focused on methods to expedite model configuration and improve model accuracy, few have studied the impact a wide range of factors have on the accuracy of the resulting model. In addition, few have continued on to analyze these factors’ impact on MPC controller performance in terms of final operating costs. Therefore, this study first identifies the practical factors affecting model setup, specifically focusing on the thermal envelope. The seven that are identified are building design, model structure, model order, data set, data quality, identification algorithm and initial guesses, and software tool-chain. Then, through a large number of trials, it analyzes each factor's influence on model accuracy, focusing on grey-box models for a single zone building envelope. Finally, this study implements a subset of the models identified with these factor variations in heating, ventilating, and air conditioning MPC controllers, and tests them in simulation of a representative case that aims to optimally cool a single-zone building with time-varying electricity prices. It is found that a difference of up to 20%25 in cooling cost for the cases studied can occur between the best performing model and the worst performing model. The primary factors attributing to this were model structure and initial parameter guesses during parameter estimation of the model.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

SolarAPP+ Pilot Analysis: Performance and Impact of Instant, Online Solar Permitting

The National Renewable Energy Laboratory (NREL) led a collaborative effort to develop the Solar Automated Permit Processing Plus (SolarAPP+), a no-cost solar permitting software solution to address residential solar photovoltaic (PV) permitting resource constraints and streamline solar adoption processes among authorities having jurisdiction (AHJs). The SolarAPP+ is an online portal that automates permit plan review, enabling an instant permit approval process for code-compliant residential PV systems. Based on national model building, electrical, and fire codes, the SolarAPP+ automatically performs a compliance check of permit inputs against code requirements and produces an inspection checklist that can be used to verify installation practices, workmanship, and adherence to the approved design. NREL conducted a two-phase pilot with five participating AHJs and 16 solar contractors, spanning from November 2020 through December 2021, evaluating the ability of SolarAPP+ to deliver instant permits and its impact on four critical areas within each AHJ: permit review timelines; solar adoption timelines; AHJ time saved; and inspection results. The pilot confirmed that SolarAPP+ reduced permit review times to less than one day, reduced solar adoption timelines by an average of 12 days, saved an estimated 2,067 staff hours, and had comparable inspection results to those found in traditional permitting. The pilot further identified key lessons for improving SolarAPP+, including ways to streamline SolarAPP+ adoption, development of training resources, and expansion of supported products.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Measured and estimated performance of a fleet of shaded photovoltaic systems with string and module-level inverters

Shade obstructions can significantly impact the performance of photovoltaic (PV) systems. Although there are many models for partially shaded PV arrays, there is a lack of information available regarding their accuracy and uncertainty when compared with actual field performance. This work assesses the recorded performance of 46 residential PV systems, equipped with either string-level or module-level inverters, under a variety of shading conditions. We compare their energy production data to annual PV performance predictions, with a focus on the practical models developed here for National Renewable Energy Laboratory's system advisor model software. This includes assessment of shade extent on each PV system by using traditional onsite surveys and newer 3D obstruction modelling. The electrical impact of shade is modelled by either a nonlinear performance model or assumption of linear impact with shade extent, depending on the inverter type. When applied to the fleet of residential PV systems, performance is predicted with median annual bias errors of 2.5% or less, for systems with up to 20% estimated shading loss. The partial shade models are not found to add appreciable uncertainty to annual predictions of energy production for this fleet of systems but do introduce a monthly root-mean-square error of approximately 4%-9% due to seasonal effects. Here the use of a detailed 3D model results in similar or improved accuracy over site survey methods, indicating that, with proper description of shade obstructions, modelling of partially shaded PV arrays can be done completely remotely, potentially saving time and cost.

