Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “small projects”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Small Project Rapid Integration and Test Environment (SPRITE) An Innovation Space for Small Projects Design, Development, Integration, and Test

Over the past few years interest in the development and use of small satellites has rapidly gained momentum with universities, commercial, and government organizations. In a few years we may see networked clusters of dozens or even hundreds of small, cheap, easily replaceable satellites working together in place of the large, expensive and difficult-to-replace satellites now in orbit. Standards based satellite buses and deployment mechanisms, such as the CubeSat and Poly Pico-satellite Orbital Deployer (P-POD), have stimulated growth in this area. The use of small satellites is also proving to be a cost effective capability in many areas traditionally dominated by large satellites, though many challenges remain. Currently many of these small satellites undergo very little testing prior to flight. As these small satellites move from technology demonstration and student projects toward more complex operational assets, it is expected that the standards for verification and validation will increase.

Lee, Ashley↗

Small Projects Rapid Integration and Test Environment (SPRITE): Application for Increasing Robustness

Marshall Space Flight Center's (MSFC) Small Projects Rapid Integration and Test Environment (SPRITE) is a Hardware-In-The-Loop (HWIL) facility that provides rapid development, integration, and testing capabilities for small projects (CubeSats, payloads, spacecraft, and launch vehicles). This facility environment focuses on efficient processes and modular design to support rapid prototyping, integration, testing and verification of small projects at an affordable cost, especially compared to larger type HWIL facilities. SPRITE (Figure 1) consists of a "core" capability or "plant" simulation platform utilizing a graphical programming environment capable of being rapidly re-configured for any potential test article's space environments, as well as a standard set of interfaces (i.e. Mil-Std 1553, Serial, Analog, Digital, etc.). SPRITE also allows this level of interface testing of components and subsystems very early in a program, thereby reducing program risk.

Rakoczy, John↗

Energy Savings Performance Contracting for Small Projects

Energy Savings Performance Contracting (ESPC) is a budget-neutral approach to make building improvements that reduce energy and water use and increase operational efficiency. ESPC can help public-sector planners use tomorrow’s energy savings to fund today's facility and infrastructure upgrades. This resource highlights strategies and case studies for implementing ESPC in smaller towns, rural counties, and small school districts to complete energy upgrades and maximize energy and cost savings.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Small Projects Rapid Integration and Test Environment (SPRITE): Application for Increasing Robutness

Over the past few years interest in the development and use of small satellites has rapidly gained momentum with universities, commercial, and government organizations. In a few years we may see networked clusters of dozens or even hundreds of small, cheap, easily replaceable satellites working together in place of the large, expensive and difficult-to-replace satellites now in orbit. Standards based satellite buses and deployment mechanisms, such as the CubeSat and Poly Pico-satellite Orbital Deployer (P-POD), have stimulated growth in this area. The use of small satellites is also proving to be a cost effective capability in many areas traditionally dominated by large satellites, though many challenges remain. Currently many of these small satellites undergo very little testing prior to flight. As these small satellites move from technology demonstration and student projects toward more complex operational assets, it is expected that the standards for verification and validation will increase.

Lee, Ashley↗

Clean Cities and Communities Small Project Funding

The presentation will address the varied and diverse ways that NLR provides DOE funding to support Clean Cities and Communities coalition projects. This includes three project approaches: Jumpstart funding, Coalition Building, and Energy to Communities (E2C).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

ASK Magazine

Academy of Program and Project Leadership (APPL) and ASK Magazine helps NASA managers and project teams accomplish today's missions and meet tomorrow's challenges by providing performance enhancement services and tools, supporting career development programs, sponsoring knowledge sharing events and publications, and creating opportunities for project management collaboration with universities, professional associations, industry partners, and other government agencies. ASK Magazine grew out of APPL's Knowledge Sharing Initiative. The stories that appear in ASK are written by the best of the best project managers, primarily from NASA, but also from other government agencies and industry. These stories contain genuine nuggets of knowledge and wisdom that are transferable across projects. Who better than a project manager to help another project manager address a critical issue on a project? Big projects, small projects - they're all here in ASK. Please direct all inquiries about ASK Magazine editorial policy to Todd Post, EduTech Ltd., 8455 Colesville Rd., Suite 930, Silver Spring, MD 20910, (301) 585-1030; or email to tpost@edutechltd.com.

