Engineering PapersSearch

SEARCH · Engineering Papers

Results for “small hydropower”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Small Hydropower Plant Response Improvement Using Energy Storage

Small hydropower plants contribute significantly to global power generation. However, due to limited storage, these can have low ramping capacity and poor load-frequency regulation. These can prevent small hydropower plants from being used in isolated grids as backup power to critical loads and rural areas. In this paper, a control architecture for frequency control is proposed that facilitates the use of energy storage to improve the response of standalone small hydropower plants. The frequency controller generates power commands using proportional control on frequency deviation and a user-defined power setpoint, and this incorporates with a current controller that facilitates power injection. The distinctive feature of the controller design is that it takes into account frequency thresholds and storage constraints to enable power injections, and it provides the capability to perform automated and manual recharge of the energy storage. Simulations using detailed nonlinear models demonstrate the improved performance of the hydropower with energy storage using the proposed controller. Automated and manual recharge and the impact of the energy storage constraints on the performance of the hydropower plant are demonstrated.

13 HYDRO ENERGY

Valued peaks: Sustainable water allocation for small hydropower plants in an era of explicit ecological needs

Optimizing hydropower operations to balance economic profitability and support functioning ecosystem services is integral to river management policy. In this article, we propose a dynamic, constrained optimization framework for small hydropower plants (SHPs) to evaluate trade-offs between economic profitability and socio-ecological requirements. Specifically, we examine the balance between short-term losses in hydropower generation and the potential for compensatory benefits in the form of revenue from recreational ecosystem services, irrespective of the direct beneficiary. Our framework integrates a fish habitat model, a hydropower optimization model, and a recreational ecosystem service estimate to evaluate different environmental flow scenarios. The optimization process gives three outflow release scenarios, informed by previous streamflow realisations (dam inflow), and designed environmental flow constraints. The framework is applied and tested for the river Kuusinkijoki in North-eastern Finland, which is a habitat for migratory brown trout and grayling populations. We show that the revenue loss due to the environmental flow constraints arises through a reduction in revenue per generated energy unit and through a reduction in turbine efficiency. Additionally, the simulation results reveal that all the designed environmental flow constraints cannot be met simultaneously. Under the environmental flow scenario with both minimum flow and flow ramping rate constraints, the annual hydropower revenue decreases by 16.5 %. An annual increase of 8 % in recreational fishing visits offsets the revenue loss. In conclusion, the developed framework provides knowledge of the costs and benefits of hydropower environmental flow constraints and guides the prioritizing process of environmental measures.

13 HYDRO ENERGY

Small Hydropower Energy for USDA REAP [Slides]

This presentation informs U.S. Department of Agriculture (USDA) staff on hydropower technologies which can provide clean energy for agricultural producers and rural small business owners.

13 HYDRO ENERGY

Full-scale validation gaps and opportunities for low-head hydropower: a review and perspective

Hydropower is undergoing technological innovation as future development increasingly targets low-head sites (<10 m), primarily through retrofits, rehabilitation, and upgrades of existing infrastructure. This shift toward smaller systems creates a timely opportunity: unlike conventional large projects, many emerging low-head technologies may be small enough for direct full-scale validation. Full-scale testing is particularly important for environmental mitigation technologies, including fish passage, sediment continuity, and water-quality improvements, whose performance is difficult to assess reliably using reduced-scale models. Yet adoption remains constrained by the limited risk-bearing capacity of small hydropower owners, discouraging manufacturers from bringing unvalidated technologies to market. This review and perspective paper examines hydropower trends driving innovation, selected emerging technologies, conventional testing methods, and current U.S. testing capabilities as a case study. We then evaluate the gap between existing capabilities and the needs of low-head powertrains and environmental mitigation measures. Many technologies exceed existing facility flow capacities; in the U.S., the highest combined head–flow capability is limited to 5.66 m3/s, compared with median and 90th-percentile low-head turbine-unit flows of 14.3 and 60 m3/s. To mitigate this gap, we advocate repurposing large, retired, or underused hydraulic infrastructure as full-scale testing facilities to reduce first-adoption risk and support sustainable low-head hydropower deployment.