14 SOLAR ENERGY↗

Integrated Cost and Schedule using Monte Carlo Simulation of a CPM Model - 12419

This discussion of the recommended practice (RP) 57R-09 of AACE International defines the integrated analysis of schedule and cost risk to estimate the appropriate level of cost and schedule contingency reserve on projects. The main contribution of this RP is to include the impact of schedule risk on cost risk and hence on the need for cost contingency reserves. Additional benefits include the prioritizing of the risks to cost, some of which are risks to schedule, so that risk mitigation may be conducted in a cost-effective way, scatter diagrams of time-cost pairs for developing joint targets of time and cost, and probabilistic cash flow which shows cash flow at different levels of certainty. Integrating cost and schedule risk into one analysis based on the project schedule loaded with costed resources from the cost estimate provides both: (1) more accurate cost estimates than if the schedule risk were ignored or incorporated only partially, and (2) illustrates the importance of schedule risk to cost risk when the durations of activities using labor-type (time-dependent) resources are risky. Many activities such as detailed engineering, construction or software development are mainly conducted by people who need to be paid even if their work takes longer than scheduled. Level-of-effort resources, such as the project management team, are extreme examples of time-dependent resources, since if the project duration exceeds its planned duration the cost of these resources will increase over their budgeted amount. The integrated cost-schedule risk analysis is based on: - A high quality CPM schedule with logic tight enough so that it will provide the correct dates and critical paths during simulation automatically without manual intervention. - A contingency-free estimate of project costs that is loaded on the activities of the schedule. - Resolves inconsistencies between cost estimate and schedule that often creep into those documents as project execution proceeds. - Good-quality risk data that are usually collected in risk interviews of the project team, management and others knowledgeable in the risk of the project. The risks from the risk register are used as the basis of the risk data in the risk driver method. The risk driver method is based in the fundamental principle that identifiable risks drive overall cost and schedule risk. - A Monte Carlo simulation software program that can simulate schedule risk, burn WM2012 rate risk and time-independent resource risk. The results include the standard histograms and cumulative distributions of possible cost and time results for the project. However, by simulating both cost and time simultaneously we can collect the cost-time pairs of results and hence show the scatter diagram ('football chart') that indicates the joint probability of finishing on time and on budget. Also, we can derive the probabilistic cash flow for comparison with the time-phased project budget. Finally the risks to schedule completion and to cost can be prioritized, say at the P-80 level of confidence, to help focus the risk mitigation efforts. If the cost and schedule estimates including contingency reserves are not acceptable to the project stakeholders the project team should conduct risk mitigation workshops and studies, deciding which risk mitigation actions to take, and re-run the Monte Carlo simulation to determine the possible improvement to the project's objectives. Finally, it is recommended that the contingency reserves of cost and of time, calculated at a level that represents an acceptable degree of certainty and uncertainty for the project stakeholders, be added as a resource-loaded activity to the project schedule for strategic planning purposes. The risk analysis described in this paper is correct only for the current plan, represented by the schedule. The project contingency reserve of time and cost that are the main results of this analysis apply if that plan is to be followed. Of course project managers have the option of re-planning and re-scheduling in the face of new facts, in part by mitigating risk. This analysis identifies the high-priority risks to cost and to schedule, which assist the project manager in planning further risk mitigation. Some project managers reject the results and argue that they cannot possibly be so late or so overrun. Those project managers may be wasting an opportunity to mitigate risk and get a more favorable outcome. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Empirical Validation of UBEM: An Assessment of Bias in Urban Building Energy Modeling for Chicago

Residential and commercial buildings currently account for 30% of total global final energy consumption. Urban-scale building energy modeling (UBEM) can enable scalable investments and unlock building improvements by quantifying energy, demand, emissions, and cost reductions of specific measures or packages for building-specific technologies in large geographic regions. While the sophistication of UBEM data sources and technologies have increased dramatically in the past decade, there remains a knowledge gap for empirical validation and sources of bias between building-specific energy models and measured data at varying geographic scales.As UBEM continues to develop, systemic analysis of accuracy, bias, and limitations of the resulting models is necessary to inform best practices and move toward standardization. These are characterized for the Automatic Building Energy Modeling (AutoBEM) software suite with an initial case study involving metered electricity consumption data from 247,188 buildings in Chicago, Illinois, USA - averaged across years 2019-2021 - compared to the following datasets: (1) the AutoBEM-generated nation-scale Model America version 2 (MAv2) data for 596,064 buildings, (2) tax assessor data for 579,829 buildings, (3) tax assessor data filled with MAv2, and (4) 102 representative dynamic archetypes. The accuracy is reported for every building type and vintage combination, along with multiple sources of bias for unique building descriptors. The AutoBEM simulation workflow produced energy consumption estimates that closely match aggregated metered electricity consumption data for different types of buildings constructed during various time periods at the city scale - with initial normalized mean bias error of 10.9%, and 1.1% after removing outliers. Contribution of statistically significant factors including building type, land use, age, and size to variance in UBEM bias is quantified.