Laufer, Alexander↗

Managing Small Spacecraft Projects: Less is Not Easier

Managing small, low cost missions (class C or D) is not necessarily easier than managing a full flagship mission. Yet, small missions are typically considered easier to manage and used as a training ground for developing the next generation of project managers. While limited resources can be a problem for small missions, in reality most of the issues inherent in managing small projects are not the direct result of limited resources. Instead, problems encountered by managers of small spacecraft missions often derive from 1) the perception that managing small projects is easier if something is easier it needs less rigor and formality in execution, 2) the perception that limited resources necessitate or validate omitting standard management practices, 3) less stringent or unclear guidelines or policies for small projects, and 4) stakeholder expectations that are not consistent with the size and nature of the project. For example, the size of a project is sometimes used to justify not building a full, detailed integrated master schedule. However, while a small schedule slip may not be a problem for a large mission, it can indicate a serious problem for a small mission with a short development phase, highlighting the importance of the schedule for early identification of potential issues. Likewise, stakeholders may accept a higher risk posture early in the definition of a low-cost mission, but as launch approaches this acceptance may change. This presentation discusses these common misconceptions about managing small, low cost missions, the problems that can result, and possible solutions.

Barley, Bryan↗

Small Unmanned Aerial System (UAS) Flight Testing of Enabling Vehicle Technologies for the UAS Traffic Management Project

Small unmanned aerial systems (sUAS) have been studied and results indicate that there is a large array of highly-beneficial applications. These applications are too numerous to list, but include search and rescue, fire spotting, precision agriculture, etc. to name a few. Typically sUAS vehicles weigh less than 55 pounds and will be performing flight operations in the presence of manned aircraft and other sUAS. Certain sUAS applications, such as package delivery, will include operations in the close proximity of the general public. The full benefit from sUAS is contingent upon the resolution of several technological areas to enable free and widespread use of these vehicles. Technological areas in question include, but are not limited to: autonomous sense and avoid and deconfliction of sUAS from other sUAS and manned aircraft, communications and interfaces between the vehicle and human operators, and high-reliability autonomous systems. The NASA UAS Traffic Management (UTM) project is endeavoring to develop a traffic management system and concept of operations for these types of vehicles. An extensive sUAS flight test effort was performed to partially address vehicle-related technological areas and to shape an understanding of future developmental and test efforts for vehicles intended to use the UTM traffic management system. The flight testing described herein had the following objectives: 1) Install and test Dedicated Short Range Communications (DSRC) systems developed for the automotive industry for potential sense and avoid sUAS applications; 2) Evaluate the use of cellular 4G systems to provide vehicle control; 3) Obtain high-resolution video imagery in support of image-based optical detection sense and avoid systems; 4) Acquire data in fixed-wing flight to support validation and maturation of an autonomous range containment system known as Safeguard in fixed-wing flight. A total of 53 flights were performed over 12 operational days at Beaver Dam Airpark in Elberon, VA. This work was sponsored by the UTM project that is part of the Aviation Operations and Safety Program (AOSP) at NASA.

Glaab, Louis J.↗

ASK Magazine

The Academy of Program and Project Leadership (APPL) and ASK Magazine is presented. APPL is a research-based organization that serves NASA program and project managers, as well as project teams, at every level of development. In 1997, APPL was created from an earlier program to underscore the importance that NASA places on project management and project teams through a wide variety of products and services, including knowledge sharing, classroom and online courses, career development guidance, performance support, university partnerships, and advanced technology tools. ASK Magazine grew out of our Knowledge Sharing Initiative. The stories that appear in ASK are written by the 'best of the best' project managers, primarily from NASA, but also from other government agencies and industry. These stories contain genuine nuggets of knowledge and wisdom that are transferable across projects. Who better than a project manager to help another project manager address a critical issue on a project? Big projects, small projects-they're all here in ASK. APPL is one of our most exciting publications about project management.

Edward Hoffman↗

ASK Magazine

Welcome to the Academy of Program and Project Leadership (APPL) and ASK Magazine. APPL helps NASA managers and project teams accomplish today's missions and meet tomorrow's challenges by providing performance enhancement services and tools, supporting career development programs, sponsoring knowledge sharing events and publications, and creating opportunities for project management collaboration with universities, professional associations, industry partners and other government agencies. ASK Magazine grew out of APPL's Knowledge Sharing Initiative. The stories that appear in ASK are written by the 'best of the best' project managers, primarily from NASA, but also from other government agencies and industry. These stories contain genuine nuggets of knowledge and wisdom that are transferable across projects. Who better than a project manager to help another project manager address a critical issue on a project? Big projects, smaLl projects-they're ali here in ASK. Stories in this issue include: Earthly Considerations on Mars, Getting Politically Active, Stumping for the Project, Grins & Giggles: The Launch Pad to High Performance, Transfer Wisdom Workshops: Coming to a NASA Center Near You, Project Management: The Television Show, Lessons Learned Again and Again and Again, Implementation Reviews, ASK Talks with Dr. Michael Hecht, and What Is This Fourth Dimension?.

Laufer, Alexander↗

Shuttle Small Payloads Project Office: Overview

This viewgraph presentation gives an overview of the Shuttle Small Payload Project Office activities. Information is given on the Hitchhiker and Hitchhiker-Junior programs, the Get Away Special program, space experiment module program, program costs, and future enhancements.

