DOE OSTI2025
The WHOLESCALE acronym stands for Water & Hole Observations Leverage Effective Stress Calculations and Lessen Expenses. The goal of the WHOLESCALE project is to simulate the spatial distribution and temporal evolution of stress in the geothermal system at San Emidio in Nevada, United States. To reach this goal, the WHOLESCALE team has developed a methodology to incorporate and interpret data from four methods of measurement into a multi-physics model that couples thermal, hydrological, and mechanical (T H-M) processes. The WHOLESCALE team has applied this methodology at the San Emidio geothermal field, located ~100 km north of Reno, Nevada in the northwestern Basin and Range province. The WHOLESCALE team includes 30 individuals working at two universities, two national laboratories, and one industry partner. Two master-degree students and five post-doctoral researchers have gained professional experience and earned partial financial support via the WHOLESCALE project. The WHOLESCALE team has taken advantage of the perturbations created by changes in pumping operations during planned shutdowns in 2016, 2021, and 2022 to infer temporal changes in the state of stress in the geothermal system at San Emidio, Nevada, U.S. The WHOLESCALE results support the working hypothesis that increasing pore-fluid pressure reduces the effective normal stress acting across fault zones. During normal operations, pumping in deep production wells decreases fluid pressures and thus increases the effective normal stresses on faults, reducing microseismicity. During planned shutdowns, the cessation of production increases pore-fluid pressure and reduces effective normal stress. The WHOLESCALE products generated during the 4-year period between 2020 and 2024 include: three articles published in the open-access, peer-reviewed scientific literature, two master’s theses, 20 presentations or papers at scientific conferences, and 17 data sets available on public repositories. The WHOLESCALE project has been completed in two phases that included three performance periods separated by two Go/No-go Stage Gate Reviews. Tasks were classified by data type (i.e., Geologic Structure, Borehole, Geodesy, Hydrology, Seismology, and Modeling). The first phase of the project started July 31, 2020 and included ongoing project coordination (Task 1), a project kickoff (Task 2), analysis of existing data (Task 3), development of the initial stress model & deployment design (Task 4), and Go/No-go Decision Point #1 (Task 5). Phase II began with implementing the 2022 deployment (Task 6), followed by Go/No-go Decision Point #2 (Task 7) The remainder of Phase II consisted of analyzing data collected during deployment (Task 8), calibration of the stress model on all observations (Task 9), and the Final Review (August 23, 2024) & Reporting (Task 10).