Garg, Ankur↗

Investigation of Best-Practices and Computationally Inexpensive Radiative Exchange Models for Discrete Element Method Modeling of Aluminosilicate Particles in Concentrating Solar Power Environments

Chemically inert, aluminosilicate based particles have been investigated as both a thermal transport and sensible energy storage medium for concentrating solar power facilities. These particles will experience a wide range of operating temperatures (300-1000 K) and handling conditions (dense to dilute falling particle curtains, dense granular flows, or dense structures), requiring specially-designed and optimized infrastructures. The relative influence of collisional and frictional interactions between particles varies based on temperature-dependent particulate properties and greatly impacts the bulk, granular flow behavior. These underlying physics are captured using discrete element method modeling tools. However, this modeling method is computationally expensive as each particle position and interaction is tracked during the simulation. These modeling methods are further complicated by introducing temperature-dependent particle properties, high-temperature radiative exchange, and directional irradiation sources experienced by granular flows in concentrating solar power environments. In this study, coupled experimental and numerical slump testing of aluminosilicate particles was performed and computationally efficient radiative exchange models were evaluated to establish best-practices for discrete element method models for concentrating solar power environments. The three particle types investigated included Carbobead HSP 30 /60, Carbobead CP 30/60, and Granusil 4030. Existing modeling limitations and computationally-efficient multi-modal heat transfer models were evaluated using Aspherix®, a commercial discrete element method software. High-temperature (< 1073 K) slump testing of aluminosilicate particles was performed to investigate the deviation between experimentally-observed and numerically-predicted angles of repose introduced by computation-time reduction practices including the relaxation of the particle elastic modulus and coarse-graining. Coarse-graining is used to use a single modeled particle that is representative of a collection of smaller particles, decreasing the computational cost at the expense of geometric accuracy. Additionally, relaxation of the elastic modulus is used to reduce computational time at the expense of an increased, modeled particle overlap. Prior studies have determined that aluminosilicate particles retain a high elastic modulus at high temperatures (< 1073 K), requiring small simulation timesteps to ensure resolved contact forces resemble appropriate solid mechanics. A parametric study was performed to evaluate the influence of computation time improvements on the deviation between experimental and modeled angle of repose across high temperatures < 1073 K. Additionally, numerical case studies were performed on candidate particle systems at varying porosities and temperatures. These studies were performed to investigate the influence of computationally-efficient radiative-exchange modeling methods coupled to Aspherix® on modeled accuracy and computation time. The recently-developed distance-based approximation was evaluated in estimating radiative exchange between particles and participating surfaces located in close proximity. The distance based approximation was developed to use tabulated estimates of the radiative distribution factor between individual particles and surfaces in close proximity (< 40 particle radii). These methods were expanded to the aluminosilicate particles of interest, including the influence of particle size distributions. To capture radiative exchange between particles and surfaces not in close proximity (> 40 particle radii) and to capture the absorption of directional irradiation from concentrating solar resources, a volumetrically-averaged radiative distribution factor was calculated between the modeled granular flow and surfaces using Monte Carlo ray-tracing for participating media. Volume-averaged absorption and scattering coefficients were predicted using a volumetric discretization of the modeled domain with monodisperse approximations based on geometric optics and experimentally-determined scattering phase functions for aluminosilicate particles.