Tseng, Chien-Yung [Colorado State University, Fort

Energy 101: Hydropower [Slides]

The Energy 101: Hydropower presentation, developed for the Energy Technology Innovation Partnership Project (ETIPP), provides an overview of hydropower energy. It covers fundamental concepts, technologies, considerations, case studies, and additional resources.

13 HYDRO ENERGY

Annual Technology Baseline: The 2024 Electricity Update

Consistent cost and performance data for various electricity generation technologies can be difficult to find and may change frequently for certain technologies. With the Annual Technology Baseline (ATB), the National Renewable Energy Laboratory annually provides an organized and centralized set of such cost and performance data. The ATB uses the best information from the Department of Energy national laboratories' energy analysts. The ATB has been reviewed by experts and it includes the following electricity generation and storage technologies: land-based wind, offshore wind, distributed wind, utility-scale solar photovoltaics (PV), commercial-scale solar PV, residential-scale solar PV, concentrating solar power, geothermal power, hydropower, utility-scale battery storage, commercial battery storage, residential battery storage, pumped storage hydropower, nuclear, coal, and natural gas. EIA data for conventional biopower are included for reference. This webinar presentation introduces the 2024 update to the ATB Electricity data and documentation.

battery storage

Regional Power System Black Start with Run-of-river Hydropower Plant and Battery Energy Storage

Battery energy storage systems (BESSs) are an important asset for power systems with high integration levels of renewable energy, and they can be controlled to provide various critical services to the power grid. This paper presents the real-world experience of using a megawatt-scale BESS with grid-following (GFL) and grid-forming (GFM) controls and a run-of-river (ROR) hydropower plant to restore a regional power system. To demonstrate this, we carry out power-hardware-in-the-loop experiments integrating an actual GFL- or GFM-controlled BESS and a load bank. Both the simulation and experimental results presented in this paper show the different roles of GFL- or GFM-controlled BESS in power system black starts. The results provide further insight for system operators on how GFL- or GFM-controlled BESS can enhance grid stability and how an ROR hydropower plant can be converted into a black-start-capable unit with the support of a small-capacity BESS. The results show that an ROR hydropower plant combined with a BESS has the potential of becoming one of enabling elements to perform bottom-up black-start schemes as opposed to conventional bottom-down method, thus enhancing the system resiliency and robustness.

24 POWER TRANSMISSION AND DISTRIBUTION

Intersection of Hydrologic Change and Hydropower in the United States: Needs for Future Research and Practice

Hydropower is crucial for electric‐grid stability in the context of variable renewables but faces threats from changing hydrology. Here, we summarize the state of the science at the intersection of hydropower operations and planning, hydrologic science, and climate. We focus on the United States, outlining research, development, and training needs. Key knowledge gaps include the risk that intensification of compound extreme events poses to future generation, as well as uncertainties surrounding greenhouse gas emissions from hydropower reservoirs with relevance to hydropower's role in energy decarbonization. Quantifying such impacts and reducing uncertainty are critical where possible, but remaining irreducible or deep uncertainty will require new approaches. Future monitoring and modeling methods must provide a better understanding of the complexity inherent in large watersheds that is critical to managing both hydropower and watersheds in the context of hydrologic change. Yet, research and development will have little impact if they do not inform practice. Standardization and consolidation of platforms are essential for data, modeling, and tool translation to local scales and small operators. An enhanced industry‐academia dialog is pivotal for fostering a robust pipeline of hydropower professionals. Collaboration among researchers, policymakers, authorities, and industry stakeholders emerges as a recurring theme, highlighting the imperative for collective efforts.

13 HYDRO ENERGY

Limiter-aware adaptive excitation control for hydropower generators with legacy voltage regulation systems

