Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “site built”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Modular Multi-family Construction: A Field Study of Energy Code Compliance and Performance through Offsite Prefabrication

Prefabrication in a controlled, factory setting may improve the energy code compliance and energy performance of modular buildings compared to traditional site-built buildings. To test this premise, the work detailed in this DOE-funded commercial field study (EE0009082) compares the energy code compliance of 25 modular and 30 site-built multifamily buildings under construction in Los Angeles, San Francisco, Philadelphia and Seattle representing climate zones 3B, 3C, 4A and 4C respectively. This dataset includes full data on 20 modular and site-built buildings and partial data on 35 modular and site-built buildings that had started prior to or were completed after the 18-month data collection period. This study also compares the post-occupancy energy performance or energy use intensity (EUI) of an additional 23 modular multifamily buildings and 128 site-built multifamily buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Scalable and Cost-Effective Solution to the U.S. Housing Crisis: A Case Study on Locally Manufactured Modular Multifamily Housing

This case study assesses waste management efficiencies in modular buildings compared to traditional construction methods. We focus on the modular 1-bedroom Model/Z unit by Model Z Modular, LLC. As part of the collaboration between Model Z Modular and the National Renewable Energy Laboratory, we analyzed waste metrics from design through construction, contrasting these findings against conventional stick-built and site-built multifamily buildings. The Model/Z unit is part of a strategic effort to address affordable housing shortages in South Los Angeles, where household income challenges are pronounced. The unit is produced in a state-of-the-art 150,000 sq. ft. modular manufacturing facility located within the city it is serving, and has so far supported the production of over 1,500 affordable housing units. Model/Z units have been used in projects with as many as 195 units, achieving large economies of scale and time. Our analysis demonstrates that modular construction reduces waste compared to traditional methods. This reduction is achieved through precise prefabrication techniques, the implementation of new framing methods, the concentration of workforce expertise, and streamlined logistics, which optimize material use and greatly reduce on-site handling. Additionally, local manufacturing minimizes transportation needs, improving overall project efficiency. The Model/Z unit exemplifies a scalable solution for enhancing housing affordability by optimizing resource utilization and minimizing associated costs. These methods support the delivery of high-quality units at reduced expenses, addressing critical urban housing shortages effectively. This case study underscores Model Z Modular's commitment to producing affordable, quality housing while fostering economic opportunities through job creation and training programs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Multifamily Air Leakage Evaluation: A Modular Case Study

The purpose of this case study is to compare the air leakage rates of modular and site-built multifamily dwelling units. The methods, materials, and equipment were observed to be very similar in the modular and site-constructed units in this case study. The installation quality of building envelope measures such as insulation and air barrier appeared to be better for modular construction, because they were installed in a controlled, factory setting. Through field observations, we identified cosmetic damage to the envelope of modular units following transport to the building site, but with no resulting significant air leakage pathways. However, we did see air leakage pathways resulting from field modifications to the envelope of modular units to accommodate structural and mechanical connections. We found that the extensive use of through-wall HVAC systems, combined with the transport, placement, and rework of modular units may compromise the high-quality envelope installation and airtightness observed in the factory without careful planning and/or design. Opportunities for improvement identified from the tested modular dwelling units include minimizing and optimally locating penetrations, pre-cutting and detailing penetrations at the factory where possible, properly sealing field modifications, and using split HVAC systems in place of through-wall packaged systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