14 SOLAR ENERGY↗

Building commissioning costs and savings across three decades and 1500 North American buildings

B.V. Building commissioning (Cx) is a process for assuring efficient building operations that can be applied to new construction and existing buildings, resulting in energy and non-energy benefits. Quantifying the benefits of commissioning is challenging, but a 2009 study of 643 commercial buildings provided a solid initial data set to which we added 839 additional buildings for a significantly expanded and updated meta-analysis representing 34.7 million square meters (373 million square feet) of floor area. Since 2009 the commissioning industry has continued to grow, driven by building codes, utility programs, and rising awareness of commissioning benefits. In parallel, building controls have become more sophisticated, and analytics software has emerged to assist with commissioning. We find that delivery mechanism and market segment are key determinants of outcomes, although significant and cost-effective savings are found across the spectrum. Median primary energy savings for Cx projects in existing buildings ranged from 5 percent for those conducted under utility programs, 9 percent for monitoring-based commissioning utility programs (i.e., augmented with submetering and diagnostics), and 14 percent for Cx projects outside of utility programs. Across all project types, median savings ranged from 3 percent for the lodging market segment to 16 percent for public order and safety facilities. Outcomes did not vary significantly by building size or by market segment. Energy savings are rarely estimated for new construction commissioning. We found that the median costs of Cx were lower for the 2018 sample than for the 2009 sample—$\$$2.85 per square meter ($\$$0.26 per square foot) for existing buildings (a 33 percent reduction) and $\$$8.78 per square meter ($\$$0.82 per square foot) for new construction (a reduction of almost 50 percent). The median simple payback time for existing buildings was 1.7 years, with a 25th–75th percentile range of 0.8–3.5 years. Overall, this article summarizes these and other key findings, and discusses how the 2018 data reflects shifts in commissioning practice and outcomes.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Technical Maturity Assessment of Risk-Informed Safety Analysis Tools

Ensuring maximum safety while enhancing economic benefit is one of most important goal of In the of US Light Water Reactor Sustainability (LWRS) program. Optimization of the safety margins will provide best practice to achieve this goal which can also lead to cost reduction. Under the LWRS framework, the Risk-Informed Systems Analysis (RISA) Pathway has been focusing on the optimization of safety margin and minimization of uncertainties to ensure both safety and economics at the highest level. One of the important activities of the pathway is to deploy risk-informed analysis tools to related nuclear industry to support precise representation of safety margins and factors that contribute to cost and safety. The tools therefore need highest technical maturity so that industry can use immediately with strong credibility. The tools should have a capability to support risk-informed decision making for both probabilistic and deterministic elements of safety. The RISA Pathway, therefore, have been performing a comprehensive assessment of technical maturity and verification and validation (V&V) status of selected tools to improve adaptability to the industry. The technical maturity assessment includes three work scope: (a) define requirements based on risk-informed concept; (b) investigate and review development and V&V status for technical maturity assessment; and (c) identify technical gap and propose improvement to meet RISA toolkit requirements. The Requirement Traceability Matrix (RTM) concept was used to capture the requirements from user and developer of the project and/or software. The importance of each requirements was evaluated by Phenomena Identification and Ranking Technology (PIRT) which systematically gathers information and ranks the importance of the information. Finally, degree of the maturity was measured by Technology Readiness Level (TRL) for estimating the maturity of the technologies during the development and acquisition phase of certain technology. This paper summarizes development of assessment method and technical maturity evaluation of multi-purpose probabilistic risk analysis tool RAVEN.

, PIRT↗

Prioritization Risk Integration Simulation Model (PRISM) For Environmental Remediation and Waste Management - 12097