Hydropower units often rely on legacy excitation systems with fixed automatic voltage regulator (AVR) settings, but parameter drift, changing operating conditions, and evolving grid-service demands can degrade terminal-voltage regulation over time. This problem should be addressed because poor voltage regulation affects reactive-power support, system stability, and reliable plant operation, and replacing installed AVR and limiter logic is costly and disruptive in practice. To address this issue, this paper proposes a retrofit-friendly enhancement for hydropower generator excitation systems that combines adaptive tuning of the AVR middle lead–lag branch with a small proportional-integral correction for removing steady bias and slow drift. The adaptive laws are normalized, projection-bounded, and equipped with leakage, while adaptation is enabled only in the middle branch. Thus, the intent of the underexcitation and overexcitation limiters, as well as legacy current and rate limits, remains unchanged. Stability is analyzed under incremental performance assumptions, yielding boundedness and asymptotic tracking in the absence of saturation. The method is evaluated using real operational data from a utility-scale hydropower unit at Rocky Reach Dam, Unit C-8. Compared with the fixed AVR baseline, the proposed method reduces terminal-voltage mean squared error by about 70%, removes long periods of steady-state bias, and improves transient tracking while coexisting with limiter actions. These results show that substantial voltage-control improvement can be achieved on existing hydropower units with minimal integration effort and without replacing the installed AVR structure.

ESST5B model

The Hydropower Game: An Interactive Learning Tool for the Future Hydropower Workforce

This report documents a Seedling project supported by the U.S. Department of Energy (DOE) Water Power Technologies Office (WPTO), conducted by Argonne National Laboratory (ANL) and the National Laboratory of the Rockies (NLR). The Seedling and Sapling Program provides small grants over short duration to enable early-stage research at national laboratories. This funding mechanism is intended to cultivate innovative ideas and expand research road maps in hydropower and marine energy technologies. Under this Seedling award, the project team developed an educational outreach tool, or “serious game”, built in Python and powered by the Pygame library, aimed at teaching fundamental hydropower concepts through an engaging, interactive learning experience. The game features multiple lessons covering several hydropower topics while allowing for expansion and customization in the instance of future funding availability: • Hydropower Plant Types: Players explore and compare the mechanics and applications of run-of-river, dam hydropower, and pumped-storage hydropower. • Flow Dynamics and Power Generation: Interactive tasks demonstrate how release rate and hydraulic head combine to determine power output. • Grid Operations and Load Following: Simulations illustrate how hydropower facilities respond to fluctuating electricity demand to balance the grid. • Market Integration: Levels scaffold understanding of how hydropower interfaces with the broader energy market, including operational and economic considerations. The tool was showcased at several science, technology, engineering, and mathematics (STEM) outreach events, where it was demoed to students, educators, and the general public. These events provided valuable opportunities to collect feedback on the gameplay, storyline, and educational objectives from a wide audience. The game was presented at STEMapalooza, Introduce a Girl to Engineering Day, STEMCON, and Clean Currents 2025. Insights gathered during these demonstrations informed refinements to the game’s user experience and strengthened its effectiveness as an educational tool for teaching hydropower concepts. This report outlines the game’s design philosophy, educational objectives, technical implementation, user experience insights, and potential for broader deployment within educational and workforce development contexts. It emphasizes how gamified learning can demystify complex hydropower science and inspire interest in water-power technologies. The project’s success demonstrates the value of Seedling funding in fostering creative, lowcost educational tools that support DOE’s mission to advance energy literacy and innovation. The report concludes with recommendations for expanding the tool by adding new levels, integrating assessment metrics, and exploring commercialization or deployment pathways through future Sapling funding. The official webpage of the Hydropower Game, which includes a link to the educational tool, can be accessed at www.anl.gov/hydropower/hydropower-game.

13 HYDRO ENERGY

Mitigating the Effect of Wind Gusts on Local Run-of-River Hydropower Plants Using Cooperative Control

This paper focuses on the challenges and solutions associated with the integration of wind farms in a hydro- dominated power system. Due to sudden increases in wind power, the system frequency can increase, causing excessive reduction in the run-of-river (ROR) system’s power. Considering their small pondage, this can result in damage to the physical structure due to water level violations which are also penalized by stakeholders. To prevent excessive ROR power deviations, ROR governor wear and tear, and to prevent tie-line deviations, a centralized, distributed, and hybrid scheme for coordinating the response from a cluster of ROR plants is examined. Both centralized and distributed control as well as their hybrids can reduce frequency peaks. However, the inclusion of decentralized cooperative controls leads to reduced governor actions from fast- acting plants while enhancing net response from the hydro unit cluster.