Dunker, S. Chris↗

NASA Software Engineering Benchmarking Study

To identify best practices for the improvement of software engineering on projects, NASA's Offices of Chief Engineer (OCE) and Safety and Mission Assurance (OSMA) formed a team led by Heather Rarick and Sally Godfrey to conduct this benchmarking study. The primary goals of the study are to identify best practices that: Improve the management and technical development of software intensive systems; Have a track record of successful deployment by aerospace industries, universities [including research and development (R&D) laboratories], and defense services, as well as NASA's own component Centers; and Identify candidate solutions for NASA's software issues. Beginning in the late fall of 2010, focus topics were chosen and interview questions were developed, based on the NASA top software challenges. Between February 2011 and November 2011, the Benchmark Team interviewed a total of 18 organizations, consisting of five NASA Centers, five industry organizations, four defense services organizations, and four university or university R and D laboratory organizations. A software assurance representative also participated in each of the interviews to focus on assurance and software safety best practices. Interviewees provided a wealth of information on each topic area that included: software policy, software acquisition, software assurance, testing, training, maintaining rigor in small projects, metrics, and use of the Capability Maturity Model Integration (CMMI) framework, as well as a number of special topics that came up in the discussions. NASA's software engineering practices compared favorably with the external organizations in most benchmark areas, but in every topic, there were ways in which NASA could improve its practices. Compared to defense services organizations and some of the industry organizations, one of NASA's notable weaknesses involved communication with contractors regarding its policies and requirements for acquired software. One of NASA's strengths was its software assurance practices, which seemed to rate well in comparison to the other organizational groups and also seemed to include a larger scope of activities. An unexpected benefit of the software benchmarking study was the identification of many opportunities for collaboration in areas including metrics, training, sharing of CMMI experiences and resources such as instructors and CMMI Lead Appraisers, and even sharing of assets such as documented processes. A further unexpected benefit of the study was the feedback on NASA practices that was received from some of the organizations interviewed. From that feedback, other potential areas where NASA could improve were highlighted, such as accuracy of software cost estimation and budgetary practices. The detailed report contains discussion of the practices noted in each of the topic areas, as well as a summary of observations and recommendations from each of the topic areas. The resulting 24 recommendations from the topic areas were then consolidated to eliminate duplication and culled into a set of 14 suggested actionable recommendations. This final set of actionable recommendations, listed below, are items that can be implemented to improve NASA's software engineering practices and to help address many of the items that were listed in the NASA top software engineering issues. 1. Develop and implement standard contract language for software procurements. 2. Advance accurate and trusted software cost estimates for both procured and in-house software and improve the capture of actual cost data to facilitate further improvements. 3. Establish a consistent set of objectives and expectations, specifically types of metrics at the Agency level, so key trends and models can be identified and used to continuously improve software processes and each software development effort. 4. Maintain the CMMI Maturity Level requirement for critical NASA projects and use CMMI to measure organizations developing software for NASA. 5.onsolidate, collect and, if needed, develop common processes principles and other assets across the Agency in order to provide more consistency in software development and acquisition practices and to reduce the overall cost of maintaining or increasing current NASA CMMI maturity levels. 6. Provide additional support for small projects that includes: (a) guidance for appropriate tailoring of requirements for small projects, (b) availability of suitable tools, including support tool set-up and training, and (c) training for small project personnel, assurance personnel and technical authorities on the acceptable options for tailoring requirements and performing assurance on small projects. 7. Develop software training classes for the more experienced software engineers using on-line training, videos, or small separate modules of training that can be accommodated as needed throughout a project. 8. Create guidelines to structure non-classroom training opportunities such as mentoring, peer reviews, lessons learned sessions, and on-the-job training. 9. Develop a set of predictive software defect data and a process for assessing software testing metric data against it. 10. Assess Agency-wide licenses for commonly used software tools. 11. Fill the knowledge gap in common software engineering practices for new hires and co-ops.12. Work through the Science, Technology, Engineering and Mathematics (STEM) program with universities in strengthening education in the use of common software engineering practices and standards. 13. Follow up this benchmark study with a deeper look into what both internal and external organizations perceive as the scope of software assurance, the value they expect to obtain from it, and the shortcomings they experience in the current practice. 14. Continue interactions with external software engineering environment through collaborations, knowledge sharing, and benchmarking.