IEA Wind TCP Task 49: Reference Site Conditions for Floating Wind Arrays

This report, prepared within Work package 1 of IEA Wind Task 49, presents reference site conditions for floating wind arrays to serve as a design basis for the techno-economic design of reference floating wind arrays. Data of the reference sites presented here are publicly available in an open database and thus support fast development and comparable design of floating wind arrays for various relevant conditions. The development of these reference sites drew on existing open access datasets and ongoing research projects of task participants. Six classes were identified that describe relevant key conditions for the design and development of floating wind arrays: met-ocean conditions, seabed conditions, coastal infrastructure, environmental impact, socio-economic impact, as well as regulations and permissions. The reference sites for the techno-economic design of floating wind arrays are based on a concept with building blocks to synthesize purpose-built site representations. In each of the identified classes with influencing design factors, building blocks are used to describe the characteristic properties and their spread. However, the latter three classes (i.e., environmental impact, socio-economic impact, regulations and permissions) are not included in the reference site conditions due to limited knowledge and lack of reliable criteria to quantify their impact on the techno-economic design in numeric parameters. Building blocks with key parameters for the techno-economic design of floating wind arrays are provided for met-ocean conditions, seabed conditions, and coastal infrastructure. For met-ocean conditions, multiple sites were selected for detailed analysis that represent a range of conditions across the pipeline of floating wind projects. Wind conditions and sea states are separated, and each location considers both the severity of wind and waves e.g. one site may have a moderate wave condition but severe wind condition. From this pipeline, eleven representative sites were selected where both site-specific analysis was available within the consortium, and where they represent different parts of the global pipeline. The eleven sites are: Hannibal (Italy), Humboldt (US), Ulsan (South Korea), MoneyPoint One (Ireland), Havbredey (UK), Fukushima (Japan), Utsira Nord (Norway), Gulf of Maine (US), Sud de la Bretagne II (France), Sorlige Nordsjo II (Norway). Each of these sites is summarized in the main report while more details about the studies and analyses behind the datasets are provided in the appendix. For seabed conditions, general information about the geotechnical parameters is provided and a baseline is established for the geotechnical parameters and stratigraphy that may be encountered on the sites. A set of six 'synthetic cases' is defined as building blocks providing the different parameters required for design under each case/soil condition. For the coastal infrastructure, general information about the main requirements is provided that a port should comply with to provide a satisfactory service during the construction of floating offshore wind arrays. Minimum port infrastructural requirements are provided for three types of ports.

17 WIND ENERGY↗

Lab Evaluation of Downward Capacity of Radiant Ceiling Panel Systems

This project investigated the cooling delivery effectiveness of radiant ceiling panels as a function of attic insulation level using multiple laboratory testing and analytical methodologies. Delivery effectiveness is the heating or cooling energy delivered to a conditioned space divided by the total heating or cooling energy added or removed by the space conditioning system. The lower the losses of the heating or cooling delivery method, the higher the delivery effectiveness. For ducted systems, delivery effectiveness is reduced by both air leakage and thermal losses (especially if the ducts are installed in attics), while the delivery effectiveness of a radiant system supplied by hot and cold water is only reduced by thermal losses, which can be mitigated by sufficient insulation above, or at the "back" of the panel. Being installed at or below the ceiling plane, sufficient back insulation should be provided by default in the form of the attic insulation above the radiant ceiling panels. Site-built radiant ceiling panels were evaluated at Frontier Energy’s Building Science Research Laboratory (BSRL) in a uniquely designed environmental test chamber with independently controllable indoor and attic spaces and a height-adjustable ceiling.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Benefits Of Automated Construction And Energy Efficiency Measures In Modular Homes

This article builds on and adds to a Buildings XV publication that introduced the Transformative Efficiency and Automation in Modular Homes (TEAMH) project. The TEAMH project sought to develop a scalable solution for producing modular homes with 20-50% energy savings and similar cost relative to site-fabricated single-family home construction. A key aspect of the project was assessing the potential for labor cost reductions through automation-assisted construction using light gauge steel (LGS). To quantify the advantages of this approach, side-by-side comparisons were made between traditional wood-framed construction and automation-assisted LGS construction. This demonstration involved constructing one wood-framed wall and several LGS test walls, accompanied by a time-and-motion study. The results indicated that automation assistance could decrease construction time and associated labor costs by as much as 46%. High-performance envelope technologies for exterior insulation and air sealing were evaluated to compare modular homes with site-built homes that meet the International Energy Conservation Code (IECC). A key technology considered was vacuum insulation panels (VIPs) with fiberglass cores. Guarded hot box testing of multiple full-scale wall assemblies containing different combinations of exterior continuous insulation systems containing phenolic foam and VIPs. Testing on various full-scale wall assemblies revealed that, with LGS construction, cavity insulation had minimal impact on exterior wall performance. Omitting cavity insulation can reduce labor and material costs while streamlining manufacturing, as its installation is labor-intensive and not easily automated due to the need for precise placement around wiring and other internal components. Guarded hot box tests of multiple LGS test walls with foam and VIP-based exterior insulation systems achieved R-values of up to 31 hr-ft2-°F/Btu. Finally, building energy modeling of multiple modular home designs indicated that the upgraded envelope assemblies can yield heating energy savings of up to 50% and cooling energy savings of up to 30% compared to IECC 2018 standards.