The PRISM (Prioritization Risk Integration Simulation Model), a computer model was developed to support the Department of Energy's Office of Environmental Management (DOE-EM) in its mission to clean up the environmental legacy from the Nation's nuclear weapons materials production complex. PRISM provides a comprehensive, fully integrated planning tool that can tie together DOE-EM's projects. It is designed to help DOE managers develop sound, risk-informed business practices and defend program decisions. It provides a better ability to understand and manage programmatic risks. The underlying concept for PRISM is that DOE-EM 'owns' a portfolio of environmental legacy obligations (ELOs), and that its mission is to transform the ELOs from their current conditions to acceptable conditions, in the most effective way possible. There are many types of ELOs - - contaminated soils and groundwater plumes, disused facilities awaiting D and D, and various types of wastes waiting for processing or disposal. For a given suite of planned activities, PRISM simulates the outcomes as they play out over time, allowing for all key identified uncertainties and risk factors. Each contaminated building, land area and waste stream is tracked from cradle to grave, and all of the linkages affecting different waste streams are captured. The progression of the activities is fully dynamic, reflecting DOE-EM's prioritization approaches, precedence requirements, available funding, and the consequences of risks and uncertainties. The top level of PRISM is the end-user interface that allows rapid evaluation of alternative scenarios and viewing the results in a variety of useful ways. PRISM is a fully probabilistic model, allowing the user to specify uncertainties in input data (such as the magnitude of an existing groundwater plume, or the total cost to complete a planned activity) as well as specific risk events that might occur. PRISM is based on the GoldSim software that is widely used for risk and performance assessment calculations. PRISM can be run in a deterministic mode, which quickly provides an estimate of the most likely results of a given plan. Alternatively, the model can be run probabilistically in a Monte Carlo mode, exploring the risks and uncertainties in the system and producing probability distributions for the different performance measures. The PRISM model demonstrates how EM can evaluate a portfolio of ELOs, and transform the ELOs from their current conditions to acceptable conditions, utilizing different strategic approaches. There are many types of ELOs - contaminated soils and groundwater plumes, disused facilities awaiting D and D, and various types of wastes waiting for processing or disposal. This scope of work for the PRISM process and the development of a dynamic simulation model are a logical extension of the GoldSim simulation software used by the OCRWM to assess the long-term performance for the Yucca Mountain Project and by NNSA to assess project risk at its sites. Systems integration modeling will promote better understanding of all project risks, technical and nontechnical, and more defensible decision-making for complex projects with significant uncertainties. It can provide effective visual communication and rapid adaptation during interactions with stakeholders (Administration, Congress, State, Local, and NGO). It will also allow rapid assessment of alternative management approaches. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Audit Report on "The Department of Energy's Opportunity for Energy Savings Through the Use of Setbacks in its Facilities"

Our testing at Office of Science and National Nuclear Security Administration facilities revealed that the Department either did not use or failed to properly maintain setback systems and equipment in a number of instances. At just the four sites we visited, the Department had not ensured that setback conservation methods were used for 35 of the 55 (approximately 64 percent) owned or leased buildings included in our review. The buildings that did not use setbacks capabilities to control energy consumption comprised over one million square feet of space. Specifically: Although in place or capable of being deployed, officials did not utilize setbacks in 20 separate buildings; and, Equipment in 15 other buildings had either never been enabled or had deteriorated and was no longer functional, thus making setbacks impossible. Typical of the problems we noted, the Y-12 National Security Complex recently leased two buildings that were constructed with setback capability. The property manager for these buildings told us that the setback equipment was not used because the owner of the properties had not purchased the software necessary to enable the capability. In another case, we learned that Los Alamos National Laboratory was not using the setback capability in two buildings because facility operators and tenants had not been trained on operating the setback control system. Finally, the Oak Ridge National Laboratory lost the ability to operate the setback equipment in two buildings when the electronic control system failed in 2008. Laboratory officials told us that they elected not to replace it because they planned to implement campus-wide energy conservation measures in the future. In spite of its energy conservation leadership role, we found that the Department and its facility contractors did not place adequate emphasis on reducing energy consumption through the application of setbacks. Of particular significance, we found that the Department had not always required the operation of setback capabilities in building lease agreements. This was especially troubling given the expanded use of leased space to house Departmental operations. Despite discussions with several Federal and contractor officials, we could not obtain what we considered to be a satisfactory explanation as to why the Department failed to take advantage of this conservation practice, one that is generally low cost and has limited, if any, adverse impact on operations or building occupants. Consistent with the lack of emphasis in this area, we noted that the Department had not required the four contractors included in our review to develop training requirements or energy policies and procedures governing the use of setback capabilities. Energy consumption reduction goals related to setbacks had also not been established to help incentivize contractor performance in this important area. With nearly $300 million in annual utility costs, the Department could realize significant savings by using setbacks in its buildings. We estimate that the Department could save over $11.5 million in annual utility costs. We developed the estimate based on the observation that approximately 64 percent of the facilities included in our review had not used setbacks. We then conservatively applied a 15 percent energy consumption savings estimate observed by Sandia National Laboratory and savings estimates contained in a study conducted by Pacific Northwest National Laboratory to the 40 percent of utility costs generally recognized as resulting from HVAC operation. Such savings could be used to fund high priority programs and install additional energy saving features. The consumption savings would be, at today's average residential electricity cost, sufficient to power over 9,800 homes each year. We recognize that while setbacks can be used in many situations, they are not appropriate for facilities that are continuously operated or those that house delicate equipment that depend on constant temperatures. However, during the course of our audit officials at four of the sites included in our review told us that they recognized the utility of using setbacks for most facilities. At two sites, implementation efforts began almost immediately after we briefed officials on our findings. We also noted that Department Headquarters facilities used setbacks in offices and many common areas. With over 9,000 buildings in its inventory, the consistent use of setbacks can help the Department significantly reduce its energy consumption and, as noted above, achieve substantial cost savings. Actions related to setbacks that officials began after we initiated our audit are noteworthy and should, if fully implemented, help further reduce energy consumption. However, additional action at sites across the complex is necessary to maximize energy efficient operations and to establish the Department as the leader in this effort in all of the Federal sector.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Implementation of ANL’s Mechanics Based Evolutionary Fatigue Modeling Through ABAQUS-WARP3D Based High-Performance Computing Framework