Rarick, Heather L.↗

Current Status of NASA's Fission Surface Power Project

Small nuclear fission systems are powerful and could enable robust space operations for planetary habitation and exploration. On Earth, unless disrupted by storms or grid problems, electrical power for most people is no further than an outlet away. However, the solar system does not provide such easy access to electricity as we know it. Astronauts could take advantage of a reliable power supply to explore both the Moon and Mars. The system will need to be lightweight and capable of running regardless of its location, the weather, or available sunlight and other natural resources. NASA’s Fission Surface Power (FSP) project expands on the efforts of the agency’s Kilopower project, which ended in 2018. Currently, NASA is working with the US Department of Energy and industry to design a fission power system that would provide at least 40 kilowatts of power – enough to continuously run 30 households for ten years. A future lunar demonstration will pave the way for sustainable operations and even base camps on the Moon and Mars. This manuscript will showcase the current state of the FSP project, technical goals and accomplishments, future plans, and how this technology paves the way for exciting future applications.

Nuclear↗

Simple Wins: Driving Effective Implementation of Energy Efficiency Projects

Small- and medium-sized manufacturers (SMMs) in the United States, making up over 98% of manufacturing firms, account for 48.3% of the sector’s energy consumption. Despite access to energy assessments and technical resources, such as those from the US Department of Energy’s Better Plants program and Industrial Training and Assessment Centers, implementation rates for identified energy-saving measures remain lower than expectations, averaging 47%. Some barriers were identified by other researchers as limited workforce capacity, inadequate training, and time constraints hinder progress. This article studied the development of customized checklists together with the energy assessment report as a practical solution to improve implementation rates for energy efficiency projects among SMMs. The framework for the checklists was grounded in five principles: short, precise, actionable, relevant, and codeveloped (SPARC). A case study of a 500,000-squarefoot SMM demonstrates how tailored checklists targeting significant energy users—such as heating, ventilating and air conditioning (HVAC), lighting, and compressed air systems for this facility—can simplify the process for staff to do facility walkthroughs to monitor best practices and track the progress of energy efficiency project implementation.

Guo, Wei [Oak Ridge National Laboratory (ORNL), Oa↗

JPL - Small Power Systems Applications Project

The Small Power Systems Applications (SPSA) Project has been established to develop and commercialize small solar thermal power plants. The technologies of interest include all distributed and central receiver technologies which are potentially economically viable in power plant sizes of one to 10 MWe. The paper presents an overview of the SPSA Project and briefly discusses electric utility involvement in the Project.

Ferber, R. R.↗

Space research - At a crossroads

Efforts which must be expended if U.S. space research is to regain vitality in the next few years are discussed. Small-scale programs are the cornerstone for big science projects, giving both researchers and students a chance to practice the development of space missions and hardware and identify promising goals for larger projects. Small projects can be carried aloft by balloons, sounding rockets, the Shuttle and ELVs. It is recommended that NASA continue the development of remote sensing systems, and join with other government agencies to fund space-based materials science, space biology and medical research. Increased international cooperation in space projects is necessary for affording moderate to large scale missions, for political reasons, and to maximize available space resources. Finally, the establishment and funding of long-range goals in space, particularly the development of the infrastructure and technologies for the exploration and colonization of the planets, must be viewed as the normal outgrowth of the capabilities being developed for LEO operations.

Mcdonald, Frank B.↗

Tailoring Systems Engineering Projects for Small Satellite Missions

NASA maintains excellence in its spaceflight systems by utilizing rigorous engineering processes based on over 50 years of experience. The NASA systems engineering process for flight projects described in NPR 7120.5E was initially developed for major flight projects. The design and development of low-cost small satellite systems does not entail the financial and risk consequences traditionally associated with spaceflight projects. Consequently, an approach is offered to tailoring of the processes such that the small satellite missions will benefit from the engineering rigor without overly burdensome overhead. In this paper we will outline the approaches to tailoring the standard processes for these small missions and describe how it will be applied in a proposed small satellite mission.

Horan, Stephen↗

Fast Track Study

The NASA Fast Track Study supports the efforts of a Special Study Group (SSG) made up of members of the Advanced Project Management Class number 23 (APM-23) that met at the Wallops Island Management Education Center from April 28 - May 8, 1996. Members of the Class expressed interest to Mr. Vem Weyers in having an input to the NASA Policy Document (NPD) 7120.4, that will replace NASA Management Institute (NMI) 7120.4, and the NASA Program/Project Management Guide. The APM-23 SSG was tasked with assisting in development of NASA policy on managing Fast Track Projects, defined as small projects under $150 million and completed within three years. 'Me approach of the APM-23 SSG was to gather data on successful projects working in a 'Better, Faster, Cheaper' environment, within and outside of NASA and develop the Fast Track Project section of the NASA Program/Project Management Guide. Fourteen interviews and four other data gathering efforts were conducted by the SSG, and 16 were conducted by Strategic Resources, Inc. (SRI), including five interviews at the Jet Propulsion Laboratory (JPL) and one at the Applied Physics Laboratory (APL). The interviews were compiled and analyzed for techniques and approaches commonly used to meet severe cost and schedule constraints.

Source record↗