Shrestha, Som [ORNL] (ORCID:0000000183993797)↗

Nanoscale Periodic Trapping Sites for Interlayer Excitons Built by Deformable Molecular Crystal on 2D Crystal

The nanoscale moiré pattern formed at 2D transition-metal dichalcogenide crystal (TMDC) heterostructures provides periodic trapping sites for excitons, which is essential for realizing various exotic phases such as artificial exciton lattices, Bose–Einstein condensates, and exciton insulators. At organic molecule/TMDC heterostructures, similar periodic potentials can be formed via other degrees of freedom. Here, we utilize the structure deformability of a 2D molecular crystal as a degree of freedom to create a periodic nanoscale potential that can trap interlayer excitons (IXs). Specifically, two semiconducting molecules, PTCDI and PTCDA, which possess similar band gaps and ionization potentials but form different lattice structures on MoS 2 , are investigated. The PTCDI lattice on MoS 2 is distorted geometrically, which lifts the degeneracy of the two molecules within the crystal’s unit cell. The degeneracy lifting results in a spatial variation of the molecular orbital energy, with an amplitude and periodicity of ~0.2 eV and ~2 nm, respectively. On the other hand, no such energy variation is observed in PTCDA/MoS 2 , where the PTCDA lattice is much less distorted. Furthermore, the periodic variation in molecular orbital energies provides effective trapping sites for IXs. For IXs formed at PTCDI/MoS 2 , rapid spatial localization of the electron in the organic layer toward the interface is observed, which demonstrates the effectiveness of these interfacial IX traps.

77 NANOSCIENCE AND NANOTECHNOLOGY↗

Zero Energy Ready Out of the Box

In this conference paper for the ASHRAE Buildings XV conference, December 2022, PNNL staff share key metrics for companies who are combining off site construction with certification to the U.S. Department of Energy’s Zero Energy Ready Home program to create homes that are both cost effective to construct and high performance to live in. Key performance metrics and measures for modular, panelized, and SIP homes are compared against all homes in the DOE Zero Energy Ready Home program and against new homes built to code. These metrics show that off-site construction homes got similar or better energy performance to site-built homes, and in the case of modular and panelized, at considerably lower average cost than site-built homes. The paper also highlights the experiences of two DOE Zero Energy Ready Home builders who employ offsite construction methods. One builder constructs production homes using pre-assembled panels. The other builder designs and ships kit homes all over the United States. The paper will focus on the optimum value engineering aspects of the panelized construction processes used by each builder to identify management and production practices employed by the builders to operate profitably while meeting high energy performance goals, despite a year marked by skyrocketing materials costs and supply chain and labor shortages. Cost and labor savings methods will be discussed in the context of these two unique business models.

U.S. Department of Energy Building Technologies Pr↗

Theoretical Perspective of Promoting Direct Methane-to-Methanol Conversion at Complex Metal Oxide–Metal Interfaces

Direct methane conversion to methanol has been considered as an effective and economic way to release greenhouse effects and current high demand on methanol in industry. However, the process has long been challenging due to lack of viable catalysts to compromise the activation of methane that typically occurs high temperatures and retaining of produced methanol that requires mild conditions. Here, this perspective demonstrates an effective strategy to promote direct methane to methanol conversion by engineering the active sites and chemical environments at complex metal oxide - copper oxide - copper interfaces. Such effort strongly depends on the extensive theoretical studies by combining density functional theory (DFT) calculations and kinetic Monte Carlo (KMC) simulations to provide in-depth understanding of reaction mechanism and active sites, which built the strong basis to enable the identification of design principles and advance the catalyst optimization for selective CH 4 -to-CH 3 OH conversion.