This report presents an update on the environmental fatigue research that is being conducted at Argonne National Laboratory in support of the Department of Energy’s Light Water Reactor Sustainability (LWRS) program. Argonne is developing a fully mechanistic fatigue evaluation approach without using empirical fatigue (S~N) curves. This approach is based on the fundamental concept of the time evolution of progressive fatigue damage rather than on the conventional S~N curve approaches using end-of-life data. In FY 2017, we performed extensive validation of this approach with respect to fatigue test data for 316 stainless steel [1]. This validation was performed for different loading cases, including constant, variable, and random amplitude. In the present FY 2018 semi-annual report, we present the further advances of Argonne’s environmental fatigue research work in the context for more practical applications. In this report, we discuss a methodology for fully mechanistic (i.e., not using S~N curves) fatigue life evaluation of reactor components subjected to realistic loading cycles, namely, design-basis loading cycles. The loading cycles include plant heat-up, full-power, and cool-down operations. As a test case, we considered a typical pressurized water reactor surge line, which is made of 316 SS. To perform the fatigue simulation for thousands of fatigue cycles in a computationally cost effective way, we modified our previous desktop-based finite element (FE) modeling approach to work in a high-performance computing (HPC) framework. For the HPC implementation, we developed a hybrid framework based on commercial FE software (ABAQUS), open-source FE software (WARP3D), and Argonne-developed evolutionary cyclic-plasticity modeling methods. We validated this HPC-based cycle-by-cycle damage model for the entire fatigue life of a Pressurized Water Reactor (PWR) surge line (SL) pipe with respect to assumed loading cycles. The simulated fatigue life was found to be 5855 cycles, which is 85% accurate as compared to the corresponding small-specimen-based experimental fatigue life (6914 cycles). Also, the simulated stress history captures the cyclic hardening and softening behavior of the material for entire fatigue cycles. The FE simulation of the PWR SL pipe was conducted in a reasonable time of 12.5 days. These results show the promise that a fully mechanistic (not using S~N curves) fatigue life evaluation of a safety-critical nuclear reactor component (or even other safety critical components like those in aircraft, aero-engines, etc.) is possible. We anticipate that this type of methodology will drastically reduce the uncertainly associated with conventional fatigue life estimates based on empirical S~N curves. We also proposed an FE model that is based on a hybrid full-component and single-element approach and that can readily be used by industry if HPC resources are not available. In this approach, a single-cycle FE simulation has to be performed first for the required loading cycle. Then, the resulting strain/stress profile at the hotspot (highest strain/stress location) is used as input strain/stress loading to the single-element FE model. The single-element FE model is run under multiple fatigue cycles as long as the failure criteria are achieved. The cycle number at failure gives the fatigue life of the component in question. This cost-effective framework does not require expensive HPC hardware and can be performed in a reasonable time by using a desktop computer. We demonstrated this approach with respect to PWR SL fatigue evaluation under two realistic design-basis loading cycles (simple and detailed). The associated results were validated with respect to test data obtained through fatigue testing of uniaxial specimens under the in-air condition at 300 °C. The approach is in the development stage and requires further improvement and validation.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