13 HYDRO ENERGY

In-Conduit Hydropower for Public Water Supply Systems: Development Challenges and Costs

Conduit hydropower leverages existing water infrastructure to provide energy solutions, though deployment has been slow. A 2022 US Department of Energy (DOE)–funded report led by Oak Ridge National Laboratory (ORNL) summarizes a reconnaissance-level study of hydropower potential at national conduits (Kao et al., 2022). The report includes power and energy estimates across three major sectors of conduit hydropower potential: municipal, agricultural, and industrial. Water resources include public water supply systems (municipal and industrial), irrigation canal systems (agricultural), thermoelectric cooling systems (industrial), and wastewater systems (municipal and industrial). In total, 1.41 GW of power potential was estimated nationwide. Subsequently, DOE has funded ORNL through the Conduit Hydropower Engineering, Evaluation, and Technology Acceleration project (CHEETA) to improve deployment potential for conduit hydropower. Work thus far has focused on “in-conduit” hydropower (ICH)—or “in-pipe” hydropower—for public water supply systems, though the project is planning to cover conduit hydropower more broadly. The timeline of ORNL’s conduit hydropower related research and development (R&D) is shown in Figure 1. The results of CHEETA should benefit the hydropower industry by providing insights into costs, barriers, and other considerations that impact project development. The hydropower industry and municipal/industrial conduit stakeholders will use the output to inform development decisions and advance low-impact hydropower growth in the US.

13 HYDRO ENERGY

An Assessment of Technical Hydropower Potential at Non-Powered Dams in the United States

Historically, dams have been constructed for a variety of purposes, such as providing a more secure and reliable water supply, mitigating impacts from variations in river flow, allowing continuous navigability, and harnessing mechanical power. A relatively small portion of dams have been designed to store or regulate flows for the purpose of generating electricity (roughly 3% of nationally inventoried dams in the US and 17% of the dams included in the World Register of Dams). The remaining population of existing non-powered dams (NPDs) presents both an opportunity to generate renewable energy and a need to modernize aging infrastructure. This report describes an assessment of more than 2,600 NPDs in the US that have a collective potential of nearly 4 GW in new power capacity. Previous national-scale assessments were aimed at evaluating the theoretical maximum power potential at existing dams in the United States. These estimates were based on the best available information at the time for water availability, hydraulic head, and representative regional capacity factors. This study revisits a subset of 3,299 dams identified in the most recent theoretical resource assessment and uses more detailed and updated hydrologic data to produce estimates of technical potential. These improvements in data enable estimates that more realistically reflect what is physically possible given simple assumptions about the existing structure and constraints on flow and head (Figure 1).

13 HYDRO ENERGY

Ductless Heat Pump Energy Monitoring in a Cold Climate

In 2018, the City and Borough of Juneau, Alaska set the goal of reaching 80% renewable energy for heating and transportation by 2045. An important factor to help reach this goal is finding energy efficiency home heating technologies such as ductless air source heat pumps (DHPs), which rely on the local hydropower electric grid to provide space heating for an entire home or a main living area. To help residents reduce energy costs and move toward the community renewable energy goal, a team of local, state, and national partners joined to run Thermalize Juneau 2021, an energy campaign that provided education, a simplified installation process, and a bulk purchase discount. Overall, the campaign enrolled 165 participants, resulting in 75 DHP installations and over 30 energy efficiency improvements. To evaluate the reliability and energy use of the DHPs installed during the Thermalize Juneau campaign, researchers installed energy monitors on heat pumps of 14 participants and conducted interviews with homeowners. Data from two heating seasons (2021-2022 and 2022-2023) has allowed researchers to examine the accuracy of pre-campaign energy savings predictions, establish energy savings for a small group of households, and provide insights on the energy use and occupant satisfaction of DHPs which will help to inform future heat pump deployment efforts in the area.

air source heat pump

Small Hydro Power Plants with Integrated BESS for Enhance Resiliency

Battery energy storage systems (BESS) are an important asset for power systems with high integration levels of renewable energy, and they can be controlled to provide various services to the grid. This paper presents the hardware demonstration and characterization of using a utility-scale BESS with grid-following (GFL) and grid-forming (GFM) controls and a run-of-river (ROR) hydropower plant to perform a bottom-up power system black start that enhances power systems' resiliency. ROR hydropower plants are generally not used for power system restoration due to their frequency instability during islanded operation; however, BESS with droop control can provide critical damping to convert a ROR hydropower generator into a black start- capable unit. To demonstrate this, we carry out hardware experiments at the megawatt-scale integrating a synchronous generator driven by a dynamometer, an actual GFL/GFM BESS, a medium-voltage impedance network, and a load bank. The demonstration shows the different roles of BESS with GFL and GFM control in power system restoration. GFL BESS can suffer from high-frequency oscillations, even instability, depending on the droop control gain and loading condition. The results provide further insights for system operators on how GFL- or GFM controlled BESS can enhance grid stability and how hydro-BESS hybrids can operate as a black-start-capable unit. The presented experimental results are also a valuable resource to understand the different stability characteristics of real-world BESS with different control modes.