03 NATURAL GAS↗

Modernization of PLC-Based Control Systems at SNS

When the SNS site was built around 20 years ago, the Conventional Facilities (CF) control systems were de-signed using 2 communication protocols to allow pro-grammable logic controllers (PLCs) to interface with motors, variable frequency drives (VFDs), and remote input and output (I/O) devices. The protocol chosen to control motors and VFDs is DeviceNet, a CANbus-based protocol developed by Allen-Bradley, a subsidiary of Rockwell Automation. The protocol chosen to communi-cate with remote I/O is ControlNet, another protocol developed by Allen-Bradley. Both of these protocols are obsolete and present reliability and maintainability is-sues, particularly DeviceNet. As the Control Systems Section at SNS is working to modernize control systems throughout the machine, a major goal for PLC-based systems is to remove the obsolete communication proto-cols in favor of standard, ubiquitous Ethernet. To this end, any new VFDs installed use Ethernet communica-tion. Many VFDs are currently being replaced in the Central Utilities Building (CUB) and the Central Exhaust Facility (CEF) and are being removed from DeviceNet in favor of Ethernet communication. Planning is underway to retrofit Eaton Intelligent Technology motor control centers (MCCs) in the Target Building to remove particu-larly troublesome DeviceNet adaptors and replace them with Ethernet adaptors for each motor starter. The Con-trolNet network in the CUB has been demolished, with I/O drops integrated into a local Ethernet network, im-proving sustainability and maintainability.

Beaushaw, Isaiah [ORNL]↗

Recovery and Refining of Rare Earth Elements from Lignite Mine Wastes

The University of North Dakota (UND), in collaboration with a comprehensive team of technical, business and host-site partners, built on prior technology development to complete a front-end engineering and design (FEED) and business planning study to recover and refine rare earth elements (REE) and critical minerals (CM) from North Dakota (ND) lignite mine wastes. The end of project goal was to have an investment quality project and a committed team ready to commercialize the proposed technologies in a future construction and operations phase.

01 COAL, LIGNITE, AND PEAT↗

Nuclear Waste Attributes of SMRs Scheduled for Near-Term Deployment

The purpose of this study is to evaluate the nuclear waste attributes of Small Modular Reactors (SMRs) scheduled for deployment within this decade using available data and established nuclear waste metrics, with the results compared to a reference large Pressurized Water Reactor (PWR). The current fleet of commercial nuclear reactors in the U.S. is composed of 92 large Light Water Reactors (LWR) with an average electricity generating capacity of over 1,000 MWe each. These large LWRs built on-site in massive construction projects have been the mainstay of the industry for the last 50 years. However, new construction soon is expected to include several designs of smaller reactors primarily fabricated in factories and installed in the field in modules. Some of these SMRs will also be LWRs, while some will use other coolants such as liquid metals, molten salts or gases, and different types of fuels. The technologies and economics of SMRs have been the focus of many studies, but there has been only minimal information published on the amount of nuclear waste different types of SMRs are expected to generate and no reports focused on near-term-deployable designs. In this study, the nuclear waste attributes of three small reactors scheduled for near-term-deployment, VOYGR TM (from NuScale Power), Natrium TM ab (from TerraPower), and Xe-100 (from X-energy), were assessed by comparing nuclear waste metrics with those of a reference large Pressurized Water Reactor (PWR).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CO2 Storage Site Analysis, Screening, and Resource Estimation for Cenozoic Offshore Reservoirs in the Central Gulf of Mexico

The storage potential of hydrocarbon reservoirs in the central Gulf of Mexico (GOM) makes future development of CO2 storage projects in those areas promising for secure, large-scale, and long-term storage purposes. Focusing on the producing and depleted hydrocarbon fields in the continental slope of the central GOM, this paper analyzed, assessed, and screened the producing sands and evaluated their CO2 storage potential. A live interactive CO2 storage site screening system was built in the SAS® Viya system with a broad range of screening criteria combined from published studies. This offers the users a real-time assessment of the storage sites and enables them to adjust the filters and visualize the results to determine the most suitable filter range. The CO2 storage resources of the sands were estimated using a volumetric equation and the correlation developed by the National Energy Technology Laboratory (NETL). The results of this study indicate that 1.05 gigatons of CO2 storage resources are available in the developed reservoirs at the upper slope area of the central GOM. The Mississippi Canyon and Green Canyon protraction areas contain the fields with the largest storage resources.

Hu, Xitong↗

Financial-technical co-design for capital-intensive, resource-responsive energy systems

Because of their capital-intensive operation, wind energy systems that are competitive in terms of the cost of the energy that they produce lead to risk-reward trade-offs that make their business cases less favorable than those of conventional energy generation technologies. However, wind energy systems tend to be designed to maximize energy production or minimize cost of energy rather than to maximize their business cases. In this work, we attempt to exploit designs specifically tailored to business cases. We develop a novel framework for analyzing energy systems that ties their design variables to monthly operating incomes using simple models and historical hourly market and resource data. Using this approach, we demonstrate that for a wind site with abundant wind resource in the California Independent System Operator market, we can control the trade-off between mean and 5th percentile monthly returns by choosing the specific power of the turbine at a fixed modeled initial capital cost. Our framework gives a measure of the risk-reward spectrum of energy generation assets that could be built at a given site with respect to the sub-annual resource/market variation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