24 POWER TRANSMISSION AND DISTRIBUTION

Corrosion Fatigue Life Evaluation of 17-4PH in Support of Water Filled Turbine Hubs

High cycle corrosion fatigue (HCCF) life S-N tests were conducted on wrought 17-4PH in various water environments under accelerated testing conditions. For tests conducted in aerated Columbia River water and in aerated ASTM Type IV water, at ~10 6 cycles, the HCCF stress amplitude was ~70% of the value in air. For deaerated water, the value was ~80%. These values are consist with the small amount of literature data on HCCF life of 17-4PH in water environments. The measured fatigue life both in air and water are much better than the ASME trend curve of high cycle fatigue life of moderate and high strength steels. Measured values were also much better than found in a hydropower-relevant study in the literature on cast 17-4PH. The effect of Amersite 61W on HCCF life was evaluated and found to cause very low times to specimen failure compared to all other water environments.

13 HYDRO ENERGY

Methods for Assessing Opportunities for Ring Dam Pumped Storage Hydropower

There is growing interest in new pumped storage hydropower (PSH) deployment to provide a range of grid flexibility, reliability, and resiliency services under an evolving and uncertain future power sector. The National Laboratory of the Rockies develops open PSH resource assessment and cost modeling tools to help evaluate PSH deployment opportunities, and this report describes expansions to those tools to consider an additional PSH system configuration - ring-dam reservoirs built on flat topographical features that are constructed from roller-compacted concrete material. This reservoir type is common among current PSH proposals and requires new methods to identify sites with this reservoir geometry throughout the United States and characterize the associated dam cost. Cost characterization for ring dam reservoirs required collecting historical dam cost data for earthen, rockfill, and roller-compacted concrete dams and regressing equations that relate costs between alternative materials. The ring dam site identification algorithm follows a 5-step procedure to identify circular geometry reservoirs. Once ring dam reservoirs are identified, they are then paired with potential dry-gully reservoirs, and the full set of potential paired reservoirs is cost-optimized to produce a least-cost set of potential PSH sites with no overlapping reservoirs. The resulting analysis found 1,663 ring-dam to dry-gully systems in the contiguous United States that are lower cost than any overlapping dry-gully to dry-gully systems, 29 in Alaska, and none in Hawaii or Puerto Rico. These systems constitute 1.5 TW of capacity in the contiguous United States and nearly 29 GW in Alaska, demonstrating that under suitable topography and head, ring-dam systems can provide cost-effective PSH opportunities. The greatest density of these opportunities are found in the intermountain west where there are mesas and flat land at bases of mountain ranges, but continued work could incorporate additional site characteristics or consider more complex reservoir shapes to find additional PSH deployment opportunities.

13 HYDRO ENERGY

Pumped Storage Hydropower Operation & Maintenance Cost Estimation

The National Laboratory of the Rockies (NLR) develops and hosts a pumped storage hydropower (PSH) cost model that is the most detailed bottom-up PSH cost model available to the public. It is available both as a spreadsheet and an interactive web tool, enabling users with a variety of PSH interests to transparently characterize costs of alternative PSH sites and designs. The NLR PSH cost model was designed originally to consider only upfront capital costs only. This slide deck describes methodology to expand the cost model to include operations and maintenance (OM) costs. OM costs are characterized as five distinct components with unique sources and methods for cost estimation. By combining methods for each of these components into a cumulative OM cost estimate, these methods allow a more complete estimation of total OM costs that agrees with existing literature values. The methods are scalable and transparent, allowing them to be readily to applied to any prospective PSH facility for a representative preliminary OM cost estimate in advance of detailed site-specific engineering and other studies.

13 HYDRO ENERGY