ActiveBAS: A Low-cost, Scalable Control Solution for Grid-Interactive Small and Medium Sized Commercial Buildings

This project aims to develop and enhance a low-cost, highly scalable control solution for Small and Medium-Sized Commercial Buildings (SMCB), assess the business potential at multiple sites, and perform commercialization efforts. The technology can be applied to any buildings served by multiple units, with the benefits being greatest for open-spaced buildings, such as banks, retail stores, restaurants, and factories. This project aims to develop an affordable control solution for: 1) SMCB grid responsiveness, 2) reduction of GHG by changing unit operations, 3) greater reduction in utility costs, and 4) rapid adoption in the marketplace. The proposed technology will be built on a previously developed and demonstrated MPC solution. The minimal sensor requirement and less need of control expertise are the unique feature of the algorithm that leads to low capital and maintenance costs, and short installation and implementation time. These attributes contribute to low capital and maintenance costs, as well as a short installation and implementation time. However, these advantages come with a trade-off: increased difficulties and unreliability when applying traditional modeling and MPC control approaches due to limited information. This final report describes the modeling approaches developed and tested to overcome these challenges. It begins by outlining the modeling challenge posed by minimal sensor requirements, then delves into the proposed modeling approaches, which primarily involve system identification. Finally, preliminary test results for a simulation case study are presented.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Lieb-Robinson Bounds with Exponential-in-Volume Tails

Lieb-Robinson bounds demonstrate the emergence of locality in many-body quantum systems. Intuitively, Lieb-Robinson bounds state that, with local or exponentially decaying interactions, the correlation that can be built up between two sites separated by distance 𝑟 after a time 𝑡 decays as exp (𝑣⁢𝑡 −𝑟), where 𝑣 is the emergent Lieb-Robinson velocity. In many problems, it is important to also capture how much of an operator grows to act on 𝑟 𝑑 sites in 𝑑 spatial dimensions. Perturbation theory and cluster expansion methods suggest that, at short times, these volume-filling operators are suppressed as exp (−𝑟 𝑑 ). We confirm this intuition, showing that, for 𝑟 >𝑣⁢𝑡, the volume-filling operator is suppressed by exp (−(𝑟−𝑣⁢𝑡) 𝑑 /(𝑣⁢𝑡) 𝑑−1 ). This closes a conceptual and practical gap between the cluster expansion and the Lieb-Robinson bound. We then present two very different applications of this new bound. Firstly, we obtain improved bounds on the classical computational resources necessary to simulate many-body dynamics with error tolerance 𝜀 for any finite time 𝑡: as 𝜀 becomes sufficiently small, only 𝜀 −O⁡(𝑡 𝑑−1 ) resources are needed. A protocol that likely saturates this bound is given. Secondly, we prove that disorder operators have volume-law suppression near the “solvable (Ising) point” in quantum phases with spontaneous symmetry breaking, which implies a new diagnostic for distinguishing many-body phases of quantum matter.

computational complexity↗

Automated Progress Monitoring in Modular Construction Factories Using Computer Vision and Building Information Modeling

Modular construction methods have recently gained interest due to the advantages offered in terms of safety, quality, and productivity for projects. In this method, a significant portion of the construction is performed off-site in factories where modular components are built in different workstations, assembled on the production line, and shipped to the site for installation. Due to the labor-intensive nature of tasks, cycle times in modular construction factories are highly variable, which commonly leads to major bottlenecks and delays in construction projects. To remedy this effect, recent methods rely on sensors such as RFID to monitor the production process, which is reportedly expensive, and intrusive to the work process. Recently, computer vision-based methods have been proposed to track the production process in modular construction factories. However, these methods overlook monitoring the assembly process on the production line. Therefore, this paper presents a method to monitor the assembly process by integrating computer vision-based methods with Building Information Modeling (BIM). The proposed method detects the modular units using object segmentation; superimposes the installation area with the corresponding 2D region using BIM, and identifies the installation of the components using image processing techniques. The proposed method has been validated using surveillance videos captured from a modular construction factory in the US. Successful implementation of the proposed method can lead to timely identification of delays during the assembly process and reduce delays in modular integrated construction projects.

building information modeling↗